• 제목/요약/키워드: Release Planning

검색결과 95건 처리시간 0.025초

생산능력 필터링 알고리즘 기반의 TFT-LCD Fab 투입계획 생성 방법론 (Capacity-Filtering Algorithm based Release Planning Method for TFT-LCD Fab)

  • 손학수;이호열;최병규
    • 산업공학
    • /
    • 제22권1호
    • /
    • pp.1-9
    • /
    • 2009
  • As the LCD fabrication factories (Fab) are highly capital-intensive and the markets are very competitive, it is an essential requirement of operational management to achieve full-capacity production while meeting customer demands on time. In a typical LCD Fab, medium-term schedules such as release plans and production plans are critical to achieve the goal of full-capacity production and on-time delivery. Presented in this paper is a framework for weekly planning system generating medium-term schedules using a finite-capacity planning method. Also this paper presents a release planning method applying capacityfiltering algorithm, especially backward capacity-filtering procedure, which is one of the finite-capacity planning methods. In addition, performance analyses using actual data of a TFT-LCD Fab show that the proposed method is superior to existing methods or commercial S/W products generating release plans.

소프트웨어 제품라인의 출시 계획 수립을 위한 탐욕 유전자 알고리듬 (A Greedy Genetic Algorithm for Release Planning in Software Product Lines)

  • 유재욱
    • 산업경영시스템학회지
    • /
    • 제36권3호
    • /
    • pp.17-24
    • /
    • 2013
  • Release planning in a software product line (SPL) is to select and assign the features of the multiple software products in the SPL in sequence of releases along a specified planning horizon satisfying the numerous constraints regarding technical precedence, conflicting priorities for features, and available resources. A greedy genetic algorithm is designed to solve the problems of release planning in SPL which is formulated as a precedence-constrained multiple 0-1 knapsack problem. To be guaranteed to obtain feasible solutions after the crossover and mutation operation, a greedy-like heuristic is developed as a repair operator and reflected into the genetic algorithm. The performance of the proposed solution methodology in this research is tested using a fractional factorial experimental design as well as compared with the performance of a genetic algorithm developed for the software release planning. The comparison shows that the solution approach proposed in this research yields better result than the genetic algorithm.

유전자 알고리듬을 이용한 소프트웨어 제품라인의 출시 계획 수립 (Release Planning in Software Product Lines Using a Genetic Algorithm)

  • 유재욱
    • 산업경영시스템학회지
    • /
    • 제35권4호
    • /
    • pp.142-148
    • /
    • 2012
  • Release planning for incremental software development is to select and assign features in sequence of releases along a specified planning horizon. It includes the technical precedence inherent in the features, the conflicting priorities as determined by the representative stakeholders, and the balance between required and available resources. The complexity of this consideration is getting more complicated when planning releases in software product lines. The problem is formulated as a precedence-constrained multiple 0-1 knapsack problem. In this research a genetic algorithm is developed for solving the release planning problems in software product lines as well as tests for the proposed solution methodology are conducted using data generated randomly.

국립공원 재계획 기준과 방법의 적절성 분석 (Analyze the Suitability on the Criteria and Methods of National Park Re-planning, Korea)

  • 홍성운;조우
    • 한국환경생태학회지
    • /
    • 제37권6호
    • /
    • pp.484-498
    • /
    • 2023
  • 본 연구는 국립공원 재계획중 타당성조사 기준과 방법의 적절성 분석을 목적으로 하였다. 가야산국립공원, 설악산과 주왕산국립공원은 절대평가(제2차) 방법이 상대평가(제3차) 보다 '해제 대상'이 낮은 비율로 도출되었다. 제3차 평가방법이 해제가능지역 10%라는 비율을 정해놓고 해제보다는 존치를 통한 공원면적 유지를 지향한 방법임에도 절대평가방법이 결코 해제가능 지역을 더 많이 추출하지는 않았다. 연구대상지에 제2차와 제3차 생태기반평가를 적용했을 때 2011년 실제 해제지역이 나타나는지를 분석한 결과 제2차, 제3차 생태기반평가 모두 해제지역을 반영하지 못했다. 생태기반평가는 해제지역을 결정하는 중요한 의사결정 수단이 아닌 보조수단일 뿐이었다. 공원계획 타당성조사의 구역조정 중 해제는 외적 요소인 상호교환, 해제기준의 우선적용 등이 더욱 중요하게 작용함을 알 수 있었다.

