• Title/Summary/Keyword: Repetitive project

Search Result 73, Processing Time 0.029 seconds

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

SCHEDULING REPETITIVE PROJECTS WITH STOCHASTIC RESOURCE CONSTRAINTS

  • I-Tung Yang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.881-885
    • /
    • 2005
  • Scheduling repetitive projects under limitations on the amounts of available resources (labor and equipment) has been an active subject because of its practical relevance. Traditionally, the limitation is specified as a deterministic (fixed) number, such as 1000 labor-hours. The limitation, however, is often exposed to uncertainty and variability, especially when the project is lengthy. This paper presents a stochastic optimization model to treat the situations where the limitations of resources are expressed as probability functions in lieu of deterministic numbers. The proposed model transfers each deterministic resource constraint into a corresponding stochastic one and then solves the problem by the use of a chance-constrained programming technique. The solution is validated by comparison with simulation results to show that it can satisfy the resource constraints with a probability beyond the desired confidence level.

  • PDF

SIMULATED ANNEALING FOR LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS

  • C.I. Yen
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.530-539
    • /
    • 2007
  • Many construction projects such as highways, pipelines, tunnels, and high-rise buildings typically contain repetitive activities. Research has shown that the Critical Path Method (CPM) is not efficient in scheduling linear construction projects that involve repetitive tasks. Linear Scheduling Method (LSM) is one of the techniques that have been developed since 1960s to handle projects with repetitive characteristics. Although LSM has been regarded as a technique that provides significant advantages over CPM in linear construction projects, it has been mainly viewed as a graphical complement to the CPM. Studies of scheduling linear construction projects with resource consideration are rare, especially with multiple resource constraints. The objective of this proposed research is to explore a resource assignment mechanism, which assigns multiple critical resources to all activities to minimize the project duration while satisfying the activities precedence relationship and resource limitations. Resources assigned to an activity are allowed to vary within a range at different stations, which is a combinatorial optimization problem in nature. A heuristic multiple resource allocation algorithm is explored to obtain a feasible initial solution. The Simulated Annealing search algorithm is then utilized to improve the initial solution for obtaining near-optimum solutions. A housing example is studied to demonstrate the resource assignment mechanism.

  • PDF

Masonry work interference factor deduction based on daily report data analysis (작업일보 데이터를 활용한 조적공사 작업간섭 요소 도출)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.172-173
    • /
    • 2015
  • Construction project involves numerous repetitive operations. Especially in high-rise and apartment houses projects, the amount of repetitive operations increase and a preceding operations delay causes serious damage to the total duration of the project. This study deducts work delay factors by site engineer interview and survey. The study analyzes daily report data to deduct crucial processes affecting masonry work which has been investigated to be one of preliminary processes conducted at the beginning of finish work.

  • PDF

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

A Stochastic Linear Scheduling Method using Monte Carlo Simulation

  • Soderlund, Chase;Park, Borinara
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.169-173
    • /
    • 2015
  • The linear scheduling method or line-of-balance (LOB) is a popular choice for projects that involve repetitive tasks during project execution. The method, however, produces deterministic schedule that does not convey a range of potential project outcomes under uncertainty. This results from the fact the basic scheduling parameters such as crew production rates are estimated to be deterministic based on single-point value inputs. The current linear scheduling technique, therefore, lacks the capability of reflecting the fluctuating nature of the project operation. In this paper the authors address the issue of how the variability of operation and production rates affects schedule outcomes and show a more realistic description of what might be a realistic picture of typical projects. The authors provide a solution by providing a more effective and comprehensive way of incorporating the crew performance variability using a Monte Carlo simulation technique. The simulation outcomes are discussed in terms of how this stochastic approach can overcome the shortcomings of the conventional linear scheduling technique and provide optimum schedule solutions.

  • PDF

Searching for Core Project Management Issues in Remodeling Projects : Focus on office building remodeling projects (리모델링 프로젝트의 사업관리 현안 발굴 연구 : 오피스빌딩 리모델링 사업을 대상으로)

  • Seo Hee-jun;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.220-223
    • /
    • 2004
  • Remodelling projects have recently emerged as an alternative construction market. Due to the limited experience of such projects, repetitive mistakes and failures in project management become concerns for those in the market sector. The objective of this paper to report preliminary findings in relation to core project management issues in office remodelling projects based on literature review and expert interviews.

  • PDF

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION

  • Fitria H. Rachmat;Lingguang Song;Sang-Hoon Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.907-913
    • /
    • 2009
  • Pipeline construction is a highly repetitive and resource-intensive process that is exposed to various constraints and uncertainties in the working environment. Effective look-ahead scheduling based on the most recent project performance data can greatly improve project execution and control. This study enhances the traditional linear scheduling method with stochastic simulation to incorporate activity performance uncertainty in look-ahead scheduling. To facilitate the use of this stochastic method, a computer program, Stochastic Linear Scheduling Method (SLSM), was designed and implemented. Accurate look-ahead scheduling can help schedulers to better anticipate problem areas and formulate new plans to improve overall project performance.

  • PDF

Modeling Laborers' Learning Processes in Construction: Focusing on Group Learning

  • Lee, Bogyeong;Lee, Hyun-Soo;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.154-157
    • /
    • 2015
  • Construction industry still requires a lot of laborers to perform a project despite of advance in technologies, and improving labor productivity is an important strategy for successful project management. Since repetitive construction works exhibits learning effect, understanding laborers' learning phenomenon therefore allows managers to have improved labor productivity. In this context, previous research efforts quantified individual laborer's learning effect, though numerous construction works are performed in group. In other words, previous research about labor learning assumed that sum of individual's productivity is same as group productivity. Also, managers in construction sites need understanding about group learning behavior for dealing with labor performance problem. To address these issues, the authors investigate what variables affect laborers' group level learning process and develop conceptual model as a basic tool of productivity estimation regarding group learning. Based on the result of this research, it is possible to understand forming mechanism of learning within the group level. Further, this research may contribute to maximizing laborers' productivity in construction sites.

  • PDF

A Case Study on Resident Participative Primary Design of Integrated Rural Development Project with Master Planner - Onui Area in Hong Seong - (총괄계획가 시범사업에서 주민참여 기본계획 사례연구 - 홍성 오누이권역을 대상으로 -)

  • Jung, Nam Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.4
    • /
    • pp.167-175
    • /
    • 2015
  • The aim of this study is to establish resident-participative primary design of integrated rural development project with master planner by setting principals of open competition and transparent decision-making about village-to-village or business-to-business unit enterprise in Onui area, Hong-seong Gun. For effective processing, software projects such as residents education and rural landscape planning are simultaneously conducted for enhancing project understanding and comprehensive development plan including related post project. Above all, competition teams for individual project were organized to establish the resident-participative primary design using survey tables of residents demand. In 6 months resident-participative processing of primary design, continuous education and visiting to advanced area are conducted in team unit. Strengthened ability of team unit can be used in management and maintenance after project development. To do this, residents with the same opinions gathered as one competition team and identified business plans such as village asset, business location, size, program, and method for land securing. Favorable decision-making process by residents who are audience in project presentation of competition team has conducted. After selecting competition teams, continuos consulting are operated for establishing operation and management for developed or remodeled facilities through repetitive education and visiting advanced area. In this process, unit project suggested by competition team are completed. Preliminary selection was conducted by experts who were entrusted by residents. After residents agreement of project main stream such as major facilities and location, final detailed cost of projects are work out. Suggested process in this study which choose the final project by residents would improve residents' voluntary participation in integrated rural development project through open competition in establishing primary design.