• Title/Summary/Keyword: Recloser

Search Result 60, Processing Time 0.031 seconds

A Study on Basic Technology for the Experimental Making of Miniaturized Electrical Power Distribution Line (소형화된 배전선로의 실험적 제작을 위한 기초 연구)

  • Oh, Se-Pil;Choi, Seong-Cheol;Kim, Young-Min;Kang, Ha-Na;Ko, Yun-Seok
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.12 no.6
    • /
    • pp.1107-1114
    • /
    • 2017
  • In this paper, a miniaturized distribution line was experimentally made. The smart grid distribution system was modeled by analyzing the distribution system, and a miniaturized micro three phase distribution system recloser was designed. The micro recloser was designed as a sensor part, a main part and a relay part, and the main part was designed to cut off the fault current by determining the fault from the input current based on the DSP. Finally, based on the results of the modeling, the micro three phase power distribution line and the micro three phase recloser were experimentally fabricated, and the basic making technology of the miniaturized micro smart grid was obtained through the making process.

Analysis on operation of Protective Equipment According to Application of SFCL in a Power Distribution System (분산전원이 도입된 배전계통에 초전도전류제한기 적용에 따른 보호기기 동작분석)

  • Lee, Yong-Seok;Jung, Sang-Hyun;Lim, Sung-Hun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.67-68
    • /
    • 2011
  • This paper analysed a protective equipment in power distribution system linked distribution power system when a superconducting fault current limiter(SFCL) is installed. This paper focused on a recloser, because the recloser is a general protective equipment. When power distribution system linked distribution power system, a fault current is increased by adding fault current of distribution power system. The increased fault current makes many problems. But SFCLs are limiting fault current and help the protective equipment to operate normal process. We analysed the operation of protective equipment in power distribution system linked distribution power system with SFCLs.

  • PDF

A Study of Propriety Capacity about Protection Scheme When Distribution System Interconnected with Distributed Resources (배전계통에 분산전원 연계시 보호협조측면에서 적정용량 검토)

  • Lee Yeon-Hwa;Choi Joon-Ho;Jung Hyun-Jun;Nam Hae-Kon;Moon Chae-Joo;Park Sung-Jun
    • Proceedings of the KIPE Conference
    • /
    • 2006.06a
    • /
    • pp.520-522
    • /
    • 2006
  • According to the second scheme of the Korean Government about technology development, utilization and popularization of new renewable energy, the continuous growth of distributed resources are expected. But there is a few paper about recloser and sectionalizer coordination and protection scheme in distribution system interconnected a number of distributed resources. In this paper, it is dealt with that recloser and sectionalizer coordination at the cases concerned with position among protection devices. Adding distributed resource, the problems of each case are investigated through simulation.

  • PDF

A Study on the Coordination Scheme Considering the Loss of Sensitive Load by Voltage Sag at Distribution System Interconnected Dispersed Generation (배전계통에 분산전원 연계시 전압강하에 의한 민감부하의 피해를 고려한 보호협조 연구)

  • Jung, Seung-Bock;Kim, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.363-365
    • /
    • 2003
  • Recently, the concern of power qualiaty problem is increasing. Especially, Voltage quality problem have been increased important problem. Electronic device was affected by voltage sag. So, sensitive load that included many electronic Device was affected by voltage sag. also, it may have economic loss. In this paper, we argue the coordination scheme considering the loss of sensitive load. The coordination device of distribution system for instaneous fault is recloser and sectionalizer, But, the fault clearing time of recloser is more than 2 seconds. So, voltage sag generates long time that affected sensitive load. HS(high speed switchgear) has fast fault clearing time(0.015s) that not affected sensitive load. Therefore, the coordination applied HS is used. The proposed schemes are proved and evaluated by a case study using PSCAD/EMTDC simulation.

  • PDF

Interface design Between AMR and DAS (AMR과 DAS의 인터페이스 구현)

  • Jung, Jum-Soo;Lee, Heung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.10
    • /
    • pp.126-133
    • /
    • 2008
  • Computer and communication of based IT technology use to das that remote control, monitoring, measuring automatic gas switch, recloser located far about $20{\sim}30[km]$. For increasing efficiency billing, metering of high voltage customer use to amr system. If between das and amr interface operate when generated fault in high voltage electric equipment of customer part, amr system serve to das quickly in fault information data, correct fault location.

