A Case Study on the Construction at Near Verge Section of Secure Objects Using Electronic Detonators (전자뇌관을 이용한 보안물건 초근접구간 시공 사례)

  • Hwang, Nam-Sun;Lee, Dong-Hee;Lim, Il-soo;Kim, Jin-soo
    • Explosives and Blasting
    • /
    • v.37 no.2
    • /
    • pp.22-30
    • /
    • 2019
  • On sites where explosives are used, the effects of noise and vibration produced by the blast wave are subject to a number of operational restrictions. Recently, the number of civil complaints has increased and the standard of environmental regulations on secure goods has been greatly tighten. Therefore, work is generally carried out by machine excavation in case of close proximity of safety thing. Machine excavation methods have the advantage as reducing noise and vibration compared to blasting methods, but depending on the conditions of rock intended to be excavated, they are sometimes less constructive than planned. In general, the closer a rock type is to hard rock, the less constructible it becomes. In this paper, we are going to explain the construction of a construction section with a close proximity to a safety thing using electronic detonators. While the project site was designed with a machine excavation methods due to the close(9.9m) proximity of safety thing(the railroad), construction using electronic detonators was reviewed as an alternative method for improving rate of advance time and construction efficiency when expose to hard rock. Through blasting using electronic detonators, construction and economic efficiency were maximized while minimizing impact on surrounding safety things. Because $HiTRONIC^{TM}$, which is produced by Hanwha, has innovative stability and high explosion reliability, it is able to explode with high-precision accuracy. Electronic detonators are widely used in construction sites of railway or highway, other urban burrowing areas and large limestone mines.

A Case Study on Construction of a Large-Scale Tunnel Blasting Using Electronic Detonator (전자뇌관을 이용한 대단면 터널 시공 사례)

  • Hwang, Nam-Sun;Lee, Dong-Hee;Jung, Min-Sung;Kim, Nam-Soo
    • Explosives and Blasting
    • /
    • v.36 no.2
    • /
    • pp.19-26
    • /
    • 2018
  • The measures for environmental regulations have become more strict over the recent years. Due to vibration and noise arising from blasting, every site that chooses to handle explosives has to be under certain restrictions in its use. Especially a site where a safety thing is situated within close proximity, the chosen method is through mechanical excavation. However, various applications of electronic detonators has made blasting possible where mechanical excavation used to be the only alternative. Hanwha Corporation has developed an electronic detonator, $HiTRONIC^{TM}$, which is an advanced fourth-generation detonator with a high accuracy of delay time(0.01%). At this moment, $HiTRONIC^{TM}$ is widely used in highway and railway construction sites, large limestone quarries, and many other blasting sites where blasting had not been an available option before. In this paper, I would like to introduce a case study on construction of utilizing $HiTRONIC^{TM}$ at a large-scale tunnel site.

Piezoelectric Energy Harvesting from Bridge Vibrations under Railway Loads (철도하중에 의한 교량 진동을 이용한 압전 에너지 수확)

  • Kwon, Soon-Duck;Lee, Hankyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4A
    • /
    • pp.287-293
    • /
    • 2011
  • This paper investigates the applicability of a piezoelectric cantilever for energy supply of wireless sensor node used in structural health monitoring of bridges. By combining the constitutive equation of piezoelectric material and the dynamic equation of cantilever structure, the coupled governing equation for cantilever equipped piezoelectric patches has been addressed in matrix form. Forced excitation tests were carried out to validate the numerical model and to investigate the power output characteristics of the energy harvester. From the numerical simulation based on the measured bridge accelerations under KTX, Saemaul, Mugunghwa trains, the peak powers generated from the device were found to be 28.5 mW, 0.65 mW, 0.51 mW respectively. It is revealed from the results that bridge vibrations caused by moving loads is not a practical source for energy harvesting because of its low acceleration level, low frequency and short duration.

