• Title/Summary/Keyword: Reduction of construction period

Search Result 225, Processing Time 0.032 seconds

Bearing Capacity Evaluation of Drilled Shaft for Top & Down Method (탑다운 기초 현장타설말뚝의 지지력 평가)

  • Cho, Chun-Whan;Kim, Hong-Mook;Kim, Woong-Kyu;Kwon, Se-Oh;Sung, Byung-Wan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.58-65
    • /
    • 2004
  • Recently, the top & down method with drilled shafts as a foundation of high rise building is often adopted for the purpose of construction period reduction and construction cost effectiveness. It is common to omit the loading test as a Quality assurance on account of the high capacity of drilled shafts for the top & down method. It seems that the capacity of drilled shaft in recent top & down method is beyond that of conventional loading test method.However, the quality assurance for the drilled shaft as foundation of high rise building becomes much more important since the drilled shaft should bear much higher working load. It may be a small scale test pile could be an alternative as a quality assurance for the drilled shaft with high capacities. Through a case study, this paper gives an idea for solving the limitation of the conventional loading test method for the quality assurance of drilled shaft with high capacities. In particular, this paper analyzed the scale effect for a small drilled shaft installed into bedrock, which could be used for an alternative.

  • PDF

Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method (CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례)

  • Lee Jeong-Bae;Lim In-Sig;Kim Dong-Hyun;Oh Bo-Hwan;Ha In-Ho;Rhim Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

Requirement Analysis Study for Development of 3D Printing Concrete Nozzle for FCP Manufacturing (FCP 제작용 3D 프린팅 콘크리트 노즐 개발을 위한 요구사항 분석연구)

  • Youn, Jong-Young;Kim, Ji-Hye;Kim, Hye-Kwon;Lee, Donghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.65-66
    • /
    • 2022
  • In the construction industry, interest in technologies such as 3D Construction Printing (3DCP) is increasing, and research is being conducted continuously. In the case of atypical architecture, different shapes must be implemented, and the introduction of 3D printing technology is intended to solve it. Our researchers are conducting research to produce Free-form Concrete Panel (FCP). It automatically manufactures the FCP's formwork without any error with the design shape. At this time, the concrete nozzle based on the 3D printing technology is developed and the concrete is precisely extruded into the manufactured form to prevent the deformation of the formwork that can occur due to the concrete load. Therefore, in this study, the requirements for the development of 3D printing concrete nozzles for FCP manufacturing are analyzed. Based on the analyzed requirements, the first nozzle was developed. Such equipment is easy to shorten construction period and cost reduction in the atypical construction field, and is expected to be utilized as basic 3D printing equipment.

  • PDF

The Study of Project Management Information System Establishment for Construction (건설사업관리 정보시스템(PMIS)구축에 관한 연구)

  • Yoon Jae-Ho;Moon Young-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.132-138
    • /
    • 2002
  • Recently, utilization of PMIS(Project Management Information System) is in high demand as it is desired to advance the construction market through cost reduction and quality improvement within the given schedule. However, PMIS developed by individual projects are mostly evolving around construction progress status due to the temporary nature of development period and use of the system by project executers is no more than perfunctory that results in limiting the effective communication between the project owner, project manager and constructor. Therefore, the purpose of this paper is to review the PMIS developed so far, and present the direction for an effective PMIS.

A Study on Grounding Resistance by Parallel Connection (병렬 접속에 의한 접지저항에 관한 연구)

  • 고희석;최종규;류희석;김주찬
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.307-312
    • /
    • 2002
  • For accuracy of an experiment, measure changing of grounding resistance by short period after construction and investigated the efficiency of grounding's different methode of parallel connection. We could confirm on measurement's accuracy, error through comparing the theoretical value and measured value. Therefore, reduction ratio can be expected from execution measurement to receive a target resistance value. By the result, we could evaluate the method of rod grounding electrode's proper execution

  • PDF

Field Application of the Difference of Setting Time of Improving Super Retarding Agent of Foundation Mat Mass Concrete (기초매트 매스 콘크리트의 초지연제를 활용한 응결시간차공법의 현장적용)

  • Noh, Sang-Kyun;Baek, Dae-Hyun;Kwon, Hae-Won;Bae, Yeoun-Ki;Chung, Sung-Jin;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.57-60
    • /
    • 2008
  • According to the recent tendency that the buildings in the downtown concerning rising land prices and efficient use of building are gradually Manhattanized mainly the grand scaled residential buildings, structure of the buildings relates to safety and so the very thick mat concrete is selected as the foundation of architectures. Because mat concretes can not be simultaneously pour in a great quantity due to the circumstance at the field, not only the questions on the unification between the concretes pour on the upper layer and the lower layer are presented but also the cracks by the internal force from the difference of hydration exothermic period are occurred because of the time lag. Thus, this study checked the efficiency to apply "The hydration heat controlling method of mass concrete for horizontal partition pouring construction" to the skyscraper sites under construction at Haiundai in Busan. After applying this method, the result of observation that the cracks by hydration heat in all over the placement surface did never be founded. Also, in case of the economic analysis that the hydration heat reduction method using super retarding agent by difference of setting time is approximately 80% cheaper than the hydration heat reduction method by pipe cooling in the construction expenses.

