• 제목/요약/키워드: Replacement Time

검색결과 1,363건 처리시간 0.027초

교체-수리보증이 종료된 이후의 예방보전정책 (Preventive maintenance policy following the expiration of replacement-repair warranty)

  • 정기문
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제12권2호
    • /
    • pp.57-66
    • /
    • 2012
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of replacement-repair warranty. Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Efficient Document Replacement Policy by Web Site Popularity

  • Han, Jun-Tak
    • International Journal of Contents
    • /
    • 제3권1호
    • /
    • pp.14-18
    • /
    • 2007
  • General replacement policy includes document-based LRU or LFU technique and other various replacement policies are used to replace the documents within cache effectively. But, these replacement policies function only with regard to the time and frequency of document request, not considering the popularity of each web site. In this paper, we present the document replacement policies with regard to the popularity of each web site, which are suitable for modern network environments to enhance the hit-ratio and efficiently manage the contents of cache by effectively replacing documents on intermittent requests by new ones.

고장형태(故障形態)를 고려한 다부품장비(多部品裝備)의 보전모형(保全模型) (Maintenance Model for Multi-Component System Considering Failure Types)

  • 정영배
    • 품질경영학회지
    • /
    • 제18권2호
    • /
    • pp.33-42
    • /
    • 1990
  • This paper proposes the maintenance model of multi-component system when the failure characteristics and types of components are considered. In this model, it is assumed that a system is composed of a critical component, a major component and a minor component. Also, failure types is classified into major failure and minor failure. If major failure occurs to critical component before system age replacement time, the system is renewed. If major failure does not occur until its age replacement time, preventive maintenance is performed at age replacement time T. Minimal repairs are carried out after each minor failure. Major component is minimal-repaired if any failure is discovered during operation. Minor component should be replaced as soon as any failure is found. This paper determines the optimal replacement time of the system which minimizes total maintenance cost. Numerical example illustrates these results.

  • PDF

Replacement Model Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil;Lim, Jae-Hak
    • Journal of the Korean Data and Information Science Society
    • /
    • 제14권4호
    • /
    • pp.889-901
    • /
    • 2003
  • In this paper, we consider the optimal replacement policies following the expiration of the combination warranty. The combination warranty can be divided into the renewing combination warranty and the non-renewing combination warranty. The criterion used to determine the optimal replacement period is the overall value function based on the expected cost and the expected downtime. Thus, we obtain the expected cost rate per unit time and the expected downtime per unit time for our model. And then the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF

A Random Replacement Model with Minimal Repair

  • Lee, Ji-Yeon
    • Journal of the Korean Data and Information Science Society
    • /
    • 제8권1호
    • /
    • pp.85-89
    • /
    • 1997
  • In this paper, we consider a random replacement model with minimal repair, which is a generalization of the random replacement model introduced Lee and Lee(1994). It is assumed that a system is minimally repaired when it fails and replaced only when the accumulated operating time of the system exceeds a threshold time by a supervisor who arrives at the system for inspection according to Poisson process. Assigning the corresponding cost to the system, we obtain the expected long-run average cost per unit time and find the optimum values of the threshold time and the supervisor's inspection rate which minimize the average cost.

  • PDF

이산 시간을 고려한 시스템의 교체와 수리 비용 최적화 연구 (Optimal Periodic Replacement Policy Under Discrete Time Frame)

  • 이진표
    • 산업경영시스템학회지
    • /
    • 제43권1호
    • /
    • pp.61-69
    • /
    • 2020
  • Systems such as database and socal network systems have been broadly used, and their unexpected failure, with great losses and sometimes a social confusion, has received attention in recent years. Therefore, it is an important issue to find optimal maintenance plans for such kind of systems from the points of system reliability and maintaining cost. However, it is difficult to maintain a system during its working cycle, since stopping works might incur users some troubles. From the above viewpoint, this paper discusses minimal repair maintenance policy with periodic replacement, while considering the random working cycles. The random working cycle and periodic replacement policies with minimal repair has been discussed in traditional literatures by usually analyzing cases for the nonstopping works. However, maintenance can be more conveniently done at discrete time and even during the working cycle in real applications. So, we propose that periodic replacement is planned at discrete times while considering the random working cycle, and moreover provide a model in which system, with a minimal repair at failures between replacements, is replaced at the minimum of discrete times KT and random cycles Y. The average cost rate model is used to determine the optimal number of periodic replacement.

