• Title/Summary/Keyword: Railway track maintenance

검색결과 323건 처리시간 0.03초

일반철도 유지보수 합리화를 위한 궤도틀림 기준 연구방향 (A Study of Track Irregularity Standard for Rational Track Maintenance)

  • 김수정;이병혁;이두재;엄종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1624-1630
    • /
    • 2011
  • Currently the train operating environment to affect track irregularity is changed rapidly such as speed-up, linear improvement and rolling stack upgrade. The recent track maintenance criteria of track irregularity was quoted from past Japan's, and the needs of revision of criteria are increased because of the rapid change in train operating environment. In case of enhance the track irregularity criteria, it secure driving safety and riding comfort but maintenance cost are increase. And also decrease ballast durability by frequent corrective work. In case of mitigate the criteria, it decrease driving safety and riding comfort, but save the maintenance cost. The study for enacting rational criteria did not carry out so far. In this study, survey the domestic and international track irregularity and case study for track irregularity inspection results and maintenance history for guideline of enacting irregularity criteria study.

  • PDF

고속철도 슬래브궤도개발 (Development of HSR slab track)

  • 강윤석;노혁천;양신추;이진욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.303-310
    • /
    • 2000
  • In this study the basic direction of conceptual design of new HSR(High Speed Railway) slab track was determined in the viewpoint of running safety, economic efficiency and maintenance costs. Based on the research results, a detailed conceptual design of HRS slab track is suggested. For the systematic development of slab track, a comparative study is carried out, comparing merits and demerits of each slab type, and used in the design process of slab track. To compensate the demerits of high cost in slab track construction, a program for determination of efficient slab section is coded and applied.

  • PDF

고속선 궤도관리 의사결정지원 시스템 개발을 위한 성공요인 (Key Success Factor For Korea high speed Track Maintenance Decision Making Support System)

  • 김종경;이춘길;우병구;김남홍;이성욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.486-493
    • /
    • 2007
  • In the field of maintenance of domestic high-speed railroad which has cost a great deal more than any other fields since it was opened; 1) We found out the conditions of current domestic railroad by understanding the status of track maintenance and analyzing operative processes of track maintenance. 2) The main factors in track maintenance of high-speed railroad, that is, the elements for success to help decision-support in track maintenance were derived from a research on literature about the condition of railroad R&D in these days and about the prediction of the irregular progresses of track. 3) We derived the order of priority and weights from AHP analysis which was based on the survey regarding elements for success.

  • PDF

LCC분석을 통한 궤도도상구조의 적정 유지관리수준 선정에 관한 연구 (A Study on Proper Maintenance Level Selection of Track Ballast Structures Using LCC Analysis)

  • 안국;이호열;추장식;박미연;임종권
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.232-237
    • /
    • 2008
  • Several research institutes including KISTEC and KRRI etc., recently, have studied maintenance activities and performance, in order to determine proper maintenance level and maintenance cost of rail tracks. But it may extremely difficult to make a decision in maintenance matters of concrete track and ballast containing other sub-components. For these reasons, this study investigate variables related to current maintenance, essential maintenance, and preventive maintenance. It is intended to suggest estimation method of proper maintenance cost maximizing rail track performance. It is stated that proposed approach may be very useful to make a decision of proper maintenance level. Typical section of rail track is applied for calculation of life cycle cost according to each maintenance strategy. A proper profile for maintenance is determined minimum life cycle

  • PDF

고속영상처리에 의한 레일형상측정시스템 개발 (Development of Rail Profile Measurement System using High Speed Laser Image Processing)

  • 문철이;김만철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1320-1325
    • /
    • 2006
  • Railway track supports and guides train and it directly affects ride quality and safety. To maintain track quality, regular maintenance activity is essential but it degrades track usage since maintenance activity occupies the track during the work. To achieve maximum track efficiency, track inspection should be performed at commercial running speed. In this paper, we designed and developed high speed rail profile measurement system using laser light sectioning method with line laser generator, digital camera and DSP based image processing system. The measurement system can supports rail profile measurement at the speed of 300 Km/h that can be applied to KTX.

  • PDF

도시철도 궤도시스템별 틀림진전에 대한 분석 (An Analysis of the Track Irregularity Progress on the Various Track System in Urban Transit)

  • 고재현;김만철;이지하;조준곤;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.311-319
    • /
    • 2011
  • Track accompanies the process that track alignment by traffic loads is changed. A change of track alignment affects the running safety and riding comfort of train. This is called a track irregularity. The most important task in maintaining the track is to manage these track irregularity within quality parameters. Today, track maintenance of urban transit is enforcing immediate maintenance about section exceeding a safety standard by applying track recording data got through Integrated Measurement. This method is advantage of being easy of the maintenance assesment in case of the running safety, but is disadvantage of being difficult in case of the riding comfort of train. In this study, we propose track irregularity deviation of each track system depending on the time series and present about utilization plans of the Track Irregularity Progress Rate.

