• Title/Summary/Keyword: Repair Rate

Search Result 771, Processing Time 0.028 seconds

Study of changes in the kinetic parameters of corrosion on the macrocell current induced by the repair of reinforced concrete structures - Results of numerical simulation

  • Mostafa Haghtalab;Vahed Ghiasi;Aliakbar Shirzadi Javid
    • Computers and Concrete
    • /
    • v.32 no.3
    • /
    • pp.287-302
    • /
    • 2023
  • Corrosion of reinforcing bars in reinforced concrete structures due to chloride attack in environments containing chloride ions is one of the most important factors in the destruction of concrete structures. According to the abundant reports that the corrosion rate around the repair area has increased due to the macro-cell current known as the incipient anode, it is necessary to understand the effective parameters. The main objective of this paper is to investigate the effect of the kinetic parameters of corrosion including the cathodic Tafel slope, exchange current density, and equilibrium potential in repair materials on the total corrosion rate and maximum corrosion rate in the patch repair system. With the numerical simulation of the patch repair system and concerning the effect of parameters such as electromotive force (substrate concrete activity level), length of repair area, and resistivity of substrate and repair concrete, and with constant other parameters, the sensitivity of the macro-cell current caused by changes in the kinetic parameters of corrosion of the repairing materials has been investigated. The results show that the maximum effect on the macro-cell current values occurred with the change of cathodic Tafel slope, and the effect change of exchange current density and the equilibrium potential is almost the same. In the low repair extant and low resistivity of the repairing materials, with the increase in the electromotive force (degree of substrate concrete activity) of the patch repair system, the sensitivity of the total corrosion current reduces with the reduction in the cathode Tafel slope. The overall corrosion current will be very sensitive to changes in the kinetic parameters of corrosion. The change in the cathodic Tafel slope from 0.16 to 0.12 V/dec and in 300 mV the electromotive force will translate into an increase of 200% of the total corrosion current. While the percentage of this change in currency density and equilibrium potential is 53 and 43 percent, respectively. Moreover, by increasing the electro-motive force, the sensitivity of the total corrosion current decreases or becomes constant. The maximum corrosion does not change significantly based on the modification of the corrosion kinetic parameters and the modification will not affect the maximum corrosion in the repair system. Given that the macro-cell current in addition to the repair geometry is influenced by the sections of reactions of cathodic, anodic, and ohmic drop in repair and base concrete materials, in different parameters depending on the dominance of each section, the sensitivity of the total current and maximum corrosion in each scenario will be different.

Aperiodic Preventive Maintenance Model and Parameter Estimation

  • Kim, Hee-Soo;Yum, Joon-Keun;Park, Dong-Ho
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.15-26
    • /
    • 2000
  • This paper considers an aperiodic preventive maintenance (PM) model for repairable systems, in which the time intervals between two consecutive preventive maintenances are unequal. To propose such an aperiodic PM model, we assume that each PM reduces the current hazard rate by a certain amount which depends on the number of PMs performed previously. If the system fails between PMs, the minimal repair is performed and the hazard rate remains unchanged after the repair. We give the exact expressions for the hazard rate function for the aperiodic PM model. Based on the proposed aperiodic PM model, we suggest the maximum likelihood method to estimate the parameters characterizing the model and apply the method to the case of Weibull distribution. Numerical examples for estimating the parameters are presented for the purpose of illustration.

  • PDF

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

Cost Limit Replacement Policy under Imperfect Repair with Inspection Error (검사오차가 있는 불완전 수리에서의 비용한계 교체 정책)

  • Yun, Won-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.16 no.2
    • /
    • pp.45-50
    • /
    • 1990
  • A replacement policy with repair cost limit is discussed. When a system fails, the repair cost is estimated by inspection and repair is then undertaken if the estimated cost is less than a predetermined limit L ; otherwise the system is replaced. After repair, the system is as good as new with probability(l-p) or is minimally repaired with probability p. It is assumed that repair cost can not be estimated exactly because of inspection error. When the failure time follows a Weibull distribution and repair cost a normal distribution, the value of repair cost limit minimizing the expected cost rate is shown to be finite and unique.

  • PDF

Cost Analysis for Periodic Maintenance Policy with Minimal Repair (응급수리를 고려한 정기보전정책의 비용분석)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.139-146
    • /
    • 1995
  • This study is concerned with cost analysis in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Minimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a spate until the periodic time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to maintenance period and scale parameter of failure distribution. Total cost factors ate included operating, fixed, minimal repair, periodic maintenance and replacement cost Numerical example is shown in which failure time of system has erlang distribution.

