• Title/Summary/Keyword: Repair Method

Search Result 1,620, Processing Time 0.041 seconds

Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost (공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정)

  • Lee, Kang-Hee;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

Establishment of the Service Life of the Education Fcilities - Focused on the Roof water-proof and Floor finishings - (교육시설 내용년한 산정 연구 - 옥상방수와 바닥마감재를 대상으로 -)

  • Lee, Kang-Hee;Chae, Chang-U
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.6
    • /
    • pp.27-36
    • /
    • 2017
  • Educational facilities have an affect to make a decently learning environment. After constructed, it needs a maintenance plan to keep the performance or function which provide the repair time, repair scope and ratio. But the fundamental data are so insufficient that the field worker can't provide the maintenance plan and has no choice use the other data which concerned with apartment or office building. Above all, the service life is indispensible to make a repair plan because the repair time and scope would be provided within the service life. This study aimed at providing the method to make a service life of component in educational facilities and applying the method into the roof proof and floor finishing. Results are shown that first, it is important to set the $1^{st}$ repair time after constructed. when it proposes the three ways with the probability approach, choice probability model and cumulative cost function. Second, the service life of roof proof is provided with about 35 years. In addition, the service life of the floor finishing is about 40 years. These result would be utilized to conduct the repair plan under the service life.

A Comparative Study on the Repair Performance of Concrete Crack (콘크리트 균열 보수성능에 관한 비교 연구)

  • 박성우;윤성훈
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.817-822
    • /
    • 2002
  • The problem of the crack which occures from the reinforced concrete structure could be caused by the complexed factors. When the crack happen, it caused fatal blemish to manage and maintain the structure such as structural problem, licking, spalling, viewing Even though they study and work hard to solve this kind of problem in the world, there are no countermeasure for perfect prevention of crack. After the crack checked out, a method of repair-reinforcement has been studied and operated actively, Generally, occurance of the crack in the concrete structure could be taken as granted, no need to mention the damage from the crack, domestic construction try to hide it rather than repair basically, In many cases the construction amount for repairing the crack has to be made in the construction area and the amount is very expensive. To save the repaing fee, companys repair it under the meeting of their desire. it can be expected for the effection of the construction. For this reason, we compare a new injection method to solve the demerits of the present method, to save and use the merit of the present method.

  • PDF

A Case Study on the Remodeling and Repair/Rehabilitation of the Multi-Owned Buildings (집합건축물의 리모델링과 보수$\cdot$보강 사례연구)

  • Jeong Eun Cheol;Jeong Hye Gyo;Lee Hui Seok;Kim Seung Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.219-222
    • /
    • 2005
  • Recently, remodeling has been a major field of the building construction that comes up for the alternatives of the reconstruction and the economical construction method. In the almost cases, the engineering capacity for the repair/rehabilitation of the remodeling should satisfy also the owner's various needs (eg, the minimum construction time, etc.) and the safety of the building. Also, the engineering and construction technique for remodeling should be applied to the contrary point of view of the general construction method. But, the many problem actually has arose from the wrongly applied construction method that is caused with the insufficient researches and development. Therefore, this study would suggest the necessities and the directions of developing the elementary engineering technique and the method that satisfy the owner's various needs for the remodeling and repair/rehabilitation of the multi-owned building as multiplex shop, with the successful construction cases.

  • PDF

A Study on Field Application of Preventive Maintenance Method for Flexible Pavements (연성포장의 예방적 유지보수공법에 대한 현장 적용성 연구)

  • Kim, Nakseok;Jin, Jung-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.565-569
    • /
    • 2011
  • This paper presents minimum area repair method that is one of the preventive maintenance techniques in asphalt concrete pavements. In this method, a 70cm-width as an effective repair zone was suggested considering the conventional longitudinal damages (rutting and fatigue cracking) in early stages. In addition, the repair zone can be readjusted according to the pavement damage levels. A field test bed was constructed to verify the adaptness for the repair method. Test results revealed that the minimum area repair method can be adopted as a preventive maintenance technique in flexible pavements to recover an appropriate serviceability level. The preventive maintenance method may be one of the major maintenance methods of flexible pavements with an appropriate application. It is also noted that the method may be a long term maintenance cost effective and pavement life ensuring one.

