• Title/Summary/Keyword: Requirement and Process

Search Result 1,346, Processing Time 0.032 seconds

On the Construction of Requirements DB to Improve the Work Environment of Locomotive Cabs (철도차량 운전실의 작업환경 개선을 위한 요구사항 DB 구축에 관한 연구)

  • Sim, Sang-Hyun;Lee, Jae-Chon;Park, Chan-Woo
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.71-79
    • /
    • 2011
  • The work environment of locomotive cabs has long been an important issue in the design of railload systems since it is quite critical in terms of system's operational safety. It is getting more attention as the running speed of the trains goes up these days. To this end, this paper describes how to systematically construct a DB for the requirements set in the course of the improvement process for the aforementioned cab work environment. As a solution approach, we have adopted the requirement architecture concept to cover the whole activities required to do such as in requirements generation, DB construction, change management, and traceability management. Specifically, based on the requirement architecture framework a requirement process to collect requirements for improvement is discussed, and the guide lines are suggested for verification and validation of the developed requirements. In addition, a base schema and requirements templates are developed, which will be used in generating requirements and constructing a DB. Finally, it is demonstrated how the requirements DB for locomotive cabs can be constructed using a computer-aided tool in an integrated fashion.

Pretension process control based on cable force observation values for prestressed space grid structures

  • Zhou, Zhen;Meng, Shao-Ping;Wu, Jing
    • Structural Engineering and Mechanics
    • /
    • v.34 no.6
    • /
    • pp.739-753
    • /
    • 2010
  • Pointing to the design requirement of prestressed space grid structure being the target cable force, the pretension scheme decision analysis method is studied when there's great difference between structural actual state and the analytical model. Based on recursive formulation of cable forces, the simulative recursive system for pretension process is established from the systematic viewpoint, including four kinds of parameters, i.e., system initial value (structural initial state), system input value (tensioning control force scheme), system state parameters (influence matrix of cable forces), system output value (pretension accomplishment). The system controllability depends on the system state parameters. Based on cable force observation values, the influence matrix for system state parameters can be calculated, making the system controllable. Next, the pretension scheme decision method based on cable force observation values can be formed on the basis of iterative calculation for recursive system. In this way, the tensioning control force scheme that can meet the design requirement when next cyclic supplemental tension finished is obtained. Engineering example analysis results show that the proposed method in this paper can reduce a lot of cyclic tensioning work and meanwhile the design requirement can be met.

High Throughput Radix-4 SISO Decoding Architecture with Reduced Memory Requirement

  • Byun, Wooseok;Kim, Hyeji;Kim, Ji-Hoon
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.14 no.4
    • /
    • pp.407-418
    • /
    • 2014
  • As the high-throughput requirement in the next generation communication system increases, it becomes essential to implement high-throughput SISO (Soft-Input Soft-Output) decoder with minimal hardware resources. In this paper, we present the comparison results between cascaded radix-4 ACS (Add-Compare-Select) and LUT (Look-Up Table)-based radix-4 ACS in terms of delay, area, and power consumption. The hardware overhead incurred from the retiming technique used for high speed radix-4 ACS operation is also analyzed. According to the various analysis results, high-throughput radix-4 SISO decoding architecture based on simple path metric recovery circuit is proposed to minimize the hardware resources. The proposed architecture is implemented in 65 nm CMOS process and memory requirement and power consumption can be reduced up to 78% and 32%, respectively, while achieving high-throughput requirement.

Development of Requirement Taxonomy for Design Bases Management during NPP lifecycle (원전 생애주기간 설계기준 정보관리를 위한 요건 분류체계 개발)

  • Kim, Jong-Myeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.134-135
    • /
    • 2018
  • Nuclear Power Plant consists of about 1.4 million facilities. and the design standards and design requirements for the continuos utilization and safety of facilities are complexly connected with the facilities. When a design change for facilities or design requirements is occurred at the time of construction or operation, there are a lot of facilities, design requirements, and design bases that are affected by the facilities or design bases being changed. The above design changes are so complex that the existing document-bases design change process is time-consuming and may also cause human error. In this study, we developed a design requirement taxonomy that can be applied to the data-centric design bases document that can improve it. To do this, we analyze the design elements from the highest level to the lowest level applied to the nuclear power plant, and classify the design elements according to the characteristics of the design elements.

  • PDF

A Quantitative ERRC Analysis Method via Requirements Cost Estimation (요구사항의 비용산출을 통한 정량적인 ERRC 분석 방법)

  • Eom, Jeong-Yong;Kim, Neung-Hoe;Lee, Dong-Hyun;In, Hoh Peter
    • Journal of Information Technology Services
    • /
    • v.8 no.1
    • /
    • pp.113-124
    • /
    • 2009
  • Value-based requirements engineering process, called The ViRE(Value-Innovative Requirement Engineering) was suggested to create an uncontested market using ERRC(Eliminate, Reduce, Raise, Create) requirements analysis. But ViRE did not provides a quantitative data analysis method for ERRC decision so as to make objective decisions for customers. In this paper, to solve this problem, we suggest a quantitative ERRC analysis method by estimating requirements cost. Our method defines user requirements and decides their weight. Then, it makes quality level table for all the identified requirements and function modules and estimate implementation cost based on their quality levels. Finally, assess each requirement's impact and then evaluate ERRC value. We could get the more objective ERRC values by evaluate the requirement weight. functional module weight, and implementation cost. And we proved the efficiency of our model by a case study, smart student ID system.

