• Title/Summary/Keyword: Repair Rate

Search Result 765, Processing Time 0.025 seconds

Analysis of Criteria for Selecting Load Redistribution Algorithm for Fault-Tolerant Distributed System (분산 시스템의 결함시 재분배 알고리즘의 선정기준을 위한 특성 분석)

  • 최병갑
    • Journal of the Korea Society for Simulation
    • /
    • v.3 no.1
    • /
    • pp.89-98
    • /
    • 1994
  • In this paper, a criteria for selecting an appropriate load redistribution algorithm is devised so that a fault-tolerance distributed system can operte at its optimal efficience. To present the guideline for selecting redistributing algorithms, simulation models of fault-tolerant system including redistribution algorithms are developed using SLAM II. The job arrival rate, service rate, failure and repair rate of nodes, and communication delay time due to load migration are used as parameters of simulation. The result of simulation shows that the job arrival rate and the failure rate of nodes are not deciding factors in affecting the relative efficiency of algorithms. Algorithm B shows relatively a consistent performance under various environments, although its performance is between those of other algorithms. If the communication delay time is longer than average job processing time, the performance of algorithm B is better than others. If the repair rate is relatively small or communication delay time is longer than service time, algorithm A leads to good performance. But in opposite environments, algorithm C is superior to other algorithms.

  • PDF

주기적 예방보전의 최적정책에 관한 연구

  • Na Myeong Hwan;Son Yeong Suk;Kim Mun Ju
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.115-120
    • /
    • 2005
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal period time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost rate per unit time. Finally, it suppose that the failure time of a system has a Weibull distribution as an example and we obtain an expected cost rate per unit time the optimal period time and the number when cost of replacement and cost of minimal repair change.

  • PDF

A Novel BIRA Method with High Repair Efficiency and Small Hardware Overhead

  • Yang, Myung-Hoon;Cho, Hyung-Jun;Jeong, Woo-Sik;Kang, Sung-Ho
    • ETRI Journal
    • /
    • v.31 no.3
    • /
    • pp.339-341
    • /
    • 2009
  • Built-in redundancy analysis (BIRA) is widely used to enhance the yield of embedded memories. In this letter, a new BIRA method for both high repair efficiency and small hardware overhead is presented. The proposed method performs redundancy analysis operations using the spare mapping registers with a covered fault list. Experimental results demonstrate the superiority of the proposed method compared to previous works.

  • PDF

The Effect of Different Starting Periods of Passive Exercise on the Clinical Outcome of Arthroscopic Rotator Cuff Repair

  • Back, Young-Woong;Tae, Suk-Kee;Kim, Min-Kyu;Kwon, Oh-Jin
    • Clinics in Shoulder and Elbow
    • /
    • v.17 no.2
    • /
    • pp.57-63
    • /
    • 2014
  • Background: To compare the effect of different starting periods of rehabilitative exercise (early or delayed passive exercise) on the rate of retear and other clinical outcomes after the arthroscopic repair of the rotator cuff. Methods: In total, 103 patients who underwent arthroscopic repair of the rotator cuff were included in the study. Determined at 2 weeks post-operation, patients who were incapable of passive forward elevation greater than $90^{\circ}$ were allotted to the early exercise group (group I: 79 patients; 42 males, 37 females), whilst those capable were allotted to the delayed exercise group (group II: 24 patients; 14 males, 10 females). The group I started passive exercise, i.e. stretching, within 2 weeks of operation, whilst group II started within 6 weeks. The results were compared on average 15.8 months (11-49 months) post-operation using the passive range of motion, the Visual Analog Scale (VAS) pain score, and the University of California at Los Angeles (UCLA) and Constant scores. Stiffness was defined as passive forward elevation or external rotation of less than $30^{\circ}C$ compared to the contralateral side. Follow-up magnetic resonance imaging (MRI) was carried out on average 1 year post-operation and the rate of retear was compared with Sugaya's criteria. Results: There were no differences between the two groups in gender, age, smoking, presence of diabetes, arm dominance, period of tear unattended, pre-operative range of motion, shape and size of tear, degree of tendon retraction, and tendon quality. There were no significant differences in clinical outcomes. Whilst stiffness was more frequent in group II (p-value 0.03), retear was more frequent in group I (p-value 0.028) according to the MRI follow-up. Conclusions: During rehabilitation after the arthroscopic repair of the rotator cuff, the delay of passive exercise seems to decrease the rate of retear but increase the risk of stiffness.

