• Title/Summary/Keyword: Random Cycle Time

Search Result 78, Processing Time 0.025 seconds

Bi-modal spectral method for evaluation of along-wind induced fatigue damage

  • Gomathinayagam, S.;Harikrishna, P.;Abraham, A.;Lakshmanan, N.
    • Wind and Structures
    • /
    • v.9 no.4
    • /
    • pp.255-270
    • /
    • 2006
  • Several analytical procedures available in literature, for the evaluation of wind induced fatigue damage of structures, either assume the wide band random stress variations as narrow band random process or use correction factors along with narrow band assumption. This paper compares the correction factors obtained using the Rainflow Cycle (RFC) counting of the measured stress time histories on a lamp mast and a lattice tower, with those evaluated using different frequency domain methods available in literature. A Bi-modal spectral method has been formulated by idealising the single spectral moment method into two modes of background and resonant components, as considered in the gust response factor, for the evaluation of fatigue of slender structures subjected to "along-wind vibrations". A closed form approximation for the effective frequency of the background component has been developed. The simplicity and the accuracy of the new method have been illustrated through a case study by simulating stress time histories at the base of an urban light pole for different mean wind speeds. The correction factors obtained by the Bi-modal spectral method have been compared with those obtained from the simulated stress time histories using RFC counting method. The developed Bi-modal method is observed to be a simple and easy to use alternative to detailed time and frequency domain fatigue analyses without considerable computational and experimental efforts.

Maximization in Reliability Design when Stress/Strength has Time Dependent Model of Deterministic Cycle Times

  • Oh, Chung-Hwan
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.1
    • /
    • pp.129-147
    • /
    • 1990
  • This study is to refer to the optimization problems when the stress and strength follow the time dependent model, considering a decision making process in the design methodology from reliability viewpoint. Reliability of a component can be expressed and computed if the probability distributions for the stress and strength in the time dependent case are known. The factors which determine the parameters of the distributions for stress and strength random variables can be controlled in design problems. This leads to the problem of finding the optimal values of these parameters subject to resources and design constraints. This paper is to present techniques for solving the optimization problems at the design stage like as minimizing the total cost to be spent on controlling the stress and strength parameters for random variables subject to the constraint that the component must have a specified reliability, alternatively, maximizing the component reliability subject to certain constraints on amount of resources available to control the parameters. The derived expressions and computations of reliability in the time dependent case and some optimization models of these cases are discussed. The special structure of these models is exploited to develop the optimization techniques which are illustrated by design examples.

  • PDF

PM Policy with Random Maintenance Quality Following the Expiration of Non-Renewing Warranty (비재생보증이 종료된 이후의 확률적 보전효과를 갖는 예방보전정책)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.1
    • /
    • pp.77-86
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policy following the expiration of non-renewing warranty. We assume that Wu and Clements-Croome's (2005) periodic PM model with random maintenance quality is utilized to maintain the system after the non-renewing warranty is expired. Given the cost structure to the user during the cycle of the product, we drive the expressions for the expected cost rate per unit time. Also, we obtain the optimal number and the optimal period by minimizing the expected cost rate per unit time. The numerical examples are presented for illustrative purpose.

Novel Self-Reference Sense Amplifier for Spin-Transfer-Torque Magneto-Resistive Random Access Memory

  • Choi, Jun-Tae;Kil, Gyu-Hyun;Kim, Kyu-Beom;Song, Yun-Heub
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.16 no.1
    • /
    • pp.31-38
    • /
    • 2016
  • A novel self-reference sense amplifier with parallel reading during writing operation is proposed. Read access time is improved compared to conventional self-reference scheme with fast operation speed by reducing operation steps to 1 for read operation cycle using parallel reading scheme, while large sense margin competitive to conventional destructive scheme is obtained by using self-reference scheme. The simulation was performed using standard $0.18{\mu}m$ CMOS process. The proposed self-reference sense amplifier improved not only the operation speed of less than 20 ns which is comparable to non-destructive sense amplifier, but also sense margin over 150 mV which is larger than conventional sensing schemes. The proposed scheme is expected to be very helpful for engineers for developing MRAM technology.

A Group Maintenance Model with Extended Operating Horizon (연장된 운용기간을 활용하는 그룹보전모형)

  • Yoo, Young-Kwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.3
    • /
    • pp.89-95
    • /
    • 2017
  • This paper presents another maintenance policy for a group of units under finite operating horizon. A group of identical units are subject to random failures. Group maintenances are performed to all units together at specified intervals, and the failed units during operation are remained idle until the next group maintenance set-up. Unlike the traditional assumption of infinite operating horizon, we adopt the assumption of the finite operating horizon which reflect the rapid industrial advance and short life cycle of modern times. The units are under operation until the end of the operating horizon. Further, the operation of units are extended to the first group maintenance time after the end of the horizon. The total cost under the proposed maintenance policy is derived. The optimal group maintenance interval and the expected number of group maintenances during the horizon are found. It is shown that the proposed policy is better than the classical group maintenance policy in terms of total cost over the operating horizon. Numerical examples are presented for illustrations.