  • PDF

교량신축부에서의 궤도틀림 저감을 위한 활동체결구 및 침목결속 효과 (The Effect of the ZLR and Tied Sleeper to Reduce the Track Irregularity in the Bridge Expansion Joint Zone)

  • 강태구;민경주;임남형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2405-2408
    • /
    • 2011
  • In recent time, the cause analysis and the reduction of the track irregularity have become the most important issue in the ballasted track on the high-speed railway bridge. This is because that the frequency of the maintenance work at the bridge expansion joint zone is on the rise. The track irregularity on the railway bridge starts at the end of the bridge-deck and spreads along the bridge. Due to the dynamic vibration and the thermal expansion of the bridge, the compaction of the ballast gravel on the bridge expansion joint zone become loose and then the progress of the track irregularity result from the train-induced dynamic impact is accelerating further. Among the several options for reducing the track irregularity on the bridge expansion joint zone, the application and efficiency of the zero longitudinal restraint(ZLR) and tied sleeper are investigated in this paper. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction. Of the two methods, it is shown that the installation of the ZLR seems to be better than the tied sleeper.

  • PDF

궤도유지보수작업계획수립지원 시스템의 요구조건 (Requirement of Track Maintenance Plan Support System)

  • 이지하;황성호;박옥정
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.886-891
    • /
    • 2004
  • The process of determining whether, when, where and how to intervene, of deciding on optimum allocation of resources and minimizing the cost is a very complex problem: different track sections tend to behave differently under the effects of loading; decision-making processes for maintenance work are closely interrelated technically and economically; decision-making for maintenance plans is based on a large quantity of technical and economic information, extensive knowledge and above all experience. For that reason, It is considered very important to develope objective and computer-aided decision-making support system for track maintenance plan. On this paper, we made a survey of the state-of-art of decision-making support systems for track maintenance which were developed and used abroad and reviewed requirements of system and present the plan of develope decision-making support system for track maintenance appropriate to local condition.

  • PDF

도상이 장대 레일의 선형 온도 좌굴에 미치는 영향 (Effect of Track Resistance on Linear Thermal Buckling Characteristics of CWR)

  • 강영종;임남형;신정렬;양재성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1998년도 창립기념 춘계학술대회 논문집
    • /
    • pp.580-587
    • /
    • 1998
  • For many decades, the railway was constructed using tracks with jointed rails of relatively short lengths in accordance with rolling and handling technology. The joints cause many drawbacks in the track and lead to significant maintenance cost. So, railroad engineers became interested in eliminating joints to increase service loads and speeds by improving rolling, welding, and fastening technology, Continuous welded rail(CWR) track has many advantages over the conventional jointed-rail track. But in the case of the elimination of rail joints, it may cause the track to be suddenly buckled laterally by thermal and vehicle loads. Thermal loads are caused by an increase in the temperature of railway track. In this paper, CWR track model and CWRB program are developed for linear buckling analysis using finite element method(FEM). The finite element discretization is used with a total of 14 degrees of freedom for each rail element. The stiffness of the fastener, tie, and ballast bed are included by a set of spring elements. The investigation on the buckling modes and temperature of CWR track is presented in the paper.

  • PDF

급곡선용 레일탄성체결장치를 사용한 생력화궤도 시공 사례 (Construction Case of Maintenance-free Track System in Application of Elastic Rail Fastening System for Sharp Curved Section)

  • 공선용;김상진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.382-388
    • /
    • 2005
  • SMSC(Seoul Metropolitan Subway Corporation) is substantially taking the core role of mass transit system in Seoul Metropolitan area. When it was built, the design had challenged to sharp curved tracks less than 250m radius considering the protection of buildings and cultural properties as well as the connection to ground roads. Such circumstances have required a certain extent of slack in track geometry and therefore led to the construction of ballasted track with wooden sleepers. However, the dynamic force from running on sharp curved track has caused the misalignment and abnormal failure of track geometry, and it has resulted in a frequent maintenance and repair works which require a lot of cost and manpower. In this paper, we present the construction case of maintenance-free track system by using of concrete sleeper and elastic rail fastening system to ensure the safety of both passengers and trains, and to contribute the effective maintenance for track facilities of SMSC.

  • PDF