• Title/Summary/Keyword: Railway track maintenance

Search Result 323, Processing Time 0.042 seconds

A Characteristic Behavior of the Roadbeds of Slab Track with the Cyclic Loading (반복하중재하시의 슬래브궤도 노반의 거동특성)

  • 이성혁;이진욱;최찬용;황선근
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.381-386
    • /
    • 2001
  • In many countries the slab track of railroads is mostly applied on the railroad bridges and tunnels, however it hasn't been constructed in the tunnel in Korea. Presently the Korea high speed railway construction authority is planning to construct slab track in the tunnels to minimize the cost of maintenance and repair. In this study, dynamic characteristics of the railroad roadbed which was constructed using crushed stones obtained from tunnel construction was investigated through the field investigation, real scale model test and numerical analysis. As a conclusion, the roadbeds built with the crushed stones produced at the tunneling site satisfy the requirement of roadbed in terms of displacement and earth pressure for the slab track in tile tunnel.

  • PDF

Using the Turnout Reinforced Concrete Sleeper on Slab Track (콘크리트 도상 분기 침목의 R.C 침목화)

  • 이상진;김기훈;신순호;이인세
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.633-641
    • /
    • 2002
  • Wooden-sleeper, which has been adopted as railway turnout in Korea, has created many problems such as short life span and increase of maintenance cost. Especially turnout on Maintenance Free slab track, which has been used in city metro, has been constructed with wooden sleeper buried in concrete roadbed due to complexity of structure. However, such problem as rapid erosion in subground makes it difficult to maintain the sleeper because of frequent replacement required. Therefore, the objective of this paper is to introduce design and construction of reinforced concrete(R.C) sleeper for turnout on the concrete roadbed to facilitate maintainability and economic construction of turnout.

  • PDF

Measurement and analysis of support stiffness of the track which rubber ballast-mat installed (방진자갈매트구간 궤도지지계수 측정 및 분석)

  • Yang, Shin-Chu;Lee, Jee-Ha;Kim, Eun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1071-1076
    • /
    • 2007
  • In high-speed line, at some part of the track which rubber ballast-mat installed, track irregularity grew rapidly and affected riding comfort and train running stability. It is urgently requested to establish counter-measures which can be applied to track under operation. To do this, it is very important to analysis the origin of that phenomenon before. Track support stiffness is an essential factor for evaluating track condition. Sudden changes of support stiffness along track occur instability of train and bad riding comfort. Preventing sudden changes of track support stiffness is a key technique in high-speed track maintenance. Besides the sudden changes, the magnitude itself also significantly affects track and train. Low stiffness of ballast-mat makes ballast acceleration area wider. And it may accelerate track irregularity growth. So, the stiffness should be limited. To calculate track stiffness, measuring load and displacement on track is needed. In this study, the behavior of the track which rubber ballast-mat installed was measured and analyzed to understand the origin of rapid growth of it.

  • PDF

Construction and Evaluation of the Paved Track on Test Line (도시철도 시험선 구간에서의 포장궤도 시험부설 및 성능평가)

  • Lee, Il-Wha;Shim, Jae-Gyu;Lee, Choon-Ho;Park, Kyun-Seo;Ryu, Kyoung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1115-1120
    • /
    • 2007
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. In this study, the CMP track is constructed(30m) on a test line and the track performance tested by running train to evaluation the capability and workability. The track performance are tested to confirm the vibration acceleration of the car body, wheel and track, accumulated settlement, track irregularity and crack of surface.

  • PDF

An Experimental Study of Diminution of Ballast Track Bridges Vibration due to the Variation of Ballast Depth (도상두께 변화에 따른 유도상교량 궤도 진동저감의 실험적 연구)

  • Kwon, Soon-Jung;Lee, Sang-Bae;Hong, Cheng-Hi
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1222-1229
    • /
    • 2011
  • Railway bridges are divided into ballastless and ballast track bridges. The ballast abrasion occurs on the ballast track upon bridges more than soil roadbed because the track vibration occurs a lot in the ballast track upon bridges due to girder vibration when a train's weight is loaded onto track even though the identical ballast is used. The phenomena of mud pumping especially, which occurs when drainage is not properly secured for heavy rain, leads to the increase of maintenance work load and the decline of ride comfort. There are countermeasures such as ballast change, installation of cross-drainage for poor drainage, gutter establishment, ballast lifting methods, ballast mats and resilient sleepers laying for the mud pumping. The ballast thickness range in domestic railroad construction rule is uniformly set up according to the design speed of railroad and passing tonnage of train without considering field conditions which is considered in foreign railroad companies. The purpose of this study is to verify the effect of vibration decrease by measuring the acceleration, displacement and ride comfort of ballast track with the change of ballast thickness on the ballast track bridges and to suggest the optimal height of ballast on the Yocheon Bridge built for the test in Honam Line.