소프트웨어 제품라인의 출시 계획을 위한 최적해법 (An Exact Solution Approach for Release Planning of Software Product Lines)

  • 유재욱
    • 산업경영시스템학회지
    • /
    • 제35권2호
    • /
    • pp.57-63
    • /
    • 2012
  • 소프트웨어 개발에 있어서 소프트웨어를 시장에 출시하는 계획을 수립하는 것은 소프트웨어를 이루고 있는 기능들을 구현하는 데 제약이 되는 조건들(기술, 자원, 위험, 예산 등)을 만족하면서 계획된 출시기간에 이들 기능들을 할당하는 일이다. 이와 같이 소프트웨어 출시를 계획하는 것은 소프트웨어 제품라인에 대해서 고려할 때 더욱 복잡해진다. 본 연구에서는 소프트웨어 제품라인에 있어서 소프트웨어 출시 계획을 수립하기 위한 문제를 우선순위 제약하의 다수 0-1 배낭문제로 수리 모형화하고, 이를 풀기 위한 최적해법이 개발된다. 최적해법은 동적 계획법이 주가 되고, 문제의 크기를 줄이기 위하여 휴리스틱과 축소방법이 이용된다.

해제시간에 따른 열차예매시간의 영향 분석: 경부선 KTX를 중심으로 (Analyzing Effects of the Ticket Release Time on Train Reservation Time: Focusing on KTX Gyeongbu-line)

  • 김수재;추상호;손병희
    • 한국ITS학회 논문지
    • /
    • 제16권1호
    • /
    • pp.38-49
    • /
    • 2017
  • 일반적으로 철도운영기관에서는 수익성 극대화를 위해 티켓팅 해제시간을 적용하여 티켓을 판매하고 있다. 본 연구에서는 이같은 해제시간이 KTX 예매행태에 어떻게 영향을 미치는지를 분석하였다. 예매행태는 예매시간을 의미하며 예매시각과 출발시각의 차이로 계산하였다. 분석자료는 KTX 경부선 매표자료이며, 요일별 차이를 보기위해 평일(목요일)과 토요일, 일요일의 자료를 이용하였다. 예매시간에 미치는 요인으로 해제시각이외에 요일, 운행거리, 운행방향 등을 고려하였다. 분석결과, 대부분 출발 3시간 전에 티켓을 예매하는 것으로 나타났으며, 주말 상행노선 이용객의 경우 대부분이 출발 하루 전에 예매를 하는 것으로 나타났다. 또한 해제시간 전에는 상행노선, 장거리 구간, 일요일인 경우에 예매시간이 길게 나타났으며, 반면에 해제시간 이후에는 일요일인 경우와 장거리 구간인 경우에 예매시간이 짧게 나타났다.

The Task of the Fashion Designer in Different Types of Domestic Women's Apparel Brands - Focusing on the Fashion Merchandising Process -