A Case Study of Blasting with Electronic Detonator (전자뇌관을 활용한 발파 시공 사례)

  • Hwang, Nam-Sun;Lee, Dong-Hoon;Lee, Seung-Jae
    • Explosives and Blasting
    • /
    • v.34 no.4
    • /
    • pp.40-45
    • /
    • 2016
  • Sites, where explosives are used, are constantly under constraint of vibration and noise levels. If a sensitive area is located nearby the sites, mechanical excavation has been preferred rather than blasting. Recently, however, blasting using electronic detonators is applicable in the areas, where previously should be excavated by mechanical methods. $HiTRONIC^{TM}$ is a fourth-generation detonator that utilizes Hanwha Corporation's advanced electronic technology. The detonator contains IC-Chip, which allows delay times between 0~15,000ms with 1ms interval. Furthermore, the product can provide high accuracy(0.01%) for accurate-blasting. Electronic detonator is widely used in highway and railway construction sites, large limestone quarries, and other works. In this paper, several sites, in which HiTRONIC was used, are introduced in order to enhance understanding of electronic detonator.

NUMERICAL STUDY WITH VENT SHAFT POSITION IN UNDERGROUND STATION (대심도 지하정거장에서 수직구 위치에 따른 수치적 연구)

  • Oh, Hyun-Joo;Shin, Dea-Yong;Lee, Sang-Gun;Kim, Dong-Hyun;Kim, Charn-Jung
    • Journal of computational fluids engineering
    • /
    • v.17 no.1
    • /
    • pp.36-43
    • /
    • 2012
  • When a high-speed train passes an underground station, large pressure waves are generated due to the piston effect. These pressure waves can cause the problems of vibration and noise as well as the ear discomfort of passengers at the underground station. This work numerically analyzed the pressure wave generation and propagation in an high-speed railway underground station, and the optimal location for vent shafts was studied to improve the passenger comfort by reducing the magnitude of the pressure wave and its rate of change. The evolution of pressure field in the underground station was calculated using a CFD(Computational Fluid Dynamics) software(Fluent), where the axis-symmetric two-dimensional model verified by Wu was used. And this study is applied to modelling of the underground station and the tunnel from Daegok station A-line of GTX(Great Train Express). From the result, we can have a conclusion that the role of vent shafts respectively were different according to the position in and out the underground station. Also Vent shaft in the underground station widely reduced pressure magnitude. And vent shaft out underground station reduced initial pressure peak value. Double vent shafts installed at tunnel toward station entrance and inside of the tunnel are the most efficient to reduce pressure. and pressure reduction increases according to the number of vent shaft.

Prediction of Track Quality Index (TQI) Using Vehicle Acceleration Data based on Machine Learning (차량가속도데이터를 이용한 머신러닝 기반의 궤도품질지수(TQI) 예측)

  • Choi, Chanyong;Kim, Hunki;Kim, Young Cheul;Kim, Sang-su
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.1
    • /
    • pp.45-53
    • /
    • 2020
  • There is an increasing tendency to try to make predictive analysis using measurement data based on machine learning techniques in the railway industries. In this paper, it was predicted that Track quality index (TQI) using vehicle acceleration data based on the machine learning method. The XGB (XGBoost) was the most accurate with 85% in the all data sets. Unlike the SVM model with a single algorithm, the RF and XGB model with a ensemble system were considered to be good at the prediction performance. In the case of the Surface TQI, it is shown that the acceleration of the z axis is highly related to the vertical direction and is in good agreement with the previous studies. Therefore, it is appropriate to apply the model with the ensemble algorithm to predict the track quality index using the vehicle vibration acceleration data because the accuracy may vary depending on the applied model in the machine learning methods.

A Study on the Near Construction Range Considering the Factors Affecting the Stability of Water Tunnel (수로터널 안정성에 미치는 요소를 고려한 근접시공범위에 대한 연구)

  • Mingyu Lee;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.5
    • /
    • pp.5-12
    • /
    • 2023
  • Recently, due to urban development and expansion, construction plans have been increasing adjacent to existing tunnel structures such as subways, roads, and large pipelines. Structural plans adjacent to existing tunnels have different effects on tunnel stability depending on the construction method, degree of proximity, and location of new structures. In particular, the pressure water tunnel shows a very large difference from other road tunnels and railway tunnels in geotechnical characteristics and operation characteristics. Therefore, it is necessary to review the safety zone due to adjacent construction in consideration of the geotechnical characteristics of the water tunnel and the new sturure construction method. In this study, the existing tunnel safety zone standards were investigated. A stability evaluation performed numerical analysis considering the deterioration of concrete lining in operation and the characteristics of water tunnel. In addition, the impact of vibration caused by pile construction and blasting excavation of new structures was reviewed. Based on this, a pressure water tunnel safety zone was proposed in consideration of adjacent construction.