Repair methods for aging aircraft and application of composite patch repair (노후항공기의 보수 방법 및 복합재 패치보수의 응용)

  • 김위대;김종진
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2002.05a
    • /
    • pp.167-172
    • /
    • 2002
  • During the operation of military aircraft, maintenance is divided into organizational, intermediate and depot maintenance. In the depot maintenance, after removal of major parts and removable doors, damage assessment is performed. Locating damage, charactering the damage and determining its extent, zoning the damage on the part being repaired and re-evaluation of the damaged area after damage removal. Repair joints are classified by bonded joints and bolted joints, depending on joining material. In this paper, repair method in aging aircraft is investigated and the possibility of application of copmposite patch is surveyed.

  • PDF

Estimating Repair Effect and Parameters of Intensity Function under BMS Repair Model (BMS 수리모형하에서 시스템의 수리효과 및 고장강도함수의 모수추정)

  • 윤원영;정석주;정일한;김종운;정상욱
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.25 no.4
    • /
    • pp.45-54
    • /
    • 2000
  • Estimation Problems of parameters of the failure process and the repair effect in repairable systems are considered. We propose estimation procedures in repairable systems without preventive maintenances. The failure process is modeled by a proportional age reduction model (Brown, Mahoney, Sivazlian [5]) which is able to consider both aging and repair effects. Maximum likelihood method is used to estimate the repair effect and parameters of intensity function simultaneously. simulations are performed to evaluate the accuracy of estimators. A numerical example is also presented.

  • PDF

A study on estimation status and improvement plan of the repair and replacement cycle of a building (건축물 수선교체주기 산정현황과 개선방안에 관한 연구)

  • Kim, Jong-Rok;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.193-198
    • /
    • 2010
  • This study aimed at presenting the improvement plan for estimation of the repair and replacement cycle to analyze these current problems by considering the repair and replacement cycle theoretically and examining estimation status of home and abroad, and then drawing implication and problem based on brainstorming and expert opinion. The findings of a study is as follows. First, the problem is, for the domestic, that there is no clear standard of division to the cycle of repair and replacement and the repair and replacement cycle considering capability to deal with the change by construction method, development of the function of material and the number of years of progress is not being applied. That is, an estimation of economical repair and replacement cycle which considers the case that a large scale repair with the level of remodeling is done between 25 years and 35 years is necessary. For estimating the repair and replacement cycle, foreign country is providing this according to the use or the level of function of a building, but it is not the case for the domestic. A characteristic of each building should be reflected and the standard of estimation of the repair and replacement cycle to new construction material or method should be prepared to improve this. In addition, the method of classification of the subject item for the repair and replacement is necessary to be reorganized to be able to apply the standard of initial construction item of a building. Also, it is considered that a service standard which can reset the repair and replacement cycle based on status of a building with escape from the existing definite setup of the repair and replacement cycle through the management of background data of the repair and replacement is going to be necessary.

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.

An Authentic Preservation Direction of Historic Buildings (역사건축물의 진정성 있는 보존방향 연구)

  • Kim, Dong-Yeol;Cheon, Deuk-Youm;Yang, Byeong-Beom
    • Journal of architectural history
    • /
    • v.21 no.4
    • /
    • pp.81-92
    • /
    • 2012
  • Historic buildings are history of human kind and a crystal of culture. Therefore, we have a responsibility and obligation to succeed to descendants. Once such heritage is damaged, it is hard to restore its original form. Thus, various attempts to preserve its value and authenticity have been made internationally. Among these, the international preservation tendency of historic building in terms of materials has been given to the preservation of materials as well as the preservation of appearance. In accordance with such trend, Korea also presented an equivalent general principle, and has managed historic buildings with the separate related instruction. The most general method to preserve historic buildings in Korea is a repair work. Since the foundation of Korea, the repair work tendency has been carried out in the principle of phenomenon change and original form maintenance. But, such tendency focuses on the appearance such as style, structure and trimming method, and there is insufficient consideration on the authentic preservation of materials. Accordingly, this study attempts to examine preservation principle and methods in the repair works, and also to investigate the afforestation condition for the restoration work. And, by suggesting preservation method of authentic materials, it aims to prepare the reference for the future repair work.