  • Kwon, Hae-Sook;Lee, Eun-A
    • 패션비즈니스
    • /
    • 제8권6호
    • /
    • pp.90-102
    • /
    • 2004
  • The purpose of this research is to identify the phases of the fashion merchandising process and the range of the fashion designer's work as well as performing degree at each stage according to the brand types of domestic women's apparel. The preliminary research was conducted with the chief designers of five woman's apparel manufactures located in Seoul and the questionnaires were collected from 192 fashion designers. They were measured by the five point Likert-type scales. For a data analysis, the Pearson's Correlation, ANOVA, Sheffe Test, MANOVA were used with SPSS V. 11.0. The results are as follows; 1. The steps which fashion designers of domestic apparel brand take in fashion merchandising process have been identified in 7 stages- Environment Information, Target Market Planning, Design Planning, Design Development, Price Settlement, Presentation & Line Release, Production. 2. The task achievement level of fashion designers in fashion merchandising process differs in brand types as well as in fashion merchandising stages. In NB, the designer's work was conducted in order of Design Planning(M=4.58)$\to$Presentation & Line release(M=4.31)$\to$ Environment Information(M=3.83)$\to$Target Market Planning(M=3.13). In DB, in order of Price Settlement (M=4.80)$\to$Production(M=4.33)$\to$Design Development(M=4.27)$\to$Design Planning(M=3.77)$\to$Presentation & Line release(M=3.20)$\to$Environment Information (M2.70). In GB, in order of Production(M=4.38)$\to$Design Planning(M=4.22)$\to$Price Settlement(M4.16)$\to$Environment Information(M=3.83)$\to$Merchandising Target Market (M=3.72)$\to$Design Development(M=3.65). 3. Considering the other factors such as sales, the amount of owning shops, item amounts that are related to the company size, this study shows that only the brand type affects designer's task achievement.

반도체 프로브 공정에서의 2단계 계층적 생산 계획 방법 연구 (Two-Level Hierarchical Production Planning for a Semiconductor Probing Facility)

  • 방준영
    • 산업경영시스템학회지
    • /
    • 제38권4호
    • /
    • pp.159-167
    • /
    • 2015
  • We consider a wafer lot transfer/release planning problem from semiconductor wafer fabrication facilities to probing facilities with the objective of minimizing the deviation of workload and total tardiness of customers' orders. Due to the complexity of the considered problem, we propose a two-level hierarchical production planning method for the lot transfer problem between two parallel facilities to obtain an executable production plan and schedule. In the higher level, the solution for the reduced mathematical model with Lagrangian relaxation method can be regarded as a coarse good lot transfer/release plan with daily time bucket, and discrete-event simulation is performed to obtain detailed lot processing schedules at the machines with a priority-rule-based scheduling method and the lot transfer/release plan is evaluated in the lower level. To evaluate the performance of the suggested planning method, we provide computational tests on the problems obtained from a set of real data and additional test scenarios in which the several levels of variations are added in the customers' demands. Results of computational tests showed that the proposed lot transfer/planning architecture generates executable plans within acceptable computational time in the real factories and the total tardiness of orders can be reduced more effectively by using more sophisticated lot transfer methods, such as considering the due date and ready times of lots associated the same order with the mathematical formulation. The proposed method may be implemented for the problem of job assignment in back-end process such as the assignment of chips to be tested from assembly facilities to final test facilities. Also, the proposed method can be improved by considering the sequence dependent setup in the probing facilities.

도시녹지의 에너지절약 및 대기 $CO_2$ 농도저감과 계획지침 (Energy Saving and Reduction of Atmospheric $CO_2$ Concentration by, and Planning Guideline for Urban Greenspace)

  • 조현길;이기의
    • 한국조경학회지
    • /
    • 제27권5호
    • /
    • pp.38-47
    • /
    • 2000
  • Carbon dioxide is a major greenhouse gas causing climate change. This study quantified annual direct and indirect uptake of carbon by urban greenspace, and annual carbon release from vegetation maintenance and fossil fuel consumption. The study area was whole Chuncheon and Kangleung, and also two districts of Kangnam and Junglang in Seoul, cities located in middle Korea. Carbon uptake by urban greenspace played an important role through offsetting carbon release by 6-7% annually in Chuncheon and Kangleung. For Kangnam and Junglang, where the population density was relatively higher, urban greenspace annually offset carbon release by 1-2%. Future possible tree plantings could double annual carbon uptake by existing trees in urban lands (except natural and agricultural lands) of a study city. Based on study results, planning and management guidelines for urban greenspace were suggested to save energy and to reduce atmospheric $CO_2$ concentrations. They included selection of optimum tree species, proper planting location from buildings, design of multilayered planting, amendment of existing regulations for greenspace enlargement, avoidance f intensive vegetation maintenance, and conservation of natural vegetation.

  • PDF