  • PDF

Effects of Outside Repair Welding on the Crack Growth in the Surge Nozzle Weld on the Hot Leg Side in a Nuclear Power Plant (외면 보수 용접이 원전 고온관 밀림노즐에서의 결함성장에 미치는 영향)

  • Na, Kyung-Hwan;Yun, Eun-Sub;Park, Young-Sheop
    • Journal of Welding and Joining
    • /
    • v.29 no.2
    • /
    • pp.34-39
    • /
    • 2011
  • Nickel-based austenitic alloys such as Alloy 82 and 182 had been employed as the weld metals in nuclear power plants (NPPs) due to their high corrosion resistance as well as good mechanical properties. However, since the 2000s, the occurrence of primary water stress corrosion cracking has been reported in conjunction with these alloys in domestic and oversea NPPs. In the present work, we assumed an imaginary crack at the inner surface of a surge nozzle weld that had previously experienced the outside repair welding, and constructed its finite element model. Finite element analysis was performed with respect to the heat transfer, and then to the residual stress for obtaining the total applied stress distributions. These stress distributions were finally converted to the stress intensity factors for estimating crack growth rate. From the comparison of crack growth rate curves for the cases of no repair welding and outside repair welding, it was found that the outside repair welding did not exhibit negative effect on the crack growth for the surge nozzle under consideration in this work; in both cases, the cracks stopped growing before they became the through-wall cracks.

Time Series Data Cleaning Method Based on Optimized ELM Prediction Constraints

  • Guohui Ding;Yueyi Zhu;Chenyang Li;Jinwei Wang;Ru Wei;Zhaoyu Liu
    • Journal of Information Processing Systems
    • /
    • v.19 no.2
    • /
    • pp.149-163
    • /
    • 2023
  • Affected by external factors, errors in time series data collected by sensors are common. Using the traditional method of constraining the speed change rate to clean the errors can get good performance. However, they are only limited to the data of stable changing speed because of fixed constraint rules. Actually, data with uneven changing speed is common in practice. To solve this problem, an online cleaning algorithm for time series data based on dynamic speed change rate constraints is proposed in this paper. Since time series data usually changes periodically, we use the extreme learning machine to learn the law of speed changes from past data and predict the speed ranges that change over time to detect the data. In order to realize online data repair, a dual-window mechanism is proposed to transform the global optimal into the local optimal, and the traditional minimum change principle and median theorem are applied in the selection of the repair strategy. Aiming at the problem that the repair method based on the minimum change principle cannot correct consecutive abnormal points, through quantitative analysis, it is believed that the repair strategy should be the boundary of the repair candidate set. The experimental results obtained on the dataset show that the method proposed in this paper can get a better repair effect.

Arthroscopic transosseous anchorless rotator cuff repair reduces bone defects related to peri-implant cyst formation: a comparison with conventional suture anchors using propensity score matching

  • Hyeon Jang Jeong;Ji Soo Lee;Young Kyu Kim;Sung-Min Rhee;Joo Han Oh
    • Clinics in Shoulder and Elbow
    • /
    • v.26 no.3
    • /
    • pp.276-286
    • /
    • 2023
  • Background: The transosseous anchorless repair (ToR) technique was recently introduced to avoid suture anchor-related problems. While favorable outcomes of the ToR technique have been reported, no previous studies on peri-implant cyst formation with the ToR technique exist. Therefore, this study compared the clinical outcomes and prevalence of peri-implant cyst formation between the ToR technique and the conventional transosseous equivalent technique using suture anchors (SA). Methods: Cases with arthroscopic rotator cuff repair (ARCR) between 2016 and 2018 treated with the double-row suture bridge technique were retrospectively reviewed. Patients were divided into ToR and SA groups. To compare clinical outcomes, 19 ToR and 57 SA cases without intraoperative implant failure were selected using propensity score matching (PSM). While intraoperative implant failure rate was analyzed before PSM, retear rate, peri-implant cyst formation rate, and functional outcomes were compared after PSM. Results: The intraoperative implant failure rate (ToR, 8% vs. SA, 15.3%) and retear rate (ToR, 5.3% vs. SA, 19.3%) did not differ between the two groups (all P>0.05). However, peri-implant cysts were not observed in the ToR group, while they were observed in 16.7% of the SA group (P=0.008). Postoperative functional outcomes were not significantly different between the two groups (all P>0.05). Conclusions: The ToR technique produced comparable clinical outcomes to conventional techniques. Considering the prospect of potential additional surgeries, the absence of peri-implant cyst formation might be an advantage of ToR. Furthermore, ToR might reduce the medical costs related to suture anchors and, thereby, could be a useful option for ARCR. Level of evidence: III.

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.

Analysis of Operational Availability under Changing Failure Rate and Supportability (무기체계의 고장률과 지원수준의 변화에 따른 운용가용도 변화 분석)

  • Tak, Jung Ho;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.18 no.1
    • /
    • pp.1-7
    • /
    • 2018
  • Purpose: Maintaining appropriate operational availability (Ao) is a key element of combat victory, but estimates vary according to estimation methods. The purpose of this study is to improve the accuracy of estimating operational availability by tracing the changes of the weapon system's failure rate, repair rate, and the level of logistic support. Methods: In order to track the change in the operating availability, the MDT (mean down time) is modeled by adding the repair time and the ALDT (administration and logistic delay time) to the service time. Results: Using the field data of the weapon system A operated by the ROKAF, the failure rate follows a non-homogeneous Poisson process that changes with time, and it is modeled considering the changing repair rate and the logistic support time. Conclusion: The accuracy of the analytical results was verified by comparing the actual operating data with the estimated availability. The results of this study can be used to track and evaluate the availability in a realistic situation where the failure rate and maintenance rate continuously change in operating environment.