무릎관절 전치환술에 따른 하지 근육의 초음파 영상 구조 변화 (Changes in Ultrasound Imaging of the Lower Limb with regards to TKR)

  • 김문정;윤세원
    • 대한임상전기생리학회지
    • /
    • 제11권1호
    • /
    • pp.21-29
    • /
    • 2013
  • Purpose : The purpose of this study was to determine the changes in ultrasound imaging of the lower limbs in patients with degenerative osteoarthritis who received a total knee replacement (TKR). Methods : The participants for the study were ten patients who were to receive a total knee replacement. Measurements were taken a total of three times: before receiving a total knee replacement, and one week and two weeks after receiving a total knee replacement. The vastus medialis, rectus femoris muscle, tibialis anterior and gastrocnemius muscle were measured using ultrasound imaging. Results : Muscle thickness of the vastus medialis, rectus femoris muscle, tibialis anterior and gastrocnemius muscle had no significant interaction over time whether surgery was performed or not. White area index (WAI) and density of vastus medialis, rectus femoris muscle, tibialis anterior and gastrocnemius muscle had no significant interaction over time whether surgery was performed or not. Conclusion : In conclusion, lower quality muscles were due to a decrease in muscle fiber and an increase in fat fiber. Therefore, initial physical therapy after total knee replacement should consider this point and be designed appropriately as a therapeutic approach for total knee replacement patients.

A Note on Periodic Replacement with Minimal Repair at Failure

  • Park, Young Taek
    • 품질경영학회지
    • /
    • 제12권2호
    • /
    • pp.2-5
    • /
    • 1984
  • 고장시 응급수리(應急修理)가 가능한 부품(部品)의 정기교환정책(政期交換政策)을 예비품(豫備品)의 다량확보가 가능한 경우로 확장하였다. 최적대치기간(最適代置期間)들은 재고유지비(在庫維持費) 때문에 증가수열(增加數列)을 이루었고, 이로부터 최적(最適) l회 예비품(豫備品) 발주량(發注量) 및 최적(最適) 대치기간(代置期間)들을 구할 수 있었다. 각(各) 부품(部品)의 대치기간(代置期間)을 같게 두면 문제가 간단해 지면서도 최소비용(最小費用)에는 별 차(差)가 없었다.

  • PDF

마코프체인 과정을 이용한 1/4ton 기동장비의 대체소요량 결정 (The Determination of Replacement Requirements for 1/4ton Truck by Using Markov Chain Process)

  • 이순기;민계료
    • 한국국방경영분석학회지
    • /
    • 제17권1호
    • /
    • pp.1-24
    • /
    • 1991
  • This report concerns the study of deciding replacement requirements for 1/4ton truck in Korea. Two causes of replacement, accidental loss and wearout are considered in the replacement requirements model which was developed in Defence Logistics Agency. The model represents the state of 1/4 ton truck inventory over time as a finite Markov chain process. An accidental loss rate, yearly usage rates. wearout rates are used in conjuction with the current mileage distribution of the inventory to forecast replacement requirements in future time periods.

  • PDF

Block 대체정책에 관한 연구

  • 배문식
    • ETRI Journal
    • /
    • 제6권3호
    • /
    • pp.17-20
    • /
    • 1984
  • A block replacement policy using items with different reliability is discussed. We devide system unit failure modes into two modes and use less reliable unit when operating unit fails near the planned preventive replacement time. In this policy, item A has two failure modes. Mode-1 failure is removed by minimal repair, mode-2 failure by replacement. If mode-2 failure of item A happens in (0,T- $\delta$). failure item A is replaced by new item A. If mode-2 failure of item A happens in(T-$\delta$,T), failure item A is replaced by new item B. Item B should be cheaper and less durable than item A. Under this policy, we determine the preventive replacement interval T and the interval $\delta$ of item B replacement which minimize the cost rate per unit time.

  • PDF