• Title/Summary/Keyword: Ramp rate

Search Result 129, Processing Time 0.037 seconds

The Ramp-Rate Constraint Effects on the Generators' Equilibrium Strategy in Electricity Markets

  • Joung, Man-Ho;Kim, Jin-Ho
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.4
    • /
    • pp.509-513
    • /
    • 2008
  • In this paper, we investigate how generators' ramp-rate constraints may influence their equilibrium strategy formulation. In the market model proposed in this study, the generators' ramp-rate constraints are explicitly represented. In order to fully characterize the inter-temporal nature of the ramp-rate constraints, a dynamic game model is presented. The subgame perfect Nash equilibrium is adopted as the solution of the game and the backward induction procedure for the solution of the game is designed in this paper. The inter-temporal nature of the ramp-rate constraints results in the Markov property of the game, and we have found that the Markov property of the game significantly simplifies the subgame perfect Nash equilibrium characterization. Finally, a simple electricity market numerical illustration is presented for the successful application of the approach proposed.

Analysis of ramp-rate limitation and current redistribution in two-strand superconducting cable (두 가닥 초전도 케이블에서 자속변화한계와 전류 재분배 해석)

  • 김석호;정상권
    • Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
    • /
    • 2003.10a
    • /
    • pp.45-48
    • /
    • 2003
  • Ramp-rate limitation is a serious obstacle for successful operation of fast charging and discharging magnet Ramp-rate limitation is hard to expect or fully investigate due to its electric and thermo-hydraulics couplings. In this paper, the simplest case of ramp-rate limitation is investigated with two-strand superconducting cable model considering transient heat transfer The simulation results are compared with the experimental results.

  • PDF

A Study on Discharge Characteristics of the PDP Packaged with In-situ Vacuum Sealing with the MgO Protective Layer Deposited by Optimal Evaporation Rate (최적 증착 속도로 형성된 MgO를 갖는 인-라인 진공 실장된 플라즈마 디스플레이 패널의 방전 특성에 관한 연구)

  • Li, Zhao-Hui;Cho, Eou-Sik;Kwon, Sang-Jik
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.21 no.10
    • /
    • pp.916-922
    • /
    • 2008
  • AC PDP with MgO protective layer coated with the optimum evaporation rate of $5{\AA}/s$ can generate more enhanced efficiency through the vacuum in-line sealing process. However, the optimized process conditions still require the optimum driving scheme on the ramp-up and ramp-down slope of the reset waveform for enhancing the efficiency. In this paper, for the in-situ vacuum sealed PDP with the optimum evaporation rate of MgO protective layer, the address delay time was investigated with various slopes of ramp waveform during a reset ramp-up and ramp-down period. In this study, the minimum statistical delay time was obtained at the ramp-up rate of $6.0 V/{\mu}s$ and the ramp-down rate of $0.7 V/{\mu}s$ of the reset waveform.

Multi-Stage Generation Allocation Game Considering Ramp-rate Constraints (경쟁적 전력시장에서 발전기 증감발률을 고려한 다중시간 발전량 배분 게임)

  • Park, Yong-Gi;Park, Jong-Bae;Roh, Jae-Hyung;Kim, Hyeong-Jung;Shin, Jung-Rin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.3
    • /
    • pp.509-516
    • /
    • 2011
  • This paper studies a novel method to find the profit-maximizing Nash Equilibriums in allocating generation quantities with consideration of ramp-rates under competitive market environment. Each GenCo in a market participates in a game to maximize its profit through competitions and play a game with bidding strategies. In order to find the Nash equilibriums it is necessary to search the feasible combinations of GenCos' strategies which satisfy every participant's profit and no one wants various constraints. During the procedure to find Nash equilibriums, the payoff matrix can be simplified as eliminating the dominated strategies. in each time interval. Because of the ramp-rate, generator's physically or technically limits to increase or decrease outputs in its range, it can restrict the number of bidding strategies of each generator at the next stage. So in this paper, we found the Nash Equilibriums for multi-stage generation allocation game considering the ramp-rate limits of generators. In the case studies, we analyzed the generation allocation game for a 12-hour multi-stage and compared it with the results of dynamic economic dispatch. Both of the two cases were considered generator's ramp-rate effects.

Development of Traffic Accident Rate Forecasting Models for Trumpet IC Exit Ramp of Freeway using Variables Transformation Method (변수변환 기법을 이용한 고속도로 트럼펫IC 유출연결로 교통사고율 예측모형 개발)

  • Yoon, Byoung-Jo
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.139-150
    • /
    • 2008
  • In this study, It is focused on development of the forecasting model about trumpet InterChange(IC) ramp accident because of the frequency of accident in ramp more than highway basic section and trend the increasing accident in ramp. The independent variables was selected through statistical analysis(correlation analysis, multi-collinearity etc) by ramp types(direct, semi-direct and loop). The independent variables and accident rate is non-linear relationship. So it made new variables by transformation of the independent variables. The forecasting models according to exit-ramp type (direct, semi-direct and loop) are built with statistical multi-variable regression using all possible regression method. And the forecasts of the models showed high accuracy statistically. It is expected that the developed models could be employed to design trumpet IC ramp more cost-efficiently and safely and to analyze the causes of traffic accidents happened on the IC ramp.

