Browse > Article
http://dx.doi.org/10.15683/kosdi.2022.12.31.828

Analysis of Operation System Establishment Cases for Efficient use of Risk Assessment at Construction Sites - H Focusing on Construction Company Cases  

Jae-Bung Lee (Department of Industrial Engineeing, Sunmoon University)
Publication Information
Journal of the Society of Disaster Information / v.18, no.4, 2022 , pp. 828-838 More about this Journal
Abstract
Purpose: Through the establishment of a computerized system of risk assessment, the purpose is to analyze the case of whether the co-workers who are subject to the risk assessment at the construction site can easily fill it out and expect disaster reduction through efficient risk assessment activities. Method: By providing the risk factors and safety measures for the work by selecting the type of work, the risk estimation and the establishment of countermeasures can be made, and a system has been established to enable practical disaster prevention activities by presenting disaster cases for the work. Result: Through the analysis of the change in the scaled disaster rate for the years following the on-site application after the establishment of the risk assessment computer system of H Construction Company, it was confirmed that the scaled disaster rate of the domestic construction industry increased, while the conversion disaster rate of H Construction Company decreased. Conclusion: Through the computational systemization of risk assessments, workers in the field can easily access the risk assessment, evaluate the risk factors of the process and establish risk prevention measures, and it has been analyzed that there is an impact on the reduction of the disaster rate during the operational analysis period.
Keywords
Risk Assessment; Accident Rate; Computerized System; Risk Factor; Converted Accident Rate; 4M; System Developmen;
Citations & Related Records
Times Cited By KSCI : 7  (Citation Analysis)
연도 인용수 순위
1 Bok, H., Kim, H.-T., Kang, K.-S. (2014). "Construction work by type risk factors increased levels proposed model for the PCRA (Pre Construction Risk Assessment) - Focusing on building construction." Journal of the Korea Safety Management & Science, Vol. 16, No. 3, pp. 9-22.
2 Choi, H.-J. (2022). "Risk assessment for disaster reduction in small-scale construction sites." Journal of the Society of Disaster Information, Vol. 18, No. 2, pp. 395-404.
3 Choi, S.H., Oh, T.K. (2013). "A study on the awareness of safety and health for practical application of risk assessment in construction industrie - Focused on worker." Journal of the Korean Society of Safety, Vol. 28, No. 2, pp. 60-65.   DOI
4 https://koisis.kr
5 https://www.kosha.or.kr
6 Jang, Y.-R., Go, S.-S. (2018). "A risk assessment counterplan for reducing the accident rates in medium and small sized construction sites." Korean Journal of Construction Engineering and Management, Vol. 19, No. 5, pp. 90-100.   DOI
7 Jeon, H.W., Jung, I.S., Lee, C.S. (2013). "Risk assessment for reducing safety accidents caused by construction machinery." Journal of the Korean Society of Safety, Vol. 28, No. 6, pp. 64-72.   DOI
8 Jung, J.w. (2014). "A study on the implementation of risk assessment system at workplace in Korea." Journal of the Korean Society of Safety, Vol. 29, No. 3, pp. 121-128.   DOI
9 Kim, J.H., Oh, T.K. (2016). "A case study on the improvement of risk assessment by worker - Oriented safety circle discussion in construction industry by the survey." Journal of the Korean Society of Safety, Vol. 31, No. 5, pp. 82-88.   DOI
10 Lee, H.-S. (2019). "A study on the application of safety design based on the risk of construction process." Journal of the Society of Disaster Information, Vol. 15, No. 4, pp. 493-501.
11 Paek, C.-H., Cho, U.-R. (2015). "A study on the optimization effectiveness of risk assessment in construction Industry." Journal of the Korea Safety Management & Science, Vol. 17, No. 3, pp. 15-22.   DOI
12 Paek, C.-H., Cho, U.-R. (2015). "A study on the perception level of health and safety among the participants for optimization of risk assessment in construction industry." Journal of the Korea Safety Management & Science, Vol. 17, No. 3, pp. 23-32.   DOI
13 Park, J.H., Park, H.C., Lee, K.H. (2013). "A study on the development of the safety work manual of a small construction site that takes advantage of the risk assessment methods." Korean Society of Safety Management Science Conference, pp. 301-310.
14 Seo, Y.H., Woo, I.S., Jang, C., Hwang, M.H. (2015). "Research on effectiveness of risk assessment of construction industry by self administered questionnaires." Risk Management Study, Vol. 26, No. 3, pp. 1-27.
15 Shin, S.S., Bae, Y.B., Ha, H.B., Kang, K.-S. (2014). "Crash of a small construction site accident analysis and risk assessment study - Focusing on project value of less than 20 billion small construction sites -." Journal of the Korea Safety Management & Science, Vol. 16, No. 4, pp. 41-51.   DOI