• 제목/요약/키워드: Relative Construction Cost

검색결과 92건 처리시간 0.024초

이중선체 벌크 캐리어의 선체 구조설계 (Structural Design of Double Hull Bulk Carrier)

  • 조규남;송하철;천병희;김민원;김민
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.303-310
    • /
    • 2002
  • After many casualties with conventional bulk carriers in recent years, double hull bulk carrier was proposed to enhance the structural safety of side shell and transverse bulkhead. In this paper, two alternative structural designs of double hull bulk carrier were executed based on the Lloyd's rule, and the results were examined in comparison with the existing single hull bulk carrier in the viewpoints of the increase of weight and construction cost. The relative construction concept was used to certify the economical validity of double hull bulk carrier.

  • PDF

이중선체 벌크 캐리어의 선체 구조설계 및 경제성 검토 (Structural Design and Economical Assessment of Double Hull Bulk Carrier)

  • 조규남;송하철;천병희;성아현;박상욱;김옥천
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2002년도 추계학술대회 논문집
    • /
    • pp.56-60
    • /
    • 2002
  • After many casualties with conventional bulk carriers in recent years, double hull bulk carrier was proposed ta enhance the structural safety of side shell and transverse bulkhead. In this paper, two alternative structural designs of double hull bulk camel were executed based an the Lloyd's rule, and the results were examined in comparison with the existing single hull bulk carrier in the viewpoints of the increase of weight and construction cost. The relative construction concept was used to certify the economical validity of double hull bulk carrier.

  • PDF

Critical Criteria Based on Facility Condition Index for Supporting Priority Decision-making in Educational Facilities

  • Shin, Seung Woo;Yi, June Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.687-688
    • /
    • 2015
  • The objective of identifying the cause of inconsistency in determining priority of educational facility maintenance, any related factors were thoroughly identified and tested, to see if it has any effect on decision-making process in resource allocation for educational facilities. On the assumption that 'the more there are to be repaired/maintained and deferred, the higher the relevant cost will be, this will lead to a significant social loss. Accordingly, this study established a framework of determining resource allocation priority based on deferred maintenance and its related expenses. For doing so, it was required to determine relative ranking in terms of resource allocation within a pre-assigned school district, in consideration of the criticality of each deferred maintenance attribute/variable.

  • PDF

터널건설공법 선정을 위한 의사결정기법의 개선방안 연구 (A study on the improvement in decision making analysis for the selection of tunnel construction method)

  • 박준경;전성권;김영근;허은녕
    • 한국터널지하공간학회 논문집
    • /
    • 제4권4호
    • /
    • pp.261-276
    • /
    • 2002
  • 지하철 터널의 합리적인 건설공법 채택을 위해 최근 건설공법의 선정에 적용되고 있는 VE 및 LCC기법의 문제점을 분석하여 개선안을 도출하고자 정성적인 분석에 있어서 AHP기법을 통한 가능한 여러 대안들간의 상대적 중요도를 결정하는 방식으로 객관성을 확보하고자 하였다. 또한, 정량평가에 있어서는 경제적인 터널구조물 건설을 목적으로 설계단계에서 기존 LCC 기법에서 고려하지 못하는 건설공사에 따른 사회적 손실을 비용으로 환산하는 LCSC 평가기법을 제안하였다. 실제 지하철 ${\bigcirc}{\bigcirc}$공구에 적용사례를 통해 그 효용성을 검증하였으며, 검토결과 해당 공구에서는 정성평가 및 정량평가 항목 모두에서 개착공법 보다는 터널공법의 채택이 합리적인 대안으로 평가되었다.

  • PDF

건설재해손실 영향요인 및 우선순위 분석 - 비보험비용 항목을 중심으로 - (An Analysis of Influential Factors and their Prioritization in Association with the Loss from Construction Disasters with a Focus on Uninsured Categories)

  • 양용구;김병석
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.23-34
    • /
    • 2014
  • With a view to analyzing the influential factors and their prioritization in association with the loss from construction disasters, this study has presented relative weighted value and importance for each category of loss by making a systematic classification of costs for non-insured categories (indirect costs) and conducting AHP analysis based on results of a survey of specialists. Through the study, first, I have divided the larger classification of loss factors into human loss factor, financial loss factor, special cost factor, and managerial loss factor, and, second, have presented prioritization of loss categories by allotting scores based on weighted values after calculating weighted value through pairwise comparison of loss levels. Based on these results of the study, we should be able to qualitatively calculate the loss costs that construction disasters inflict on business, promote rational decision-making and efficiency in spending related to a disaster, and compare it against safety investment designed to reduce disaster loss from the perspective of business strategy.

