• 제목/요약/키워드: Replacement Interval

검색결과 130건 처리시간 0.029초

CMB접촉기의 교환주기 결정에 관한 사례연구 (A Case Study on Determining the Replacement Interval for the CMB Contactor)

  • 박민흥;신백철;김철수;최덕호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.191-197
    • /
    • 2009
  • As a case study on determining the replacement interval for the CMB contactor, we analyzed a field failure data during 59 months and through the simulation reliability is analyzed. As a result of analyzing the reliability we estimated parameters and analyzed distribution characteristics. Ultimately using the estimated results and applying the Age Replacement Policy considered the cost information, CMB contactor's replacement interval is determined. Through the comparison, analysis between the replacement interval and manufacturing company's, the necessity of replacement interval that is reflected in our operation circumstances is examined.

  • PDF

Optimal Number of Failures before Group Replacement under Minimal Repair

  • Young Kwan, Yoo
    • 대한안전경영과학회지
    • /
    • 제6권1호
    • /
    • pp.61-70
    • /
    • 2004
  • In this paper, a group replacement policy based on a failure count is analysed. For a group of identical repairable units, a maintenance policy is performed with two phase considerations: a repair interval phase and a waiting interval phase. Each unit undergoes minimal repair at failure during the repair interval. Beyond the interval, no repair is made until a number of failures. The expected cost rate expressions under the policy is derived. A method to obtain the optimal values of decision variables are explored. Numerical examples are given to demonstrate the results.

철도차량의 주기적 교환품의 교환주기 결정에 관한 사례 연구 (A case study on determining the replacement interval for the component in the rolling stock)

  • 김종운;박준서;신백철;김재훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.713-720
    • /
    • 2008
  • This article deals with a case study on determining the replacement interval for the extraction motor in KTX. The reliability is analysed with the field data from 42 months. The effect of the replacement interval on service reliability, availability, safety and lifecycle cost are evaluated through simulation which is done by the commercial tool, Availability Workbench AvSim Module. As the results of the analyses, a new replacement interval is presented to reduce the lifecycle cost while service reliability, safety and availability are satisfactory.

  • PDF

인공심장판막의 재치환술 (Replacement of the Prosthetic Heart Valves -Clinical analysis of 12 cases-)

  • 김덕실;전상훈
    • Journal of Chest Surgery
    • /
    • 제29권2호
    • /
    • pp.164-170
    • /
    • 1996
  • From January 1986 to June 1993, 12 patients Aad required reoperation: 9 had undergone mitral and 3 aortic valve replacement. Five were male and 7 female, and ages ranged from 29 to 61 years. Replacement of the prosthetic heart valve was performed at a mean interval of 98 $\pm$ 1 months after the Hrst operation. In aortic valve replacement patients the mean interval was 115 $\pm$ 2 months and in mitral valve replacement patients 98 $\pm$ 4 months. Primary tissue failure was the most frequent reason of replacement (10 patients) followed by valve thrombosis (1 patient) and prophylactic replacement (1 patient) in order. The most pronounced pathology of the failed prosthetic heart valves seen in the primary tissue failure group was calcification, perforation, shrinkage and tearing of the cusps. There was one early operative death (8.3%) due to intractable low cardiac output and acute renal failure. Eleven early survivors had successful operative results and there was no late death.

  • PDF

Mixed Replacement Designs for Life Testing with Interval Censoring

  • Tai Sup;kesar Singh
    • Communications for Statistical Applications and Methods
    • /
    • 제6권2호
    • /
    • pp.443-456
    • /
    • 1999
  • The estimation of mean lifetimes in presence of interval censoring with mixed replacement procedure are examined when the distribution s of lifetimes are exponential. it is assumed that due to physical restrictions and/or economic constraints the number of failures is investigated only at several inspection times during the lifetime test; thus there is interval censoring. Comparisons of mixed replacement designs are made with those with and without replacement The maximum likelihood estimator is found in an implicit form. The Cramer-Rao lower bound which is the asymptotic variance of the estimator is derived. The test conditions for minimizing the Cramer-Rao lower bound and minimizing the test costs within a desired width of the Cramer-Rao bound have been studied.

