• Title/Summary/Keyword: Railway bridges

Search Result 499, Processing Time 0.027 seconds

Field Test to Investigate Dynamic Characteristics of Steel Plate Girder Railway Bridges without Ballast (무도상 판형교의 동적거동특성 분석을 위한 실험적 연구)

  • 최진유;오지택;김현민;이상배
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.678-683
    • /
    • 2002
  • Field measurements were conducted to analysis dynamic characteristics of existing steel plate girder railway bridges without ballast. Three bridges which have 9m, 12m, 18m span length in Kyoung-Bu and Ho-Nam Line were selected for test. According to the each bridge, dynamic vertical deflections and vertical and horizontal accelerations were measured. Natural frequencies, vertical deflections and accelerations obtained from field tests were compared with the limit value specified in the UC, Japanese and Korean railway bridge specification.

  • PDF

Development of an Analytical Track-Bridge Model for Safety Assessment of Railway Bridge on Service Line (공용중인 철도교량의 안전성 평가를 위한 궤도-교량 해석모델 개발)

  • Eom, Mac;Kang, Duck-Man;Choi, Jung-Youl;Kim, Man-Cheol;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1077-1092
    • /
    • 2007
  • The structural analysis model for estimate of load carrying capacity of railway bridge on service line is important to determine safety of bridges in service, we need to take response of bridge exactly, applying analysis model similar to the real railway bridge most. Track structure which is to distribute loads and decrease vibrations occurred from running train is constructed on the railway bridges. And it is important factor which should be considered to understand exact dynamic and static responses of bridge. But track structure is currently classified as a none structural members in the structural analysis model for estimating load carrying capacity of railway bridge and not considered in analysis model. That's the reason it is difficult to understand exact behavior of bridges. Therefore, the major objective of this study is to develop an analytical track-bridge model which is similar to real railway bridges considering track structure for safety assessment of railway bridge on service line to be effectively done.

  • PDF

A Study on Cable Anchor System in Cable-Stayed Railway Bridge (철도용 사장교의 케이블 정착구조에 관한 연구)

  • Kong, Byung-Seung
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1229-1234
    • /
    • 2005
  • Since the 20th century, the business of railway was invaded by the invention of airplanes and vehicles in the field of the transportation of passenger and commercial products, however, in the 21st century, the fervent development of a high speed railway made possible the huge capacity of transporting passengers and commercial freight, so the railway industry is facing a new era of railway revolution. The 200 years old railway tradition includes the history of railway bridges built in areas of river, valley and metropolitan region and in that, the number of constructions of railway bridges that is composed of cable-stayed bridges is increasing as one of the most optimal bridges considering the quality of materials and the span of continuous-welded long rail. Thanks to the minimized effects of the fixed load on the stiffening girder section by delivering the fixed load which is applied to the pylon with the composition of elastic supporting points by using cables and the effective structural system that can throughly resist extra loads in addition to fixed load, the long-extended span of a bridge becomes possible. In this structural system, the load that is applied to the stiffening girder section forms a now pattern and in the process of these load delivery, there will be a necessity to examine the concentration of stress occurred in the cable-anchor system of the cable.

  • PDF

A Study on Stress Analysis of Cable Anchor System in Cable-Stayed Railway Bridge (철도용 사장교의 케이블 정착구조에 관한 형식별 FEM해석 연구)

  • Park, Ji-Ho;Kong, Byung-Seung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.552-557
    • /
    • 2006
  • Since the 20th century, the business of railway was invaded by the invention of airplanes and vehicles in the field of the transportation of passenger and commercial products, however, in the 21st century, the fervent development of a high-speed railway made possible the huge capacity of transporting passengers and commercial freight, so the railway industry is facing a new era of railway revolution. The 200 years old railway tradition includes the history of railway bridges built in areas of river, valley and metropolitan region and in that, the number of constructions of railway bridges that is composed of cable-stayed bridges is increasing as one of the most optimal bridges considering the quality of materials and the span of continuous-welded long rail. Thanks to the minimized effects of the fixed load on the stiffening girder section by delivering the fixed load which is applied to the pylon with the composition of elastic supporting-points by using cables and the effective structural system that can throughly resist extra loads in addition to fixed load, the long-extended span of a bridge becomes possible. In this structural system, the load that is applied to the stiffening girder section forms a flow pattern and in the process of these load delivery, there will be a necessity to examine the concentration of stress occurred in the cable-anchor system of the cable.

  • PDF

Calibration of Health Monitoring System installed in the Railway Bridges (철도교 상시계측시스템의 교정 및 교정상수 설정에 관한 연구)

  • 박준오;이준석;최일윤;민경주
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.3
    • /
    • pp.148-157
    • /
    • 2002
  • A health monitoring system becomes a useful tool to obtain information on long term behavior of the important railway structures such as very long span and special type bridges. The health monitoring system not only gives the direct measurement data of the railway bridges but also provides the basic data on the maintenance of the structures. Therefore, periodic calibrations of the health monitoring system will be a necessary step toward precise and accurate assessment of the railway bridges. In this study, the calibration and gauge factor readjustment process made for the health monitoring system installed in the railroad bridges is reviewed and some findings are explained in detail: specifically, the calibrators made for this purpose are illustrated and the regression processes of the calibration on long-term displacement using water level sensor, longitudinal displacement using LVDT sensor, instantaneous displacement using LVDT sensors and accelerometer are described in full length. Based on the regression results, it was found that the gauge factors need to be readjusted according to the regression equation but, since the deviation or shift is not serious so far, long-term observation on each sensor is also recommended. Future work will be concentrated on the long-term analysis of each sensor and on the database creation so that the assessment of the structures is possible.

