• Title/Summary/Keyword: Repair Cycle Time

Search Result 99, Processing Time 0.023 seconds

Optimal replacement policy following the expiration of payable RRNMW (유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.

Optimal Repair Method Selection through Neutralization Prediction and LCC Evaluation of a Concrete Structure (콘크리트 구조물의 중성화 및 LCC예측을 통한 최적보수공법 선정)

  • Kang In Seok;Lee Han Seung;Jeong Hae Moon;An Tae Song
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.511-514
    • /
    • 2005
  • In this study, LCC(Life Cycle Cost) evaluation technique is used for the purpose of accumulation of basic data required for such integrative system construction. We predicted the degradation time of concrete and repair material by neutralization through FEM analysis, and utilized the result for LCC evaluation It turned out that the repair method of construction in the most economical initial measure against degradation and a durable period can be chosen through the LCC evaluation in consideration of the degradation prediction using FEM analysis and the initial construction expense in a durable period and repair expense, and the number of repair times.

  • PDF

A Bayesian approach to maintenance strategy for non-renewing free replacement-repair warranty

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.1
    • /
    • pp.41-48
    • /
    • 2011
  • This paper considers the maintenance model suggested by Jung and Park (2010) to adopt the Bayesian approach and obtain an optimal replacement policy following the expiration of NFRRW. As the criteria to determine the optimal maintenance period, we use the expected cost during the life cycle of the system. When the failure times are assumed to follow a Weibull distribution with unknown parameters, we propose an optimal maintenance policy based on the Bayesian approach. Also, we describe the revision of uncertainty about parameters in the light of data observed. Some numerical examples are presented for illustrative purpose.

  • PDF

A Simulation Study on the Overhaul Repair Shop of Weapon System (전면정비방식의 무기체계 정비공장에 대한 시뮬레이션 연구)

  • Shin, Kyeong-Wook;Lee, Geun-Hyu;Moon, Dug-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.20 no.3
    • /
    • pp.119-127
    • /
    • 2011
  • Overhaul and repair service means the sequential processes of disassembly, repair and reassembly for a product which has been used for a long time. Overhaul is required for the companies producing airplanes, ships, trains, military weapons and heavy industrial equipments which are very expensive and have a long life cycle. The most important performance measure of the overhaul repair shop is usually the lead time. Thus, how to design the manufacturing system to meet the delivery date is a major concern in overhaul repair shop. This paper introduces the case study of an overhaul repair shop producing military weapon systems with the 3D simulation tool, $QUEST^{TM}$. At first, the characteristics of overhaul shop and what should be considered for simulation modeling are explained. Then, various simulation scenarios including two types of disassembly systems, one is flow line system and the other is cell system, are discussed with the results of simulation experiments.

Analysis of Damage Patterns for Gas Turbine Combustion Liner according to Model Change (모델 변천에 따른 가스터빈 연소기 라이너의 부위별 손상유형 분석)

  • Kim, Moon-Young;Yang, Sung-Ho;Park, Sang-Yeol;Kim, Sang-Hoon;Park, Hye-Sook;Won, Jong-Beom
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.2862-2867
    • /
    • 2008
  • High-temperature components of gas turbine operated for certain period of time can be reused by being repaired or rejuvenated. In case of the gas turbine combustion liners, the biggest and the most important one in the high-temperature components, come in a repair shop after operated for 8,000 or 12,000 hours according to the model and go through the repair and rejuvenation in order to be reused. A stated combustion liner is the first channel which has the combustion gas reached a nozzle from a fuel nozzle. Materials and coating properties of old and new model combustion liners were investigated. To repair these components after the visual inspection, the coatings of combustion liners were removed and then FPI(Fluorescent Penetrant Inspection), a kind of the NDI(Non-Destructive Inspection), was conducted. Damage patterns and the number of the damaged components were classified and analyzed based on data provided from the visual inspection over a long period of time. Focusing on the difference between old model and new model combustion liners, we analyzed the damage distribution and changes and consequently concluded that new model combustion liner would increase repair rate.

  • PDF

DNA damage repair is suppressed in porcine aged oocytes

  • Lin, Tao;Sun, Ling;Lee, Jae Eun;Kim, So Yeon;Jin, Dong Il
    • Journal of Animal Science and Technology
    • /
    • v.63 no.5
    • /
    • pp.984-997
    • /
    • 2021
  • This study sought to evaluate DNA damage and repair in porcine postovulatory aged oocytes. The DNA damage response, which was assessed by H2A.X expression, increased in porcine aged oocytes over time. However, the aged oocytes exhibited a significant decrease in the expression of RAD51, which reflects the DNA damage repair capacity. Further experiments suggested that the DNA repair ability was suppressed by the downregulation of genes involved in the homologous recombination (HR) and nonhomologous end-joining (NHEJ) pathways. The expression levels of the cell cycle checkpoint genes, CHEK1 and CHEK2, were upregulated in porcine aged oocytes in response to induced DNA damage. Immunofluorescence results revealed that the expression level of H3K79me2 was significantly lower in porcine aged oocytes than in control oocytes. In addition, embryo quality was significantly reduced in aged oocytes, as assessed by measuring the cell proliferation capacity. Our results provide evidence that DNA damage is increased and the DNA repair ability is suppressed in porcine aged oocytes. These findings increase our understanding of the events that occur during postovulatory oocyte aging.

A Case Study on the Cost Effectiveness Analysis of Depot Maintenance Using Simulation Model and Experimental Design (시뮬레이션 모형과 실험설계법을 활용한 창정비 비용대 효과 분석 사례)

  • Kim, Sung-Kon;Lee, Sang-Jin
    • Journal of the Korea Society for Simulation
    • /
    • v.26 no.3
    • /
    • pp.23-34
    • /
    • 2017
  • This paper is to study the simulation model of depot maintenance system that analyzes logistics supportability such as component availability and cost of target equipment. A depot maintenance system could repair or maintain multiple components simultaneously. The key performance indicators of this system are component availability, repair cycle time, and maintenance cost. The simulation model is based on the engine maintenance process of army aviation depot. This study combines the NOLH(Nearly Orthogonal Latin Hypercube) experimental design method, to composes 33 scenarios, with a multiple regression analysis to find out major factors that influence on key performance indicators. This study is significant in providing a cost-effectiveness analysis on depot maintenance system that is capable of maintaining multiple components at the same time.

Replacement Model after Extended Two-phase Warranty (연장된 이단계 보증 이후의 교체모형)

  • Jung, Ki Mun
    • Journal of Integrative Natural Science
    • /
    • v.14 no.4
    • /
    • pp.197-204
    • /
    • 2021
  • Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. Jung[13] discusses the two types of extended two-phase warranty models. In this paper, we suggest the replacement model after the extended two-phase warranty that has been proposed by Jung[13]. To determine the optimal replacement policy, we adopt the expected cost rate per unit time. So, the expressions for the total expected cost, the expected length of the cycle and the expected cost rate per unit time from the user's point of view are derived. Also, we discuss the optimal replacement policy and the uniqueness of the solution for the optimization. Furthermore, the numerical examples are provided to illustrate the proposed the replacement model.