• Title/Summary/Keyword: Re-maintenance Promotion Project

Search Result 4, Processing Time 0.021 seconds

A Study on the Characteristics of Landfill Expenses on Urban and Residential Environment Maintenance Project - Centered around Seoul City - (도시 및 주거환경정비사업 매몰비용 특성에 관한 연구 - 서울시를 중심으로 -)

  • Lee, Mi-Ok;Lee, Im-Jung
    • KIEAE Journal
    • /
    • v.17 no.2
    • /
    • pp.35-43
    • /
    • 2017
  • Purpose: The purpose of this study is to find out the characteristics of service (landfill) costs (hereinafter, the "landfill costs") applied to the dissolution promotion committee and analyze the characteristics of landfill costs at the time where the dissolution of promotion body is increasing with the authority of the head of local government regarding the territory difficult with the continuous promotion by delaying or suspending the project for a prolonged period or suspending the project through the dissolution of the project body by the promotion committee and cooperative union since the flawless promotion of the maintenance project. Method: After revising the law in February 2012, the survey and analysis is made for the status of applying landfill costs and maintenance project scale of the dissolution promotion committee not confirmed in details around a total of 20 regions, including, 9 regions of redevelopment projects completed with the advance review, 7 regions of re-construction projects and 4 regions of urban environment maintenance projects from the total of 59 regions, Result: The influence on the landfill costs is shown to be greatest in the service expenses and management and supervision on this field has significance for the maintenance project perceived as private project, rather than public project, that the public management is neglected with insufficient presentation of operation criteria and so forth that it displays the tendency to lead to the discrete operation of the project body. In order to enhance the transparency of operating costs for the projects that are led by private capital, it is required to strengthen the role of public sector through enthusiastic intervention by the public sector in standardization of operation criteria, presentation of guideline and so forth.

Survey of Natives Resettlement Consciousness in Urban Regeneration Project -Centered on the Re-Maintenance Promotion District of Asan City- (도시재생사업 추진에 있어 원주민 재정착 의식조사 -아산시 재정비촉진지구를 중심으로-)

  • Koo, Si-On
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.4
    • /
    • pp.282-291
    • /
    • 2010
  • This study is carried out in order to suggest the effective method to enhance the resettlement of natives for re-maintenance promotion district of Asansi. This study is carried out through current status survey, native survey, and examining related laws, and the result of study is as follows. First, as a result of examining the intention of resettlement for the residents and merchants who live in the project district, 84% of residents and 80% of merchants wish to resettle. Second, in order to enhance the rate of resettlement, driving project to satisfy the demands of residents and merchants is needed. For this, house supplying policy and complex design technique for corresponding this tendency is needed because they prefer to live a single houses or housing attached to shopping street of 100 million won valued below as well as apartments,. And new types of business which can activate the function of the old city are needed, but making commercial space where current merchants can constantly do business activities is demanded. Third, the expansion of urban regeneration concept which have economics, society, culture, welfare and community as well as physical environment improvement are emphasized is needed. Fourth, the role of government for urban regeneration should be strengthened, and institutional improvement should be supported. Government needs to constantly support including financial supporting in order for the regeneration of regional city, and especially should scout for the policies which community can be maintained and should support first. For this, utilizing public lands inside project district into leading project, government should utilize into "constructing rental houses for natives", inducing the leading key facilities. Fifth, various plan techniques for the resettlement of natives of other advanced countries should be examined and be achieved.

A Study on the Problems and Improvement Plan of Cadastral Map Data Maintenance Project (지적·임야도 자료정비 사업의 문제점 및 개선방안 연구)

  • Baek, Kyu-Yeong;Choi, Yun-Soo
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.1
    • /
    • pp.63-73
    • /
    • 2020
  • The Ministry of Land, Infrastructure and Transport carried out a pilot project for data maintenance in 2011 to ensure the accuracy of cadastral records nationwide, and now trying to reduce the errors such as omission of the cadastral book, inconsistency of land category between cadastral account book and cadastral map, etc. and the boundary between the map boundary, scale, and administrative areas. In this study, we looked at the currents status and problems of the cadastral research, improving the cadastral map, which has been promoted by the government and the cadastral office. In order to revitalize the cadastral map data maintenance project, it is necessary to re-establish the plan for each step for challenging the limitation of current data maintenance, and the master plan for promotion system, and develop manuals to maintain consistency and secure accuracy of cadastral map maintenance, such as "Coverage and Maintenance Guidelines for Cadastral Maps", and secure the national budget for error correction in cadastral map led by government.

