• Title/Summary/Keyword: Replacement cost method

Search Result 154, Processing Time 0.035 seconds

Burn-in When Repair Costs Vary With Time

  • Na, Myung-Hwan;Lee, Sangyeol
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.1
    • /
    • pp.142-147
    • /
    • 2003
  • Burn-in is a widely used method to eliminate the initial failures. Preventive maintenance policy such as block replacement with minimal repair at failure is often used in field operation. In this, paper burn-in and maintenance policy are taken into consideration at the same time. The cost of a minimal repair is assumed to be a non-decreasing function of its age. The problems of determining optimal burn-in times and optimal maintenance policy are considered.

Burn-in When Minimal Repair Costs Vary With Time

  • Na, Myung-Hwan;Lee, Sang-Yeol
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2002.11a
    • /
    • pp.147-151
    • /
    • 2002
  • Burn-in is a widely used method to eliminate initial failures. Preventive maintenance policy such as block replacement with minimal repair at failure is often used in field operation. In this paper burn-in and maintenance policy are taken into consideration at the same time. The cost of a minimal repair is assumed to be a non-decreasing function of its age. The problems of determining optimal burn-in times and optimal maintenance policy are considered.

  • PDF

A study on the wear and replacement characteristics of the disc cutter through data analysis of the large diameter slurry shield TBM field (대구경 이수식 쉴드TBM 현장의 데이터 분석을 통한 디스크커터의 마모 및 교체 특성 연구)

  • Park, Jinsoo;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.57-78
    • /
    • 2022
  • The disc cutter and cutterbit, which are the most important factors to increase the excavation efficiency of TBM, are key factors in the design and construction of the cutter head. The arrangement, spacing, number, size, and material of disc cutters suitable for the ground conditions determine the success or failure of TBM construction. The disc cutter, which is a representative consumable part in TBM construction, can cause enormous disruption to the construction cost as well as the construction cost unless accurate prediction of wear and replacement cycle is accompanied. Therefore, in this study, the method of calculating the replacement cycle of the disc cutter calculated at the time of design for the slurry shield TBM field, and the depth of wear and replacement location of the disc cutter that occurred during actual construction were compared by analyzing the field data. For a quantitative comparison, weathered soil/weathered rock, soft rock, and hard rock were classified according to the ground in the section showing constant excavation data, and the trajectory of circle was different depending on the location of the disc cutter, so it was compared and analyzed.

IT-based Technology An Efficient Global Buffer Management ,algorithm for SAN Environments (SAN 환경을 위한 효율적인 전역버퍼 관리 알고리즘)

  • 이석재;박새미;송석일;유재수;이장선
    • The Journal of the Korea Contents Association
    • /
    • v.4 no.3
    • /
    • pp.71-80
    • /
    • 2004
  • In distributed file-systems, cooperative caching algorithm which owns the data cached at each node jointly is used to reduce an expense of disk access. Cooperative caching algorithm is the method that increases a cache hit-ratio and decrease a disk access as it holds the cache information of distributed systems in common and makes cache larger virtually. Recently, several cooperative caching algorithms decrease the message costs by using approximate information of the cache and increase the cache hit-ratio by using local and global cache fields dynamically. And they have an advantage that increases the whole field hit-ratio by sending a replaced buffer to the idle node on buffers replacement in order to maintain the replaced cache in the cache field. However the wrong approximate information deteriorates the performance, the consistency maintenance goes to great expense to exchange messages and the cost that manages Age-information of each node to choose the idle node increases. In this thesis, we propose a cooperative cache algorithm that maintains correct cache information, minimizes the maintenance cost for consistency and the management cost for buffer Age-information. Also, we show the superiority of our algorithm through the performance evaluation.

  • PDF

A Study on the Cost Analysis of risk facilities using e-Consequence Analysis - Focusing Steel pipe Industry (e-CA(e-Consequence Analysis)를 활용한 위험설비의 비용 분석에 관한 연구 : 강관제조업 사례를 중심으로)

  • Kwon, Hyeok Min;Hwang, Yong Woo;Lee, Ik Mo;Chun, Young Woo;Choi, Young Hun
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.3
    • /
    • pp.27-36
    • /
    • 2018
  • The steel pipe manufacturing industry deals with facilities and materials. Especially thermal facilities are close to vapor cloud explosion (VCE) and may cause secondary damage to facilities because they deal with corrosive substances such as hydrofluoric acid, sulfuric acid and acid, fire, explosion, leakage etc. It is in danger. In this study, hazard identification method was conducted using HAZOP techniques and quantitative risk analysis was conducted using e-CA, a program that supports accident impact analysis. Equipment in the influence range of ERPG - 3 was determined to be a facility requiring replacement. It was decided that neutralization is necessary using slaked lime. Based on the cost of loss, We presented the proper replacement which is the timing of the dangerous facility. As a result, It was ideal to replace the facilities with 20 years of heat treatment facilities, one year of hydrofluoric acid storage tank, 20 years of sulfuric acid storage tank, and 5 years of hydrochloric acid storage tank.

A study on economical introduction of RFID system in the small and medium 3rd Party Logistics (3자 물류 중소기업에 경제적인 RFID 시스템 도입을 위한 연구)

  • Kim, Ki-Hong;Shin, Seung-Jun;Choi, See-Yeong;Yeo, Jun-Ho;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.117-126
    • /
    • 2008
  • RFID system the key technology of ubiquitous era, has been emphasized in logistics. Logistic enterprises are required to apply RFID systems considering their investment costs, actual effectiveness, operational satisfaction and so on. For such a purpose, many applicable methods of RFID system have been developed A method that RFID tags are directly attached to products or pallets is utilized in most cases. However, this method requires expensive investment cost, frequent replacement of damaged tags for the small and medium (SM) third party logistics. In this paper, we analyze statistically the current status and requirements of SM third party logistics. Based on their requirements, we propose the realtime warehousing-delivery management by the method to attach a RFID tag to each warehouse rack, together with the economy analysis index in order to evaluate economical efficiency. Consequently, this method is expected to reduce Investment cost and to improve operational effectiveness and satisfaction.