A Study on the Electric Field Strength of Two Bushings for 17.5 kV Recloser (17.5 kV Recloser용 Bushing 2종에 대한 전계강도 연구)

  • Shin, Y.J.;Oh, Y.H.;Kim, M.K.;Lee, J.G.;Kim, S.J.;Kim, J.K.;Kim, K.S.;Jung, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.392-395
    • /
    • 2003
  • The study of electric field analyses has been conducted on two kinds of bushings for 17.5kV $SF_6$ gas insulated recloser. In this paper, two model bushings and input conditions for the analyses are described in detail. The results of the electric field analyses are presented and compared with to find out the better design in two bushings. Finally some suggestions are given for improving the insulation characteristics of the bushings.

  • PDF

A Novel Reclosing Scheme in Distribution System using Carrier Signal (Carrier 신호를 이용한 배전계통의 새로운 재폐로 방식)

  • Ko, Yun-Tae;Seo, Hun-Chul;Rhee, Sang-Bong;Kim, Chul-Hwan;Kim, Jae-Chul;Hyun, Ok-Bae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.11
    • /
    • pp.2115-2121
    • /
    • 2009
  • This paper proposes the new reclosing scheme considering the recovery time of SFCL in distribution systems which is based on variable dead time control. The main idea is that it uses the carrier signal to distinguish whether the fault is instantaneous or permanent after tripping the line by recloser. The system and SFCL is modeled by using Electromagnetic Transient Program(EMTP) and the validity of the reclosing scheme presented in this paper is analyzed according to the fault resistance, the recovery time of SFCL and the fault clearing time.

A study of the directional recloser and sectionalizer protective coordination at 22.9[kV] distribution system with new renewable energy generation (신재생에너지원이 연계된 22.9[kV] 배전계통의 양방향 리클로저와 섹셔널라이저 보호협조 방안)

  • Lee, Yeon-Hwa;Choi, Joon-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.525-526
    • /
    • 2007
  • Recently, there has been growing interest in utilizing distributed generation (DG). However, an insertion of DG to existing distribution system can cause several problems such as voltage variations, harmonics, protective coordination, increasing fault current etc,. The typical protection system of the existing distribution system is designed for radial network. But penetration of DG to distribution system changes existing unidirectional power flow to bidirectional power flow. Therefore, investigation to cover whole field of distribution system must be accomplished such as changing of protection devices rating by increasing fault current, reevaluation of protective coordination. This paper presents that PSCAD/EMTDC simulations was accomplished to analyze effect of DG on the distribution protective coordination. In addition, directional recloser-sectionalizer coordination are evaluates distribution system with DG by using PSCAD/EMTDC simulation.

  • PDF

Interface design Between AMR and DAS (자동 원격검침시스템과 DAS의 연계)

  • Jeong, Jeom-Su;Lee, Heung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.09a
    • /
    • pp.47-51
    • /
    • 2008
  • Computer and communication of based IT technology use to das that remote control, monitoring, measuring automation gas switch, recloser totaled far about $20{\sim}30km$. For increasing efficiency billing, metering of high voltage customer use to amr system. If between das and amr interface operate when generated fault in high voltage electric equipment of customer part, amr system serve to das quickly in fault information data, correct fault location.

  • PDF

Analysis of Switching Surge by Recloser Operation in Distribution System (배전계통에서 재폐로 동작으로 인한 개폐서지 영향 분석)

  • Lim, Kyong-Sub;Yeo, Sang-Min;Seo, Hun-Chul;Seong, No-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.315-317
    • /
    • 2008
  • 배전계통에서 발생한 사고의 80% 이상은 순간고장이다. 따라서, 배전계통에서 재폐로는 계통의 회복 및 신뢰도 향상을 위하여 반드시 필요한 사항이다. 그렇지만, 재폐로 순간 차단기의 동작으로 인하여 개폐서지가 발생할 수 있다 따라서 본 논문에서는 EMTP를 이용하여 고장 발생 시 차단기의 재폐로 동작을 모의하여 재폐로 동작 시 발생하는 개폐서지를 분석하였다.

  • PDF