Estimation of the Expected Socio-economic Benefits of the Largescale Comprehensive Agricultural Development Project and Jointcost Allocation -In the Case of Kumgang Project Area- (대단위 농업종합개발사업의 사회경제적 기대편익 추정과 결합비용의 배분 -금강지구를 중심으로-)

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.159-176
    • /
    • 1996
  • This study is aimed at reviewing the methods of joint cost allocation and allocating the joint cost of estuary dam with specially repect to Kumgang Large-scale Agricultural Comprehensive Development Project. Apart from the water resource development project propelled by Water Resource Development Corporation in connection with Law of Multipurpose Dam Development, the Largescale Comprehensive Agricultural Development Projects couldn't ins-titutionally be carried out cost allocation of common facilities, even though it were concerned with irrigation, municipal and industrical water supply, flood control, sightseeing and industrial zone development components. To decrease farmer's burden of the project costs and, operation and maintenance costs, the joint costs of common facilities like estuary dam included in agricultural development projects have to be allocated by suitable method as alternative cost-remaining benefit method and the analytical activity should be supported by revising the concerned laws as Rural Development and Promotion and, Rural Rearrangement conpatible with the law for multipurpose dam development. Kumgang Agricultural Comprehensive Development Project was selected as a case study for the estimation of socio-economic benefits by project components and joint cost allocation of the estuary dam. The main results of the study are as follows; Joint cost allocation and unit charges by components 1. The project area will be 25,554ha with total project cost of 624,860 million won including the estuary dam cost of 120,843 million won. The project costs were ex-pressed by 1994 constant price. 2. Total quantity of water was estimated 365 million tons which were consisted of 245 million tons for irrigation, 73 million tons for municipal water and 47 million tons for industrial water. 3. The rates of joint cost allocation were amounted to 34.2% for agriculture, 2.5% for sightseeing, 45.7% for transportation, 11.8% for M & I water supply and 5.8% for flood control respectively. 4. The unit financial charges by project components were estimated at 7.88 won per ton for irrigation, 16.11won for M & I water, 1,686won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The financial charges using straitline method for depreciation were estimated at 7.88won per ton for irrigation, 9.12won per ton for M & I water, 624won per vehicle one pass for transportation and 331won per Pyeong for sightseeing area. 5. The unit economic charges by project components were estimated at 21.1 won per ton for irrigation, 15.2won for M & I water, 977won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The economic charges using straitline method for depreciation were estimated at 11.72won per ton for irrigation, 8.61won per ton for M & I water, 331won per vehicle one pass for transportation. Policy recommendation 1. The unit operation and maintenance costs for irrigation water in the paddy field couldn't be imposed as the water resource cost untreated. 2. The dam costs including investment cost and O & M cost, as a joint cost, had to be allocated by each benefited components as transportation, M & I water supply, flood control, irrigation and drainage, and sightseeing. But the agricultural comprehensive project have been dealt as an irrigation project without any appraisal socio-economic benefits and any allocating the joint cost of estuary dam. 3. All the associated project benefits and costs must be evaluated based on accounting principle and rent recovery rate of the project costs and O & M costs should be regulated by the laws concerned. 4. The rural development and promotion law and rural rearrangement law have to be revised comprising joint cost allocation considering free rider problems. 5. The government subsidy for the agricultural base development project has to be covered all the project costs. In case of common facilities representing joint cost allocation problems, all the allocated casts for other purposes like transportation and M & I water supply etc. should be recovered for formation in investment fund for agricultural base development and to procure O & M costs for irrigation facilities.

  • PDF