A Study on Condition-based Maintenance Policy using Minimum-Repair Block Replacement (최소수리 블록교체 모형을 활용한 상태기반 보전 정책 연구)

  • Lim, Jun Hyoung;Won, Dong-Yeon;Sim, Hyun Su;Park, Cheol Hong;Koh, Kwan-Ju;Kang, Jun-Gyu;Kim, Yong Soo
    • Journal of Applied Reliability
    • /
    • v.18 no.2
    • /
    • pp.114-121
    • /
    • 2018
  • Purpose: This study proposes a process for evaluating the preventive maintenance policy for a system with degradation characteristics and for calculating the appropriate preventive maintenance cycle using time- and condition-based maintenance. Methods: First, the collected data is divided into the maintenance history lifetime and degradation lifetime, and analysis datasets are extracted through preprocessing. Particle filter algorithm is used to estimate the degradation lifetime from analysis datasets and prior information is obtained using LSE. The suitability and cost of the existing preventive maintenance policy are each evaluated based on the degradation lifetime and by using a minimum repair block replacement model of time-based maintenance. Results: The process is applied to the degradation of the reverse osmosis (RO) membrane in a seawater reverse osmosis (SWRO) plant to evaluate the existing preventive maintenance policy. Conclusion: This method can be used for facilities or systems that undergo degradation, which can be evaluated in terms of cost and time. The method is expected to be used in decision-making for devising the optimal preventive maintenance policy.

Heating Energy Saving and Cost Benefit Analysis According to Low-Income Energy Efficiency Treatment Program - Case Study for Low-Income Detached Houses Energy Efficiency Treatment Program (저소득층 에너지효율개선사업에 따른 난방에너지 절감 효과 및 경제성 분석 - 저소득층 단독주택 단열개선을 중심으로 -)

  • Kim, Jeong-Gook;Lee, Junghun;Jang, Cheolyong;Song, Doosam;Yoo, Seunghwan;Kim, Jonghun
    • KIEAE Journal
    • /
    • v.16 no.5
    • /
    • pp.39-45
    • /
    • 2016
  • Purpose: The purpose of this study is to analyze the energy saving and cost benefit analysis of the Low-income Energy Efficiency Treatment Program supported by KOREF(Korea Energy Foundation). This program was launched in 2007 and performs building energy retrofit for the low-income and energy poverty houses. Method: Energy simulation and cost benefit analysis were accomplished for the low-income detached houses. The structure of detached house was a lot og block structure, wood frame (single glass) and concrete roof. Baseline model of the low-income detached houses was proposed. Result: Annual heating energy consumptions were decreased by about 3.2% with the window system replacement(Case 1), 9.3% with reinforcement of insulation(Case2), and 12.5% with both(Case 3) compared to those of baseline model. The construction cost will be recouped within 5 years for the Case 1, 3 years for the Case 2, and 3 years for the Case 3. Case 3 was the most cost beneficient construction method in the analyzed cases in this study.

RELIABILITY-BASED COMPONENT DETERIORATION MODEL FOR BRIDGE LIFE-CYCLE COST ANALYSIS

  • Rong-yau Huang;Wen-zheng Hsu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.386-397
    • /
    • 2007
  • One major development in bridge life cycle cost analysis (LCCA) in recent years is to develop deterioration model for bridge components so that the times of repair/replacement throughout a component's life span can be properly determined. Taiwan also developed her own bridge LCCA model in 2003, integrating with the bridge inspection database in the local bridge management system (T-BMS). Under the framework of the local LCCA model, this study employs the reliability method in developing a deterioration model of bridge components. A component deteriorates through time in its reliability, which represents the probability of a component's condition index exceeds a user specified threshold. Model assumptions and rationale are described in the paper. The steps for applying the developed model are explained in detail. Results and findings are reported.

  • PDF

A Methodology of Seismic Damage Assessment Using Capacity Spectrum Method (능력 스펙트럼법을 이용한 건물 지진 손실 평가 방법)

  • Byeon, Ji-Seok
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.9 no.3 s.43
    • /
    • pp.1-8
    • /
    • 2005
  • This paper describes a new objective methodology of seismic building damage assessment which is called Advanced Component Method(ACM). ACM is a major attempt to replace the conventional loss estimation procedure, which is based on subjective measures and the opinions of experts, with one that objectively measures both earthquake intensity and the response ol buildings. First, response of typical buildings is obtained analytically by nonlinear seismic static analysis, push-over analyses. The spectral displacement Is used as a measure of earthquake intensity in order to use Capacity Spectrum Method and the damage functions for each building component, both structural and non-structural, are developed as a function of component deformation. Examples of components Include columns, beams, floors, partitions, glazing, etc. A repair/replacement cost model is developed that maps the physical damage to monetary damage for each component. Finally, building response, component damage functions, and cost model were combined probabilistically, using Wonte Carlo simulation techniques, to develop the final damage functions for each building type. Uncertainties in building response resulting from variability in material properties and load assumptions were incorporated in the Latin Hypercube sampling technique. The paper also presents and compares ACM and conventional building loss estimation based on historical damage data and reported loss data.