A Study on the Derivation of Construction Priority in the Construction Stage of Green Remodeling in Public Buildings - With a Focus on Construction Elements - (공공 건축물 그린리모델링 시공단계 공사 우선사항 도출에 관한 연구 - 건축요소를 중심으로 -)

  • Park, Jun-Soo;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.59-60
    • /
    • 2023
  • Climate change caused by greenhouse gas emissions has become a climate crisis that actually threatens us and is making global efforts to solve it. In response, Korea is carrying out a "Green remodeling" project to reduce carbon emissions generated in the building maintenance stage, which has the highest percentage of all carbon emissions. However, Green remodeling is carried out under emergency supervision at the construction stage, but construction supervisors are often non-professionals, and even experienced site directors have difficulty in implementing actual designs if they do not have experience in Green remodeling construction. Therefore, this study aims to derive priorities between construction and construction focus points for each construction in order to standardize the construction of Green remodeling construction works and derive objective guidelines.

  • PDF

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

Basic Study on the Trend Analysis and Direction of Remodeling of High Schools (고등학교 리모델링의 경향분석 및 방향설정에 관한 기초적 연구 -서울시 고등학교 사례를 중심으로-)

  • Yoon, Jun-Seon
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.2
    • /
    • pp.16-24
    • /
    • 2007
  • The study is intended to analyze the tendency of the remodeling for the high schools in Seoul, with the potential challenges thereof, determining the principle for the remodeling projects in the days to come. To that end, the analysis to identify the school facilities in a bid to accommodate the current curriculum was conducted, along with the case study on remodeling projects. The $7^{th}$ curriculum demands for a significant change in school facilities. The number of student in a class that has been on the decline, despite of steady increase in number of schools, and the population getting concentrated in Seoul and its suburbs have resulted in an increase in number of class. Consequently, more investment in the facility, rather than improving a substantial education environment, has been made. The study, thus, is aimed at identifying the facility of the high school required by the $7^{th}$ curriculum, as well as implementing a fact-finding investigation into the remodeling works far high schools in Seoul so as to come up with the guideline for remodeling projects.

Study on the Trend Analysis and Direction of Remodeling of Middle Schools - Case Study of Middle Schools in Gyeonggi Province - (중학교(中學校) 리모델링의 경향분석 및 방향설정에 관한 연구 - 경기도 중학교 사례를 중심으로 -)

  • Yoon, Jun-Seon
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.13 no.1
    • /
    • pp.5-16
    • /
    • 2006
  • The study is intended to analyze the tendency of the remodeling for the middle schools in Gyeonggi Province, with the potential challenges thereof, thereby determining the principle for the remodeling projects in the days to come. To that end, the analysis to identify the school facilities in a bid to accommodate the current curriculum was conducted, along with the case study on remodeling projects. The $7^{th}$ curriculum demands for a significant change in school facilities. The number of student in a class that has been on the decline, despite of steady increase in number of schools, and the population getting concentrated in Seoul and its suburbs have resulted in an increase in number of class. Consequently, more investment in the facility, rather than improving a substantial education environment, has been made. The study, thus, is aimed at identifying the facility of the middle school required by the $7^{th}$ curriculum, as well as implementing a fact-finding investigation into the remodeling works for middle schools in Gyeonggi Province so as to come up with the guideline for remodeling projects.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.