• Title/Summary/Keyword: Reduction of construction period

Search Result 225, Processing Time 0.031 seconds

An Experimental Study on the Early Strength Prediction of Concrete by Maturity Method (적산온도법을 이용한 콘크리트 조기강도 예측에 관한 실험적 연구)

  • Kwon, Hae-Won;Bae, Yeoun-Ki;Kim, Suk-Il;Jee, Suk-Won;Lee, Jae-Sam;Song, In-Myung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.753-756
    • /
    • 2008
  • Recently, construction work period reduction is a very important topic of construction business circles. Because that is just big cost reduction. There is an important part of construction to decide the removal time of form. For prediction strength for removal form, P type schmidt hammer method and maturity method is used that. In case early strength prediction of maturity method, that is problem. Because setting duration of concrete is not proper considering. So this experimental study is a coefficient(A) of maturity method.

  • PDF

The Experimental Study on improvement the pump sending of the light weight concrete using the light weight aggregate (경량골재를 사용한 경량콘크리트의 펌프압송 성능향상에 관한 실험적 연구)

  • Park Dae-Oh;Seo Chee-Ho;Ji Suk-Won;Lee Jin-Woo;Shin Sang-Tae;Jee Suk-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.23-26
    • /
    • 2006
  • The study about the concrete to use recently a light weight aggregate, processed actively. And concrete pumping with a high pressure pump has been popularized, the mechanical development, such as high pressure pumps or pipes, is progressing rapidly. Concrete placing by pumping has the advantage of the reduction of the construction period with workability, easiness of work and the increase of placing, but the quality variation of concrete is caused by pumping is seldom considered, including the increase of the pipe length by high-rising and large-sizing, there by the loss of the unit quantity of water, with pumpability or workability deteriorated. In this research, we will compare and analyze before pumping and after pumping samples of ready-mixed light weight concrete. The result of study as follow. The case of a light weight concrete which the low slump is more decrement compared with high slump light weight concrete in after pumping samples. After pumping the water by pressure of a pump was absorbed to the aggregate inside, and it showed an increase of compression strength about $5{\sim}20%$.

  • PDF

A Basic Study of Dynamic Simulation Model for In-situ Production and Erection of Precast Concrete Members (PC의 현장생산-설치 통합관리를 위한 동적 시뮬레이션 모델 기초연구)

  • Son, Seung-Hyun;Kim, Ki-Ho;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.42-43
    • /
    • 2019
  • In-situ production of PC (precast concrete) members can reduce costs by about 14.5% -21.6% compared to in-plant production due to the reduction of transportation costs, factory profits and overhead costs. However, in-situ production of PC members presents a variety of risks, including member production and yard area securing, and lead time for production within the installation period. To solve this, it is necessary be able to analyze and control and monitor the risk factors that influence in-situ production for PC member. The purpose of this study is to develop a dynamic simulation model for in-situ production and erection integrated management for PC members. For this study, risk factor identification, causal loop diagram, and dynamic simulation model construction were performed sequentially. The results of this study will be used as a basis for developing a risk management model for PC in-situ production.

  • PDF

A Case of the Alternative Method to Improve the Ambient Vibration Blasting Method Applied NATM Tunnel Construction in Urban Areas (도심지 NATM 터널 굴착시 적용된 미진동발파 공법 개선사례)

  • Lee, Jong-Yoon;Hwang, Yeon-Soo;Choi, Hack-Yong;Bae, Hyo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.535-542
    • /
    • 2010
  • Various difficulties have been increased in the construction of public structure; like the road in the overcrowding urban area, because of civil complaint, cost and period of construction. In oder to overcome these social problems, the tunnel has been planned the road design. Despite the resolution, there are many technical problems when constructed near facilities. The design of new tunnel below the existing service reservoir is applied to the ambient vibration blasting using Plasma. The result of test blasting was exceeded the standard ("2kine"). So it was considered a countermeasure for the vibration reduction applied to change the controlled blasting method, reduce the charge, add the pre middle horizontal hole in the cut blasting site, and so on. The result was satisfied the standard. Accordingly, if the quality of blasting process can be managed well, the application of this alternative method is highly effective one. Also, based on cost analysis between two methods, the alternative method is very competitive.

  • PDF

Investigation for Developing 3D Concrete Printing Apparatus for Underwater Application (수중적층용 3D 콘크리트 프린팅 장비 개발에 대한 연구)

  • Hwang, Jun Pil;Lee, Hojae;Kwon, Hong-Kyu
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.10-21
    • /
    • 2021
  • Recently, the demand for atypical structures with functions and sculptural beauty is increasing in the construction industry. Existing mold-based structure production methods have many advantages, but building complex atypical structures represents limitations due to the cost and technical characteristics. Production methods using molding are suitable for mass production systems, but production cost, construction period, construction cost, and environmental pollution can occur in small quantity batch production. The recent trend in the construction industry calls for new construction methods of customized small quantity batch production methods that can produce various types of sophisticated structures. In addition to the economic effects of developing related technologies of 3D Concrete Printers (3DCP), it can enhance national image through the image of future technology, the international status of the construction civil engineering industry, self-reliance, and technology export. Until now, 3DCP technology has been carried out in producing and utilizing residential houses, structures, etc., on land or manufacturing on land and installing them underwater. The final purpose of this research project is to produce marine structures by directly printing various marine structures underwater with 3DCP equipment. Compared to current underwater structure construction techniques, constructing structures directly underwater using 3DCP equipment has the following advantages: 1) cost reduction effects: 2) reduction of construct time, 3) ease of manufacturing amorphous underwater structures, 4) disaster prevention effects. The core element technology of the 3DCP equipment is to extrude the transferred composite materials at a constant quantitative speed and control the printing flow of the materials smoothly while printing the output. In this study, the extruding module of the 3DCP equipment operates underwater while developing an extruding module that can control the printing flow of the material while extruding it at a constant quantitative speed and minimizing the external force that can occur during underwater printing. The research on the development of 3DCP equipment for printing concrete structures underwater and the preliminary experiment of printing concrete structures using high viscosity low-flow concrete composite materials is explained.