TRIZ Problem Definition through Requirements Engineering (요건공학을 통한 TRIZ 문제정의)

  • Jeong, Jin-Ha;Park, Young-Won
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.19 no.4
    • /
    • pp.440-448
    • /
    • 2010
  • Recently, there are many corporations, schools and institutes that apply TRIZ to solve technical problems. However, in reality, only a few cases of brainstorming applications exist in utilizing forty principles of TRIZ due to the difficulty at TRIZ problem definition. In order to facilitate TRIZ applications, this study proposes the utilization of requirement definition and description tool of systems engineering in TRIZ problem definition. No requirement definition exists in general problem types that TRIZ approach is used in implementing system solution. At most of problem situations, TRIZ users reversely infer that certain problem belongs to which requirement definition it is and recommends TRIZ tools to be used for the exact problem definition. This study also proposes TRIZ problem definition method by applying the results of requirement definition process. The application of TRIZ is demonstrated to the general situation with no problem definition where the proposed method enables the proper use of TRIZ.

INTERACTIVE SYSTEM DESIGN USING THE COMPLEMENTARITY OF AXIOMATIC DESIGN AND FAULT TREE ANALYSIS

  • Heo, Gyun-Young;Lee, Tae-Sik;Do, Sung-Hee
    • Nuclear Engineering and Technology
    • /
    • v.39 no.1
    • /
    • pp.51-62
    • /
    • 2007
  • To efficiently design safety-critical systems such as nuclear power plants, with the requirement of high reliability, methodologies allowing for rigorous interactions between the synthesis and analysis processes have been proposed. This paper attempts to develop a reliability-centered design framework through an interactive process between Axiomatic Design (AD) and Fault Tree Analysis (FTA). Integrating AD and FTA into a single framework appears to be a viable solution, as they compliment each other with their unique advantages. AD provides a systematic synthesis tool while FTA is commonly used as a safety analysis tool. These methodologies build a design process that is less subjective, and they enable designers to develop insights that lead to solutions with improved reliability. Due to the nature of the two methodologies, the information involved in each process is complementary: a success tree versus a fault tree. Thus, at each step a system using AD is synthesized, and its reliability is then quantified using the FT derived from the AD synthesis process. The converted FT provides an opportunity to examine the completeness of the outcome from the synthesis process. This study presents an example of the design of a Containment Heat Removal System (CHRS). A case study illustrates the process of designing the CHRS with an interactive design framework focusing on the conversion of the AD process to FTA.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

Study on Application Method of QFD in the Test Evaluation Phase in Connection with Se Process (SE 프로세스와 연계한 시험평가 단계의 QFD 적용방안 연구)

  • Park, Jong Wan;Lee, Jae Woo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.2
    • /
    • pp.1-7
    • /
    • 2018
  • The research and development stage can improve the goal level of the project through systematic operation and management of systems engineering. The test evaluation tasks in the R&D process have a lot of connections with the system engineering in terms of requirement management, and the methodology for deriving the requirements when establishing the test evaluation items has been consistently required. In this paper, we propose the process of effectively establishing and using QFD (Quality Function Deployment), a tool to manage customer requirement, and drawing up HOQ (House of Quality) in the search and exploratory development stage of the self - propelled mortar project.

Effect of Human Related Factors on Requirements Change Management in Offshore Software Development Outsourcing: A theoretical framework

  • Mehmood, Faisal;Zulfqar, Sukana
    • Soft Computing and Machine Intelligence
    • /
    • v.1 no.1
    • /
    • pp.36-52
    • /
    • 2021
  • Software development organizations are globalizing their development activities increasingly due to strategic and economic gains. Global software development (GSD) is an intricate concept, and various challenges are associated with it, specifically related to the software requirement change management Process (RCM). This research aims to identify humans' related success factors (HSFs) and human-related challenges (HCHs) that could influence the RCM process in GSD organizations and propose a theoretical framework of the identified factors concerning RCM process implementation. The Systematic Literature Review (SLR) method was adopted to investigate the HSFs and HCHs. Using the SLR approach, a total of 10 SFs and 10 CHs were identified. The study also reported the critical success factors (HCSFs) and critical challenges (HCCHs) for RCM process implementation following the factors having a frequency 50% as critical. Our results reveal that five out of ten HSFs and 4 out of ten HCHs are critical for RCM process implementation in GSD. Finally, we have developed a theoretical framework based on the identified factors that indicated a relationship among the identified factors and the implementation of the RCM process in the context of GSD. We believe that the results of this research can help tackle the complications associated with the RCM in GSD environment, which is vigorous to the success and progression of GSD organizations.