건설공사 상대적 위험도 산정 (Estimating Relative Risk Level of Construction Work)

  • 손기상;양학수;갈원모
    • 한국안전학회지
    • /
    • 제21권5호
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

Foundation Differential Settlement Included Time-dependent Elevation Control for Super Tall Structures

  • Zhao, Xin;Liu, Shehong
    • 국제초고층학회논문집
    • /
    • 제6권1호
    • /
    • pp.83-89
    • /
    • 2017
  • Due to the time-dependent properties of materials, structures, and loads, accurate time-dependent effects analysis and precise construction controls are very significant for rational analysis and design and saving project cost. Elevation control is an important part of the time-dependent construction control in supertall structures. Since supertall structures have numerous floors, heavy loads, long construction times, demanding processes, and are typically located in the soft coastal soil areas, both the time-dependent features of superstructure and settlement are very obvious. By using the time-dependent coupling effect analysis method, this paper compares Shanghai Tower's vertical deformation calculation and elevation control scheme, considering foundation differential settlement. The results show that the foundation differential settlement cannot be ignored in vertical deformation calculations and elevation control for supertall structures. The impact of foundation differential settlement for elevation compensation and pre-adjustment length can be divided into direct and indirect effects. Meanwhile, in the engineering practice of elevation control for supertall structures, it is recommended to adopt the multi-level elevation control method with relative elevation control and design elevation control, without considering the overall settlement in the construction process.

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • 차희성
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

VE 기법을 이용한 토취장 선정에 관한 연구 (A Study on the Selection of Borrow Pits by Using VE Techniques)

  • 김승기;이병석;양재혁;이종천;김찬기
    • 한국지반신소재학회논문집
    • /
    • 제15권1호
    • /
    • pp.59-70
    • /
    • 2016
  • 본 연구에서는 Value Engineering 기법을 토취장 선정의 도구로 활용할 수 있는지의 여부를 검토하였다. 이를 위해 대규모 택지개발지역의 토취장 후보지들에 대한 지반조사 결과를 분석한 후 토취장 후보지들의 가채량을 산정하였으며, 토취장 후보지들의 VE 평가에는 가중치 부여 매트릭스평가법을 적용하였다. VE 평가를 위해 평가항목을 결정한 후 중요도를 산정하고 평가척도를 설정하였으며, 토취장 후보지에 대한 성능등급 및 성능평가를 수행하여 토취장 후보지들의 개발 우선순위를 결정하였다. 결과적으로 토취장 후보지들에 대한 상대공사비는 운반거리와 밀접한 관련이 있으며, 운반거리가 멀어질수록 상대공사비는 점차 증가하므로 운반거리가 토취장 선정에 있어 상당한 영향을 미친다는 것을 확인하였다. 또한 최적의 토취장 후보지를 선정하는데 있어 토취장 자체의 조건도 중요하지만, 생애주기비용의 영향을 무시할 수 없는 것으로 나타났다.

AHP 분석을 통한 종합병원 리모델링 공사의 리스크 요인 우선순위 평가 (An Evaluation of the Importance of Risk Factors for the General Hospital Remodeling Approached by Analytic Hierarchy Process (AHP))

  • 문성주;고성석
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제30권3호
    • /
    • pp.45-56
    • /
    • 2024
  • Purpose: It is important to note that the relative importance of risk factors should be identified to successfully complete the remodeling project of general hospital. Approached by analytic hierarchy process (AHP), the present study aimed to systematically evaluate the risk factors for remodeling of general hospital. Methods: The present work classified the risk factors of general hospital remodeling into four major categories including the requirements survey stage, planning and design stage, dismantling and construction stage, and maintenance stage. In addition, four sub-categories were derived from each major category factor. Furthermore, five major categories and four subcategories were selected to be considered from the perspectives of two stakeholders of contractor and constructor. The relative importance of the major and sub-categories factors was calculated using the AHP technique on the survey data collected from 49 respondents who participated in the survey study. Results: The results indicate that, the risk factor of requirements survey stage was found to be the most important risk factor to consider among the four major categories of factors. Also, insufficient preliminary investigation, design inconsistencies in architecture/mechanics/electricity, occurrence of safety accidents, and insufficient review of various equipment capacities and performances were found to have the highest priorities of each subcategory factor group included in the four major categories. From the perspective of contractor, the error in predicting the construction period was found to be the most important risk factor. The occurrence of safety accidents during construction was found to be the most important risk factor to be considered by constructor. Implications: The result of the current work should provide important insights and guidelines for the risk management activity that contributes to controlling the project time, cost, and scope required for general hospital remodeling.