The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.11
/
pp.1526-1532
/
2014
The Electronic Interlocking unit in railway signalling system is safety-related facilities to determine route and speed for train running. In particular, the SSI(Solid State Interlocking) is Electronic Interlocking unit for high-speed railway, and it performs safety-critical function by MPM(Micro-Processor Module). Meanwhile, MPM is composed of the PES(Programmable Electronic System)-based system, and the PES-based system in railway safety-related facilities should be implemented by complying with the safety requirements defined in IEC 62425 and IEC 61508. In this paper, we performed modeling of failure rate and reliability for MPM implemented by fault tolerance methods and analyzed functional safety for MPM. Moreover, we determined SIL(Safety Integrity Level) for MPM according to the safety requirements defined in IEC 61508 based on an analyzed functional safety.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.55
no.12
/
pp.661-666
/
2006
Interlocking signalling system plays key role as core system to manage railway operation. The core role of railway operation is to control routing, displaying signal and regulation for train. Interlocking system relate tightly to railway accident because collision and derailment is sometime taken place wrong route setting and signal displaying. Safety activity for interlocking system is inevitable to avoid the accident over its life cycle. The safety activity includes hazard identification and analysis, safety requirement allocation, safety plan, safety activity and ao on. The safety activity need a broad wide range work. In this paper, we concentrate on hazard identification for generic interlocking system and programmable electronic interlocking system and compare between two results. The hazards will be used for safety activity.
Recently, a large amount of budget was invested in improving the railway tracks(double tracking, route improvement) of Janghang and Jungang line. However, further action to enhance the investment effect has been needed because the desired effect have not been obtained. This study was designed to evaluate the effect of track improvement briefly by examining the project summary of Janghang and Jungang line railway line improvement and analysing the change of the transport performance and revenue. The results of this study can be applied not only to establish an operation plan for maximizing the revenue of rail operation also to enhance an effect of track improvement.
In this paper will be presented an algorithm for designing of a railway interlocking table which is a document describing the functional specification of the interlocking device. The ability to produce an interlocking table has been handed down in the signalling engineers society. And the signalling engineer makes the most of his expertise to produce an interlocking table. But, the expertise has not yet been organized into technical system, the core of the expertise is a hard nut to crack. Therefore, we analyze into signal engineering expertise, and propose a generalization of interlocking notion. Also, an algorithm is drawn up based on a train route setting principle to solve practical and general problems by computer And the performance of the algorithm is evaluated for test program based on AutoCAD technology. The evaluation result shows that it can be utilized as the effective algorithm for computer control of the signalling system as interlocking device, that it improved in safety
That Russia is potentially great transport power becomes obvious if look to map of any route. The geographical position of the Russian Federation unequivocally specifies intended by nature the role of geobridge between the countries of Asia-Pacific Region and Europe. However, in construction engineering practice and feasibility study the construction of difficult and strategically important bridges is generally joins in wider concept of bridge crossing. The last includes not only actually the bridge(through the river, gulf, etc.), but also approaches to it, which construction in view of features of a relief and a configuration of new transport communications which have already developed and subject to construction not less difficult technically and not only economically expended, than building of the basic artificial construction.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.12
/
pp.645-652
/
2018
Recently, as South Korea has joined the OSJD, the rules of the OSJD need to be applied to South Korea. Therefore, the railways are connected to the continent railway in terms of software, but the railway systems in neighboring countries have been developed and operated for a long time, and are quite different with some restrictions in terms of hardware. Therefore, this study analyzed the current railway systems of neighboring countries' based on the TSI used in Europe for technical interoperability. A real operation with the operation models within the specific route was assumed and vector functions for the Infrastructure vector & Rolling stock vector were produced. The IOP value was calculated by working out the interfacing matrix value between the infrastructure vector and rolling stock vector. As a result of calculating the IOP in a specific route, which is from Busan South Korea to Vladivostok with the diesel locomotive hauling freight cars, the value was only 22%, which is fairly low in terms of the interoperability. In other words, there are 77.8% restricting items preventing their interoperability. Such restricted causes should be improved to increase the technical interoperability in the long term. Moreover, and when railway systems are constructed and manufactured, it is important to keep IOP 100% to increase the operating efficiency in continental railways.
KSCE Journal of Civil and Environmental Engineering Research
/
v.39
no.6
/
pp.853-858
/
2019
One of the methods which can enhance the efficiency of railroad network is construction of interconnection branch line for several route to share one railway. In Korea, this method already has been implemented or excuted as project level. This study suggests a network design model and a solution algorithm to choice most proper site to construction it and determine the priority of branch lines which can be considered in planning level, not project level. The model is a non-linear optimization program which minimize total cost-construction cost, operating cost and passengers' travel cost. The decision variables are a binary variable to explain whether construction or not and its direction and a integer variable of the frequencies of travel routes. The solution algorithm-problem solution and route choice and also the result of implementation for example network are suggested. This result can be more advanced after application in real network and calibration of parameters.
The purpose of this paper is to propose a new transit assignment model for intercity rail networks. The characteristics of intercity rail are different from that of public transit in urban area. Line selection probability on route section is introduced to include the characteristics of intercity rail into transit assignment model. Network expansion is more simplified by a assumption line selection probability is externally given. The generalized cost is used to decide the volume of each transit line in most of existing transit assignment models. But, many variables have influence on the volume of each line such as time schedule of transit lines, inter-station distance, passengers' income, seasonal variation of demand and regional characteristics. The influence of these variables can be considered to decide the volume of each line by introducing line selection probability on route section. The tests on a small scale network show that the model proposed in this paper is superior to existing models for predicting intercity rail demand. Proposed model is suitable to consider the complicated fare structure of intercity rail and to draw inter-station demand directly as a result of assignment procedure.
Long-term national railway building comprehensive review of the proposal had 100 in railway history, railway rail network plan. Planning routes for establishing a plan, but, considering the rail network, the plan was that could with the very important meaning in the What more economical route considering the costs and benefits of building a rail network under budget constraints, went through the process of background lines of business unit interval expenses to adopt a business unit interval. Especially in building the railway network, as well as the road plan was to reflect in order to build for the future railway facilities was secured examine the possibility of possible budget commitment. Budget of securing the transportation tax, gasoline tax, and other transportation facilities in order to secure and commit the current funding approach and Review Bodu possible budget scenarios based on it written. Was also enforce rail system built in reviewing the demand more than anything that can take advantage of the railway distance by railway and the merits of the competition means to compete in the form of the assumed situation. The rail network deployment plan, considering this was discussed, based on the results of the plan to establish the first annual or period of the plan change was based on the budget that was unknown.
Journal of Korean Tunnelling and Underground Space Association
/
v.7
no.3
/
pp.239-247
/
2005
A new railway line of about 17km length was planned between Dongbaeksan and the neighboring town Dokye to improve the existing decrepit railway system. New line about 17km of the distance will almost be in circular alignment tunnels owing to the difference of elevation about 380m. Since the geology of the area is rather unusual compared to the normal in South Korea, extensive geological investigations have been carried out to prepare geological maps and profiles along the planned tunnel routes. The tunnel will almost be in sedimentary rock formations, such as limestone, sandstone, shale, coal etc and be near abandoned mines Various rock formations have the complicated, alter ed those rocks, but are well developed with laminated formations. Each rock formations have been classified using the Q-system and the cost of tunnel excavation, support has been estimated and compared for three alternative routes in the design stage. Based on these estimates, the final route of t he railway line was chosen.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.