  • PDF

An Optimal Block Replacement Policy Using Items with Different Reliability

  • Lie, Chang-Hoon;Bae, Moon-Sik;Chun, Young-Ho
    • 한국국방경영분석학회지
    • /
    • 제10권2호
    • /
    • pp.61-73
    • /
    • 1984
  • A block replacement policy using items with different reliability is discussed. We divide system unit failure modes into two modes and use less reliable unit when operating unit fails near the planned preventive replacement time. In this policy, item A has two failure modes. Mode-1 failure is removed by minimal repair, mode-2 failure by replacement. If mode-2 failure of item A happens in (0, $T-{\delta}$), failure item A is replaced by new item A. If mode-2 failure of item A happens in ($T-{\delta}$, T), failure item A is replaced by new item B. Item B should be cheaper and less durable than item A. Under this policy, we determine the preventive replacement interval $T^{*}$ and the interval ${\delta}^{*}$ of item B replacement which minimize the cost rate per unit time.

  • PDF

필드데이터에 의한 철도차량 신호장치 구성품의 최적 교체주기 결정에 관한 연구 (A Study on Determining the Optimal Replacement Interval of the Rolling Stock Signal System Component based on the Field Data)

  • 박병노;김경화;김재훈
    • 한국안전학회지
    • /
    • 제38권2호
    • /
    • pp.104-111
    • /
    • 2023
  • Rolling stock maintenance, which focuses on preventive maintenance, is typically implemented considering the potential harm that may be inflicted to passengers in the event of failure. The cost of preventive maintenance throughout the life cycle of a rolling stock is 60%-75% of the initial purchase cost. Therefore, ensuring stability and reducing maintenance costs are essential in terms of economy. In particular, private railroad operators must reduce government support budget by effectively utilizing railroad resources and reducing maintenance costs. Accordingly, this study analyzes the reliability characteristics of components using field data. Moreover, it resolves the problem of determining an economical replacement interval considering the timing of scrapping railroad vehicles. The procedure for determining the optimal replacement interval involves five steps. According to the decision model, the optimal replacement interval for the onboard signal device components of the "A" line train is calculated using field data, such as failure data, preventive maintenance cost, and failure maintenance cost. The field data analysis indicates that the mileage meter is 9 years, which is less than the designed durability of 15 years. Furthermore, a life cycle in which the phase signal has few failures is found to be the same as the actual durability of 15 years.

Block 대체정책에 관한 연구

  • 배문식
    • ETRI Journal
    • /
    • 제6권3호
    • /
    • pp.17-20
    • /
    • 1984
  • A block replacement policy using items with different reliability is discussed. We devide system unit failure modes into two modes and use less reliable unit when operating unit fails near the planned preventive replacement time. In this policy, item A has two failure modes. Mode-1 failure is removed by minimal repair, mode-2 failure by replacement. If mode-2 failure of item A happens in (0,T- $\delta$). failure item A is replaced by new item A. If mode-2 failure of item A happens in(T-$\delta$,T), failure item A is replaced by new item B. Item B should be cheaper and less durable than item A. Under this policy, we determine the preventive replacement interval T and the interval $\delta$ of item B replacement which minimize the cost rate per unit time.

  • PDF

Lifetime Estimation for Mixed Replacement Grouped Data in Competing Failures Model

  • Lee, Tai-Sup;Yun, Sang-Un
    • International Journal of Reliability and Applications
    • /
    • 제2권3호
    • /
    • pp.189-197
    • /
    • 2001
  • The estimation of mean lifetimes in presence of interval censoring with mixed replacement procedure is examined when the distributions of lifetimes are exponential. It is assumed that, due to physical restrictions and/or economic constraints, the number of failures is investigated only at several inspection times during the lifetime test; thus there is interval censoring. The maximum likelihood estimator is found in an implicit form. The Cramor-Rao lower bound, which is the asymptotic variance of the estimator, is derived. The estimation of mean lifetimes for competing failures model has been expanded.

  • PDF

A Study on the Holiday Effect of Purchase Interval of Mobile Phone in Chinese Online B2C Market

  • Kwak, Youngsik;Hong, Jaewon;Nam, Yongsik;Nam, Yoonjung
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권6호
    • /
    • pp.205-210
    • /
    • 2019
  • The purpose of this study is to demonstrate empirically whether replacement intervals of mobile phones sold in China online B2C are influenced by purchase points such as holidays. If there is a holiday effect, it is expected that the product replacement interval or interpurchase interval will be short compared to the usual one at holiday time. In order to verify this positively, at TMall, one of the largest B2C sites in China, we explored 5,132 replacement cycle intervals and the point of purchase at which one of the sales records of an agent dealing with all multinational mobile phones had minimum two purchase records. As a result, there was a buyer who had shorter replacement period than usual in holiday season. There was no statistically significant difference in the intervals of interchange between holidays. Based on the results, it was found that the mobile phone vendors were aware that purchasing was occurring due to the holiday.