  • PDF

Ramp-rate limitation of CIC(Cable-In-Conduit) superconducting magnet (관내권선(Cable-In-Conduit, CIC) 초전도 자석(Superconducting magnet)에서의 한계 자속 변화(ramp-rate limitation) 현상)

  • Jeong, Sang-Kwon
    • Proceedings of the KIEE Conference
    • /
    • 1996.07a
    • /
    • pp.37-40
    • /
    • 1996
  • Cable-In-Conduit Conductor(CICC) is widely accepted as an advanced superconductor configuration for large scale applications such as tokamak fusion reactors, MAGLEV (MAGnetic LEVitation), and SMES (Superconducting Magnetic Energy Storage). The stability of CICC cooled with supercritical helium can be very high if it is operated below a certain limiting current. This limiting current can be determined by Stekly type heat balance equation. The stability characteristic of CICC for AC operation is more complicated than that of DC because there are additional instability sources which are associated with local flux change. Ramp-rate limitation is a phenomenon discovered during US-DPC (United States-Demonstration Poloidal Coil) program, which showed apparent quench current degradation associated with high dB/dt. This paper describes recent experimental investigation results on the ramp-rate limitation and discusses current imbalance, induced current, current redistribution due to local quench of the strand in the cable.

  • PDF

Incorporated Multi-State Nash Equilibriums For The Generation Allocation Considered Ramp Rate In the Competitive Power Market (경쟁적 전력시장에서 Ramp-rate를 고려한 발전량배분의 다중시간 통합 내쉬균형)

  • Park, Yong-Gi;Song, Hyoung-Yong;Lee, Joo-Won;Park, Jong-Bae;Shin, Joong-Rin
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.569_570
    • /
    • 2009
  • This paper presents a methodology to find the profit maximized Nash Equilibriums of each generator(or GenCo), which considers the Ramp-rate of each generator under a competitive market environment. The ramp-rate of a generator is one of the physical or technical constraints of a generator and means the ability to increase or decrease the output instantaneously. In this paper, we found several Nash Equilibriums of the generation allocation problem through Dynamic Programming in a competitive market. Individual generators participate in a game to maximize its profit through competitions and play a game with bidding strategies of its generation quantities in a spot market.

  • PDF

A Study on the Coordinated Traffic Responsive Ramp Metering Control considering Spatial Equity (공간적 형평성을 고려한 통합 감응 램프미터링 제어 연구 -고속도로 진입로 중심으로-)

  • Yoon, Jae Yong;Shin, Hyoung O;Lee, Eui Eun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.2
    • /
    • pp.361-367
    • /
    • 2019
  • Ramp metering is a traffic management technique that reduces the congestion of Expressway by controlling vehicles entering the highway. It is widely used outside the country, and Korea is also operating in seven sites (Seoul Ring Expressway). Ramp metering has the advantage of reducing congestion of Expressway, but there are disadvantages, as queuing occurs because vehicles are waiting for ramp, and the ramp queue affects adjacent roads at rush hour. To solve this problem, we improved the ramp metering algorithm to reduce the metering rate more spaces on ramp and to increase the metering rate less spaces. In order to evaluate this, the combined evaluation index was used and it was found that the result satisfied the equity and efficiency at the same time.

A Study on Welding of Dissimilar Materials for Van-Ramp Design and Production (승합차의 램프 디자인과 제작을 위한 이종재료의 접합)

  • Lee, Jung-Hyun;Kim, In-Cheol
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.20 no.4
    • /
    • pp.434-439
    • /
    • 2011
  • There are about 2.4million disabled in Korea, 2009. Also, Korean society entered into an aging society. Therefore disable and elderly are getting more involved in our society. This study proposes simple ramp design for wheel chair users and welding method and condition for manufacturing. In the middle of ramp, screw jack and motor are installed so that ramp can be moved left and right side. To make the ramp moves easily, ramp was fixed by installing LM guide on both sides. Ramp production for using Nd:YAG laser certain dissimilar welding in stainless steel sheet and cold reduced carbon steel. The output was fixed by 3kW, the speed was increased to 2~7m/min, Argon was used as shielding gas and the flow rate was changed to 10~30L/min. The proper welding condition is the output 3kW and welding speed 2~5m/min.

Assessment of performance for Output Power Control of Wind Turbine using Energy Storage System (에너지저장장치를 이용한 풍력발전 출력 제어 성능 평가)

  • Hong, Jong-Seok;Choi, Chang-Ho;Lee, Joo-Yeon;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.254-259
    • /
    • 2014
  • In this paper, we describe construction of a wind stabilization demo-site and effects of output power control of wind turbines for suppression of ramp rate using ESS (Energy Storage System). It is difficult to control the output power of distributed generator such as wind turbine which of variation is very large. If the large capacity wind farm be interconnected into power system may cause blackout due to Power Quality. For these reasons, the international standards such as Grid-Code is limited to less than 10 [%/min] of renewable energy ramp rate. The case of Korea, government actively conducts propagating large-scale renewable energy for green growth policy, to interconnecting more renewable energy into power system is necessary for stabilization technology. For these reasons, the POSCO consortium has constructed a wind stabilization demo-site that is configured as 500 [kWh] battery energy storage systems can output up to 3 [C-Rate] and two wind turbines rated 750 [kW]. In POSCO consortium, which implements various methods stabilizing output power of wind turbine such as smoothing, section firming and ramp control, we derive the results of long-term demonstration that can be controlled to satisfy to the international standard about ramp rate [%/kW] of wind turbine output power.