  • PDF

Settlement of Embankment and Foundation for Concrete Track of Gyungbu High Speed Railroad (경부고속철도 콘크리트궤도 토공 및 원지반 침하 (I))

  • Yang, Shin-Chu;Moon, Jae-Suk;Lee, Hyun-Jung;Kang, Dae-Woong;Kim, Dae-Sang
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.6 s.37
    • /
    • pp.644-651
    • /
    • 2006
  • An application of concrete track is being actively processed for the construction of Korean railroad. The concrete track has an advantage to decrease the maintenance ire, but is very difficult system to maintain after earthwork settlement occurred. Therefore, the management and control of embankment and foundation settlement is very important for the successful concrete track construction. We expect that the main part of the settlement of the concrete track is the one of embankment and foundation supporting it. Settlements vulnerable to the concrete track among the causes of lots of settlements are primary consolidation and secondary compression settlement of foundation, creep settlement of embankment, settlement caused by train load, and unequal settlement resulting from the difference of embankment material and construction process. This paper investigated the settlement causes to make badly effects on the concrete track and also evaluated the settlement with field tests and numerical analysis.

A study of CWR on railway viaduct with sharp curves (철도고가교 급곡선부 레일장대화 방안연구)

  • 이상진;김기훈;신순호;이주헌
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.415-422
    • /
    • 2000
  • The Seoul Subway Line 4 crossing downtown diagonally constructed in February 1980 and opened on October 11, 1983. The line 4 is thus able to link southern and northern parts of Seoul with the downtown as well as with the Seoul outskirts. More than 810,000 people use it everyday. Line 4 was constructed like Line 1,2,3 with ballast track system causing much maintenance cost gradually and espicially much public discontent due to wheel and rail contact noise by railway viaduct with sharp curves. CWR on railway viaduct with sharp curves, 180m$\leq$R$\leq$300m, hasn't been designed and constructed ever in domestic. Therefore in order to reduce noise and vibration caused by interaction between wheel and rail the possibility and the methods of CWR(Continuous Welded Rail) on railway viaduct with sharp curve less than R300 will lead it to the maintenance free system.

  • PDF

A Comparative Study between the Deterministic and Probabilistic Approach Analysis on Buckling Stability of CWR Tracks (CWR 궤도의 좌굴 안정성에 대한 결정론적 해석과 확률론적 해석 비교)

  • Bae, Hyun-Ung;Choi, Jin-Yu;Shin, Jeong-Sang;Kim, Jong-Jung;Lim, Nam-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.988-992
    • /
    • 2011
  • The buckling characteristics of the continuous welded rail track(CWR) is uncertainly varied by many influence factors, such as rail temperature, operating conditions of a train and maintenance of the track etc. Therefore, applying the probabilistic approach method is essential to rationally consider uncertainty and randomness of the various parameters that affect the track buckling. In this study, the probabilistic approach analysis was carried out and the results were compared with the deterministic approach using the buckling probability evaluation system of CWR tracks developed by our research team. From the comparison, it was identified that a probabilistic approach can quantitatively assess the reliability of the CWR tracks based on failure probability and can be used as a tool for decision making in track design, maintenance and operating etc.

  • PDF

Introduction of Track Quality Index(TQI) Methods using Track Induction Data (궤도검측데이터를 활용한 궤도품질지수 산출 방법론 고찰)

  • Kim, Nam-Hong;Lee, Syeung-Yeol;Won, Yong-Hoan;Kim, Kwan-Hyung;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.66-72
    • /
    • 2009
  • In order to forecast the progress of the track irregularity, we should observe the long-term track quality and divide a track into some separated divisions which have homogeneous property. For this, we define the division of track which has homogeneous property as a 'Segment' and manage the 'TQI(Track Quality Index)' using track induction data based on each segment. In this study, we introduce some methods of estimating track quality and figure out the TQIs of sample section using new FRA TQI method. In addition, we conducted a basic study of the forecasting model for the progress of track irregularity by analyzing track maintenance data.

  • PDF

Study on the Establishment of Rail Grinding Criteria of High-Speed Railway Lines Considering the KTX Operation Circumstances (KTX 운행현황을 고려한 고속선 레일 연마 기준 정립에 대한 연구)

  • Kim, Man-Cheol;Kang, Tae-Ku
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.377-385
    • /
    • 2007
  • The importance of maintenance of rail surface defects is increasing more according to the KTX operation. That is because during high speed operation of rolling stock, rail surface defects may cause shortened fatigue life of rail, acceleration of track degradation and reduced ride comfort. The paper was intended to study the establishment of rail grinding criteria of high-speed railway lines considering the KTX operation circumstances. For this, the specimens of UIC 60 rail on Kyeong-Bu high-speed operation lines were collected and they were analyzed for metallographic structure and tested for the hardness. By analyzing the test results to the factors affecting the RCF causing the defects of rail surface, the study suggested the rail grinding criteria of the domestic high speed railway lines. As the factors affecting RCF, passing tonnage, running speed and track condition are considered.

  • PDF