  • PDF

Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea

  • Jung, In-Hye;Roh, Ho-Young;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.149-156
    • /
    • 2020
  • Blast furnace revamping in steel industry is one of the most important work to complete the complicated equipment within a short period of time based on the interfaces of various types of work. P company has planned to build a Smart Tracking System based on the wireless tag system with the aim of complying with the construction period and reducing costs, ahead of the revamping of blast furnace scheduled for construction in February next year. It combines the detailed design data with the wireless recognition technology to grasp the stage status of design, storage and installation. Then, it graphically displays the location information of each member in relation to the plan and the actual status in connection with Building Information Modeling (BIM) 4D Simulation. QR Code is used as a wireless tag in order to check the receiving status of core equipment considering the characteristics of each item. Then, DB in server system is built, status information is input. By implementing BIM 4D Simulation data using DELMIA, the information on location and status is provided. As a feature of the S/W function, a function for confirming the items will be added to the cellular phone screen in order to improve the accuracy of tagging of the items. Accuracy also increases by simultaneous processing of storage and location tagging. The most significant effect of building this system is to minimize errors in construction by preventing erroneous operation of members. This system will be very useful for overall project management because the information about the position and progress of each critical item can be visualized in real time. It could be eventually lead to cost reduction of project management.

  • PDF

Quantification of the CO2 Footprint in Residential Construction

  • Don Mah;Juan D. Manrique;Haitao Yu;Mohamed Al-Hussein;Reza Nasseri
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.525-536
    • /
    • 2009
  • The current residential process adheres to a traditional method of construction involving wood framing on-site on poured concrete foundations which has been widely applied in North America. A conventional residential construction process can include seventeen distinct stages ranging from stake-out to pre-occupancy inspection. The current practice possesses short comings including high construction material wastes, long scheduling timelines, adverse weather conditions, poor quality, low efficiencies and negative environmental impacts from transportation and equipment use. Over CAN $5 billion dollars was spent in the construction sector during 2007 in Canada. Previous findings in CO2 emissions during the construction process of a conventional dwelling emphasize more than 45 tonnes of CO2 emissions. Hence, in Alberta alone during 2007, almost 50,000 residential units would release more than two million tonnes of CO2. These numbers demonstrate the economical and environmental impact in building construction and its relationship with CO2 emissions. The aim of this paper is to quantify the CO2 emissions from the current residential construction process in order to establish the baseline for CO2 emission reduction opportunities. The quantification collection methodology will be approached by identifying the seventeen various stages of construction and quantifying the contributions of CO2 from specific activities and their impacts of work for each stage. The approach of separating these into separate stages for collection will allow for independent opportunities for analysis from various independent contractors from the entire scope of work. The use of BIM will be implemented to efficiently quantify CO2 emissions. Based on the CO2 quantification baseline, emission reduction opportunities such as an industrialized construction process will be introduced that allows homebuilders to reduce the environmental and economical impact of home construction while enabling them to produce higher quality, more energy efficient homes in a safer and shorter period of time.

  • PDF

Implementation of Customized EPM for Collaborative Resource Procurement in Small and Medium Size Plant Construction Enterprises (중소플랜트기업의 협업자원조달을 위한 Customized EPM구현)

  • Nam, Jung-Tai;Kim, Sung-Hun;Han, Young-Geun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.133-141
    • /
    • 2008
  • The need for total enterprise management that covers from accepting orders, design, cost, procurement, manufacture, and delivery has been recently raised in order for efficient project management of small and medium size plant construction enterprises. This trend is reflected in the introduction of EPM(Enterprise Project Management) solutions by some shipbuilding enterprises and large construction corporations. In step with the trend, small and medium size plant construction enterprises are enabled to provide knowledge base in terms of reducing cost and production period and managing portfolio for accepting orders and attaining contract by inducing customized EPM This study presents a design of customized EPM based on a case study of a company. It exhibits a collaborative/collaboration resource-supply model which can be universally applied to small and medium size job-order production enterprises. The research discusses that under the assumption that information is shared internally between departments on planning, supply, manufacture, and quality control in order to create collaborative environment and close participation is created externally between suppliers and orderers, productivity can be improved in cost reduction through planning efficient collaborative supply model.

Study on Development of CWS (buried wale Continuous Wall System) Method (CWS공법(buried wale Continuous Wall System)의 개발에 관한 연구)

  • Lee Jeong-Bae;Lim In-Sig;Chun Sung-Chul;Oh Boh-Wan;Ha In-Ho;Rhim Hong-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.2 s.20
    • /
    • pp.81-89
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved qualify and reduction of construction period can be obtained from CWS method.