Precast Full Span Construction of Continuous PSC Box Girder Bridge for High Speed Railway (고속철도 PSC 박스거더 연속고의 프리캐스트 경간 일괄 가설)

  • Park Jeong Wha;Kim Kwang Soo;Sim Chungwook;Yoon Chul-Soo
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1168-1173
    • /
    • 2004
  • Bridges and tunnels mainly compose the structural system of Kyung-bu high-speed railway in Korea and the prestressed concrete box girder bridges are applied for the most part of bridge structures. Precast full span construction method was practiced in the construction of many prestressed concrete box girder bridges in Kyung-bu high speed railway for the high quality, great construction speed, low construction cost and construction safety. However, there have been no application of this method in continuous bridges until now. Therefore, a new advanced precast full span construction method is developed using pre-tensioning for precast and post-tensioning in alternating the simple span into a continuous bridge system. since the high-speed railway trains can cause dynamic problems in a continuous bridge. This study shows the structural behavior and the construction process of the new advance method.

  • PDF

A study of the rail and bridge stability according to rail conditions on the bridge (교량상 레일 조건에 따른 레일 및 교량의 안전성 연구)

  • Min, Kyung-Ju;Kim, Young-Kook;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.505-515
    • /
    • 2009
  • In railway bridges, various loads including train load, transverse load and braking force are applied to continuous CWR or semi-continuous longer rail located on non-continuous bridge superstructures. The rail-girder interaction due to thermal expansion is also very complex in railway bridges because the thermal characteristics for each of the rails and girder are quite different. Recently, the bridge retrofits for seismic loads were performed on bridges not designed for these loads. These retrofits may however have limitations with respect to rail-girder interactions because, in general these retrofits address issues related only to seismic loads. In this study of seismic evaluations for railway bridges, the load effects on the bridge rails from the road beds through the continuous rails shall be considered. Practical methods will be proposed which will increase the railway stability. For this, rail-girder interaction analyses due to train loads, temperature changes and seismic loads were performed and the results reviewed from a practical point of view.

  • PDF

Construction of Continuous Bridges in Hi8h-Speed Railway using Precast Span Method (프리캐스트 스팬 공법을 적용한 고속철도 연속교 시공)

  • 김성일;김성호;이원표;윤철수
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.401-407
    • /
    • 2001
  • Out of 412km long Kyung-bu high-speed railway, 302km was designed in tile form of either bridges or tunnels. Most of bridges were designed to be prestressed concrete box girder type. The precast span method was selected because of good quality of bridge section secured by factory manufacturing, fast construction speed, low construction cost with mechanized construction and the safety fur field workers. The precast span method has been mainly utilized in bridges consisted of repeated simple spans. However, we applied the precast span method to continuous bridge for high-speed railway Since it was the first attempt to apply ate precast span method to a continuous bridge for high-speed railway, many design and construction details were studied and implemented in the construction. Design and construction processes of a continuous bridge construction using tile precast span mettled are briefly described in this paper.

  • PDF

Evaluation of Comfort Limit on High Speed Railway Bridge Vibration Considering Passenger's Comfort (승차감을 고려한 고속철도 교량 진동사용성 평가)

  • Chin, Won-Jong;Kwark, Jong-Won;Choi, Eun-Suk;Kang, Jae-Yoon;Kim, Sung-Tae;Yoon, Hye-Jin;Kim, Nam-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.829-835
    • /
    • 2011
  • This paper aims for proposed the deflection limit on vibration serviceability of high-speed railway bridges considering passenger's comfort when a train passes a railway bridge. The vertical acceleration signals of passenger cars obtained from test were compared with them from the bridge-train transfer function by riding KTX. The deflections by KTX of seven high speed railway bridges were assumed as sine and haversine wave. The deflection limit on vibration serviceability of high-speed railway bridges considering passenger's comfort when a train passes a railway bridge duration can be expanded using bridge-train transfer function and bridge comfort limit considering serviceability due to bridge vibration. And it was compared to other allowable deflection limits of railway bridge design specifications.

  • PDF

Corrosion Fatigue Reliability-Based Life Cycle Cost Analysis of High-Speed Railway Steel Bridges (고속철도 강교량의 부식 피로신뢰성 기반 생애주기비용 분석)

  • Cho, Hyo-Nam;Jeon, Hong-Min;Sun, Jong-Wan;Youn, Man-Keun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.1
    • /
    • pp.107-113
    • /
    • 2008
  • As it recently appears that LCC (Life Cycle Cost) analysis may be considered as an essential method for economic evaluation of infrastructures. Many researches have been made to assess LCC of each facility based on reasonable methods. However, expected maintenance repair cost must be reasonably estimated to enhance the reliability of LCC analysis through systematic and rational methods. This study is intended to propose a rational approach to reliability-based LCC analysis of high-speed railway steel bridges considering lifetime corrosion and fatigue damage. However in Korea, since high speed railway steel bridges are only recently constructed, no direct statistical data are available for the account of the maintenance cost and thus their maintenance characteristics are not clear yet. In this paper, for the assessment of expected maintenance/repair cost, the fatigue system reliability analysis incorporating the corrosion effect is proposed by considering the corrosion and fatigue damage using measured data of high speed railway steel bridges. A model proposed by Rahgozar, of at for fatigue notch factor considering the corrosion effect is used in order to incorporate the corrosion effect into the fatigue strength reduction and S-N curve. Finally, the effectiveness of LCC model proposed for high-speed railway steel bridges is demonstrated by a numerical example.