Design and Fabrication of an LPVT Embedded in a GIS Spacer (GIS 스페이서 내장형 저전력 측정용 변압기의 설계 및 제작)

  • Seung-Gwan Park;Gyeong-Yeol Lee;Nam-Hoon Kim;Cheol-Hwan Kim;Gyung-Suk Kil
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.37 no.2
    • /
    • pp.175-181
    • /
    • 2024
  • In electrical power substations, bulky iron-core potential transformers (PTs) are installed in a tank of gas-insulated switchgear (GIS) to measure system voltages. This paper proposed a low-power voltage transformer (LPVT) that can replace the conventional iron-core PTs in response to the demand for the digitalization of substations. The prototype LPVT consists of a capacitive voltage divider (CVD) which is embedded in a spacer and an impedance matching circuit using passive components. The CVD was fabricated with a flexible PCB to acquire enough insulation performance and withstand vibration and shock during operation. The performance of the LPVT was evaluated at 80%, 100%, and 120% of the rated voltage (38.1 kV) according to IEC 61869-11. An accuracy correction algorithm based on LabVIEW was applied to correct the voltage ratio and phase error. The corrected voltage ratio and phase error were +0.134% and +0.079 min., respectively, which satisfies the accuracy CL 0.2. In addition, the voltage ratio of LPVT was analyzed in ranges of -40~+40℃, and a temperature correction coefficient was applied to maintain the accuracy CL 0.2. By applying the LPVT proposed in this paper to the same rating GIS, it can be reduced the length per GIS bay by 11%, and the amount of SF6 by 5~7%.

A comparative study of field measurements of the pressure wave with analytical aerodynamic model for the high speed train in tunnels (고속철도 터널내 압력파 측정과 공기압 해석모델에 대한 기초연구)

  • Kim, Hyo-Gyu;Choi, Pan-Gyu;Hong, Yoo-Jung;Yoo, Ji-Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.319-332
    • /
    • 2015
  • The pressure wave formed by the piston effects of the train proceeds within the tunnel when a train enters the tunnel with a high speed. Depending on the condition of tunnel exit, the compression waves reflect at a open end, change to the expansion waves, transfer to tunnel entrance back. Due to interference in the pressure waves and running train, passengers experience severe pressure fluctuations. And these pressure waves result in energy loss, noise, vibration, as well as in the passengers' ears. In this study, we performed comparison between numerical analysis and field experiments about the characteristics of the pressure waves transport in tunnel that appears when the train enter a tunnel and the variation of pressure penetrating into the train staterooms according to blockage ratio of train. In addition, a comparative study was carried out with the ThermoTun program to examine the applicability of the compressible 1-D model(based on the Method of Characteristics). Furthermore examination for the adequacy of the governing equations analysis based on compressible 1-D numerical model by Baron was examined.

A study on design and performance test of fire door with high endurance performance in submarine tunnel (고내구성능을 갖는 해저터널 방화문 설계방안 및 성능시험 연구)

  • Park, Sang-Heon;Hwang, Ju-Hwan;Choi, Young-Hwan;An, Sung-Joo;Yoo, Yong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.331-346
    • /
    • 2018
  • In the tunnel of domestic high - speed railway, the main fire - fighting facility, fire - extinguishing passageway, is installed. However, due to the high pressure of the high - speed train, frequent breakage and maintenance are caused by strong shock and long - term vibration. In order to solve these problems, it is necessary to improve the fire door, but in Korea, it is installed by submitting a certificate by simple KS F 2296 performance test. At present, it is developed as a simple test certification by producing a real scale fireproof door without the theoretical examination in advance, so that a high cost for improvement is occurring in Korea. Therefore, through this study, structural analysis study which can preliminary structure review was carried out in order to design the refuge connection passage fire door and to improve the performance improvement. In order to secure the reliability of the result value, the official authentication test (KS F 2296) were compared.