Arthroscopic Partial Repair of Massive Contracted Rotator Cuff Tears

  • Kim, Sung-Jae;Kim, Young-Hwan;Chun, Yong-Min
    • Clinics in Shoulder and Elbow
    • /
    • v.17 no.1
    • /
    • pp.44-47
    • /
    • 2014
  • Typically, massive rotator cuff tears have stiff and retracted tendon with poor muscle quality, in such cases orthopaedic surgeons are confronted with big challenging to restore the cuff to its native footprint. Furthermore, even with some restoration of the footprint, it is related with a high re-tear rate due to less tension free repair and less tendon coverage. In this tough circumstance, the partial repair has yielded satisfactory outcomes at relatively short follow-up by re-creating the transverse force couple of the rotator cuff. Through this partial repair, the massive rotator cuff tear can be converted to the "functional rotator cuff tear" and provide improvement in pain and functional outcomes in patient's shoulder.

A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate (문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석)

  • JUNG, Younghun;YUN, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.111-132
    • /
    • 2022
  • The comprehensive examination on tendering system has been introduced to the Cultural Heritage repair and restoration field since 2016 to remedy the repair issues of South Gate in 2014. The Cultural Heritage Administration tried to attain the high performance of the cultural heritage repair and restoration works securing the proper payment for the repair and restoration works. It is high time to review the operating performance of the comprehensive examination on tendering system (hereinafter referred to as the "CEOTS"), as the system has been run for over 5 years to correspond with its original goal, i.e., "The Proper Payment in return for the High Performance of Repair and Restoration works." This study intends to analyze 114 tenders of CEOTS from 2016 to 2020. As a result of the analysis of 114 tenders, firstly, more than half of bid winners were in the top 20% of repair & restoration capacity disclosure amount list, which mostly fulfilled the goal of 'attaining high performance.' Secondly, as the winning bid rate is decreasing from 86.847% in 2017 to 85.488% in 2020, the goal of 'guarantee of a proper payment' is not achieved yet. Thirdly, the influence of Economic Evaluation section in CEOTS has been grown since the change of scoring system in CEOTS in 2019. This study identifies two reasons why the winning bid rate of CEOTS has decreased. Firstly, it is caused by the fact that 'the group that got more than 1st place' and 'the first place group' that are more than half of the total bidders have the decreasing bidding rate trend as the years go by. Secondly, the exclusion rate of 'the group that got more than 1st place' is higher than the exclusion rate of 'the group that got less than 1st place', which means the expected winning rate would be lowered. It is proposed that the revision of CEOTS code is needed, i.e. easing the strict rule concerning the exclusion rate as well as setting up the lower bidding limit to prevent the excessive decreasing winning bid rate.

A Study on Optimal Preventive Maintenance Policy When Failure Rate is Exponentially Increasing After Repair (수리 후 고장률이 지수적으로 증가하는 경우에 최적 예방보전 정책)

  • Kim, Tae-Hui;Na, Myung-Hwan
    • Journal of Applied Reliability
    • /
    • v.11 no.2
    • /
    • pp.167-176
    • /
    • 2011
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal periodic time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost per unit time.

Simulation and Evaluation of Redistribution Algorithms In Fault-Tolerant Distributed System (결함허용 분산시스템의 재분배 알고리즘의 시뮬레이션과 평가)

  • 최병갑;이천희
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.31B no.8
    • /
    • pp.1-10
    • /
    • 1994
  • In this paper load redistribution algorithm to allow fault-tolerance by redistributing the workload of n failure nodes to the remaining good nodes in distributed systems are investigated. To evaluate the efficiency of the algorithms a simulation model of algorithms is developed using SLAM II simulation language. The job arrival rate service rate failure and repair rate of nodes and communication delay time due to load migraion are used as parameters. The result of the simulation shows that the job arrival rate failure and repair rate of nodes do not affected on the relative efficiency of algorithms. If the communication delay time is greater than average job processing time algorithm B is better. Otherwise algorithm C is superior to the others.

  • PDF

Development of the Repair Mortar using Coarse Powder of Coal Ash (석탄회 조분을 유효이용한 보수 모르터의 개발)

  • 전진환;조정기;시기영장;립정호;화미광희
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.1017-1022
    • /
    • 2003
  • The hydraulic structures such as aqueduct tunnels and the drainage canal of the hydroelectric power plant in Japan are almost old. Therefore, the concrete surface of the aqueduct tunnel has received damage by wear-out and the crack, etc. This study was to develop repair mortar mixed a coal ash coarse powder by using two kinds of high early strength cements. As a result, the repair mortar was obtained by substituting the EF cement (maid in Japan) and the MT cement (maid in South Korea) at a rate of 60:40, and substituting the coal ash 30% and the mixing rate 35% of the artificial aggregate for natural fine aggregate.

  • PDF

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF