Study on Development of CWS (buried wale Continuous Wall System) Method  

Lee Jeong-Bae ((주)한빛구조엔지니어링)
Lim In-Sig ((주)한빛구조엔지니어링)
Chun Sung-Chul ((주)대우건설 기술연구원)
Oh Boh-Wan ((주)대우건설 기술연구원)
Ha In-Ho ((주)대우건설 건축기술팀)
Rhim Hong-Chul (연세대학교 건축공학과)
Publication Information
Journal of the Korea Institute of Building Construction / v.6, no.2, 2006 , pp. 81-89 More about this Journal
Abstract
A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved qualify and reduction of construction period can be obtained from CWS method.
Keywords
Buried steel wale; Temporary steel bracket; Rigid diaphragm; Continuous placement of wall concrete;
Citations & Related Records
연도 인용수 순위
  • Reference
1 대우건설 건축기술팀, 탑다운 시공 매뉴얼, 1999
2 토목공법연구회, 톱다운공법 구조와 시공, 도서출판 일광, p99, 2005
3 방배동 A 현장 공사지 및 견적서, 2005
4 서울대역 B현장 공사지 및 견적서, 2005
5 (주) 한빛구조 외, 매립형 철골띠장과 슬래브 강막작용을 이용하여 지하외벽의 연속시공이 가능하도록 한 지하구조물 시공방법, 특허출원서, 2004
6 대한건축학회, 건축기술지침 I, 공간예술사, 2006
7 이동희, 탑다운 공법 시공, 기문당, p67, 2002
8 (주)SPS, SPS 공사자료