A Prediction of Crack Propagation Rate under Random Loading (랜덤하중에서의 균열전파속도 추정법에 관한 연구)

  • 표동근;안태환
    • Journal of Ocean Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.115-123
    • /
    • 1994
  • Under variable amplitude loading conditions, retardation or accelerated condition of fatigue crack growth occurs with every cycle, Because fatigue crack growth behavior varied depend on load time history. The modeling of stress amplitude with storm loading acted to ships and offshore structures applied this paper. The crack closure behavior examine by recording the variation in load-strain relationship. By taking process mentioned above, fatigue crack growth rate, crack length, stress intensity factor, and crack closure stress intensity factor were obtained from the stress cycles of each type of storm ; A(6m), B(7m), C(8m), D(9m), E(11m) and F(15m) which was wave height. It showed that the good agreement with between the experiment results and simulation of storm loads. So this estimated method of crack propagtion rate gives a good criterion for the safe design of vessels and marine structure.

  • PDF

Power control of PTC heating element using variable AC Cycles (AC Cycles 가변을 이용한 PTC 발열체의 전력제어)

  • Gong, Jae-Woong;Lee, Young-Joo;Kim, Doo-Young
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.12 no.4
    • /
    • pp.355-361
    • /
    • 2011
  • The power control of the existing heating element has been using the On-Off control, phase control, and PWM control. In case of controlling power PTC heating element developed recently with the existing method, the temperature is unable to be precisely controlled or the harmful electromagnetic wave to human body is generated. In this paper, We suggest the power control of PTC heating cable using variable AC Cycles. This regards the AC cycle of N as the unit of the power control. It determines On-Off for each cycle. It is the AC power control method in which it arranges the on-cycle in N cycles in the random and it supplies the current continuously. At this time. the minimal electric power amount becomes 1/N. The maximum current amount becomes 1 and sets up the number of on cycles according to the set value and can control the electric power with the step of N consistently. In the PTC heating system, we show that proposed power control method is superior in the EMI and temperature control property using MATLAB simulation, experiments and measurements.

Application of Accelerated Vibration Testing to Spot-welding Specimen (점용접 표준시편에 대한 가속내구시험법의 적용)

  • 김관주;조성신;정진성
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.11 no.3
    • /
    • pp.209-213
    • /
    • 2003
  • It is advantage of accelerated vibration testing to compress service exposures to operating vibration into a reduced laboratory test by increasing the amplitude or frequency of the applied input excitations. This paper proposes an accelerated test method to estimate the high-cycle fatigue life under random excitation. The method consists of conducting a test with amplified input excitation and extrapolating linearly the lift in the accelerated condition into the real lift in field condition. The extrapolation is carried out applying the high-cycle irregular excitation fatigue theory including the rainflow counting, Miner’s damage accumulation rule, and Goodman’s mean stress correction. As a verification, those estimated lift is compared with that acquired by experiment f3r the simple case of spot welding specimen with good agreement. This testing procedure will provide an useful scheme that can reduce testing period associated with developing time schedule of new product.

CRISPR base editor-based targeted random mutagenesis (BE-TRM) toolbox for directed evolution

  • Rahul Mahadev Shelake;Dibyajyoti Pramanik;Jae-Yean Kim
    • BMB Reports
    • /
    • v.57 no.1
    • /
    • pp.30-39
    • /
    • 2024
  • Directed evolution (DE) of desired locus by targeted random mutagenesis (TRM) tools is a powerful approach for generating genetic variations with novel or improved functions, particularly in complex genomes. TRM-based DE involves developing a mutant library of targeted DNA sequences and screening the variants for the desired properties. However, DE methods have for a long time been confined to bacteria and yeasts. Lately, CRISPR/Cas and DNA deaminase-based tools that circumvent enduring barriers such as longer life cycle, small library sizes, and low mutation rates have been developed to facilitate DE in native genetic environments of multicellular organisms. Notably, deaminase-based base editing-TRM (BE-TRM) tools have greatly expanded the scope and efficiency of DE schemes by enabling base substitutions and randomization of targeted DNA sequences. BE-TRM tools provide a robust platform for the continuous molecular evolution of desired proteins, metabolic pathway engineering, creation of a mutant library of desired locus to evolve novel functions, and other applications, such as predicting mutants conferring antibiotic resistance. This review provides timely updates on the recent advances in BE-TRM tools for DE, their applications in biology, and future directions for further improvements.

Determination of the Starting Value and the Resetting Time for a Production Process with Linear Shift in the Process Mean (공정평균이 변하는 생산공정의 공정평균의 초기값 및 재설정 시간 결정)

  • 안동근;장중순
    • Journal of Korean Society for Quality Management
    • /
    • v.26 no.4
    • /
    • pp.51-64
    • /
    • 1998
  • Mean shifts may be found in tool wear in machining, drawing, stamping and moulding operations, which make the process quality level deteriorate over time. In such situations, it is necessary to reset or readjust the manufacturing process at regular time basis or by inspection to prevent defective items produced. Although the deterioration rate may be assumed to be linear in a production cycle, there are many cases where the rate varies after resetting due to the variation of tool characteristics or by using the resharpened tools. In such cases, the deterioration rate should not be assumed to be a deterministic constant but a random variable. This paper is to find an optimal resetting period and quality level for such production processes.

  • PDF