A Study on Establishment of the Directions of Granting Incentives by Long-life Housing-related parties (장수명 주택 관계자별 인센티브 부여 방향 설정에 관한 연구)

  • Kim, Eun-Young;Jang, Soon-Gak;Hwang, Eun-Kyoung
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.1
    • /
    • pp.93-100
    • /
    • 2016
  • Long-life housing means a housing which structural members (Support) such as columns and floor are maintained for a long period of time and the housing can be used for approximately 100 years by replacing components (Infill) such as walls and furniture. The government established "Certification standards of long-life housing construction" on December 24, 2014, requiring the long-life housing certification for construction of apartment houses for over 1,000 households. However, it is necessary to prepare an incentive measure which could be granted to construction related personnel and housing owners due to the effectiveness of such system and recognition that the initial construction cost of long-life housing is high. The purpose of this study is as follows. First, the reasons and necessity of long-life housing cost increase for each construction company, housing owner, infill component manufacturer and designer which are long-life housing related personnel are determined. The direction of incentive grant for supplying long-life housing based on the determined items is established. The result of this study is as follows. First, a special treatment which is higher than the alleviation of construction standards according to the previous ordinance is necessary for construction companies to secure the business feasibility. Also, incentives such as the provision of service space and wide balcony are necessary to improve the preference level of parceling out. Second, financial incentives such as financial support for housing purchase, reduction and exemption of tax (acquisition tax and registration tax), and support of maintenance cost are required for house owners. Third, it is essential to increase opportunities to participate in the market for infill component manufacturers by applying additional points for PQ. Fourth, it is needed to provide compensation for additional human resource and time at the time of designing to designers by preparing the long-life housing design cost standards.

A Study on Preference of Apartments Remodeling Items for Reducing Construction Waste (건설폐기물 발생저감을 위한 공동주택 리모델링 항목의 선호도에 대한 연구)

  • Chae, Kyeong-Seok;Ang, Yun-Sun;Kim, Yong-Sung;Jung, In-Su;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.116-123
    • /
    • 2010
  • Since the Enforcement Decree of the Housing Act was changed in 2007, remodeling demands have increased. For this reason, many research studies are actively discussed for vitalizing remodeling, but countermeasure plan for generated construction waste is not enough. This study aims to provide basic data for the reduction plan of construction waste caused by the remodeling project through the investigation of apartments residents' priorities about remodeling elements for reducing construction waste. In this study, remodeling elements have been drawn through the literature investigation. As a result, subordinates were classified into 21 elements and superordinate were classified into 6 elements. Expert interviews were conducted to check the reliability about subordinate and superordinate elements of remodeling and the questionnaire survey were conducted to determine the residents preference of apartments remodeling elements. As a result of the questionnaire survey, we found out the characteristic of preference for apartments remodeling elements such as the period of apartment, the location and the financial condition respectively. This study presents a basic data for considering the remodeling as well as the apartment plans for the resident's preference. Further, many studies about the reduction plan of construction waste caused by the remodeling project will have to be discussed.

A Business Model for Application of the Modular Building in the Rental Market (건축 임대시장에서 모듈러 건축의 적용성 연구 - 수익성 분석을 중심으로 -)

  • Yoon, Jongsik;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.3-11
    • /
    • 2015
  • The current real estate market is in a state that is considerably shrink due to the recession and long-term reduction of trading. In response, the government recently announced an innovative way for the middle-class residential housing and it is taking the lead to activate the real estate market. Meanwhile, the domestic housing market is entering a transition period, including structural changes of household structure, changes from joeonse to rent increasingly. Also single-member households will rise steeply, so that makes the high demand of small houses. In addition, the domestic construction industry is interested in new technology called Modular building. The Modular construction is an off-site construction system that shorten construction period, eco-friendly building technology and mobility etc, which can be used in various field. Overall, there are two major issues of the current market, one is the change of the real estate market, and the other is the modular construction. This study will propose modular business model in the rental market through the analysis the profitability of the modular business scenarios and IRR analysis.

Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.

Analysis of Operation System Establishment Cases for Efficient use of Risk Assessment at Construction Sites - H Focusing on Construction Company Cases (건설현장의 위험성평가 효율적 활용을 위한 운영 시스템 구축사례 분석 - H 건설사 사례중심으로)

  • Jae-Bung Lee
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.828-838
    • /
    • 2022
  • Purpose: Through the establishment of a computerized system of risk assessment, the purpose is to analyze the case of whether the co-workers who are subject to the risk assessment at the construction site can easily fill it out and expect disaster reduction through efficient risk assessment activities. Method: By providing the risk factors and safety measures for the work by selecting the type of work, the risk estimation and the establishment of countermeasures can be made, and a system has been established to enable practical disaster prevention activities by presenting disaster cases for the work. Result: Through the analysis of the change in the scaled disaster rate for the years following the on-site application after the establishment of the risk assessment computer system of H Construction Company, it was confirmed that the scaled disaster rate of the domestic construction industry increased, while the conversion disaster rate of H Construction Company decreased. Conclusion: Through the computational systemization of risk assessments, workers in the field can easily access the risk assessment, evaluate the risk factors of the process and establish risk prevention measures, and it has been analyzed that there is an impact on the reduction of the disaster rate during the operational analysis period.