• Title/Summary/Keyword: Railway Project

Search Result 574, Processing Time 0.03 seconds

A Study on Noise Characteristics in the Running Train of the Urban Railway (도시철도 영업운행열차 내 소음에 관한 고찰)

  • Kim, Hyo-San;Lee, Chang-Hun;Kim, Gwang-Eun;Lee, Gyu-Chon;Park, Jin-Dong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.93-99
    • /
    • 2008
  • The SeoulMerto, operating subway line No.$1{\sim}4$, was constructed in the metropolitan Seoul with the highest population. When it was built, the design was challenged to sharp curved tracks considering the protection of buildings, cultural assets, the connection to ground roads and rivers as well as to elevated railway in some parts. Lots of residential apartments and business complex have gradually increased in the area around subway stations and railway lines according to the urban development. Consequently, Requirements of better quality of life and comfortable environment caused the citizen complain for the noise. It has become one of serious social issues. In this paper, Noise level was analyzed using noise map measured in the running train of all routes. The analysis on the noise level was conducted according to railway type, track components type, seasonal type, retirement degree of the vehicle and subway station. Especially, Noise characteristics were analyzed by noise level data measured in the inside and outside of the train with geometry types of the concrete track. This study will contribute fundamental data for the "The Development of Sound-Absorbing Block on Concrete Track" promoted on The National R&D Project.

  • PDF

Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway - (철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -)

  • Kim, Hwan-Yong;Shin, Min-Ho;Han, Sang-Cheon;Choi, Young-Woo;Kim, Chang-Ho
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

Implementation and Analysis of Railway Design Model using ei-Rail with Joong-Ang and Seo-Hae Lines (ei-Rail을 활용한 노선설계 모형의 적용 및 중앙선/서해안선 사례분석)

  • Shin, Youngho;Kim, Jeong Hyun;Oh, Jitaek
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.407-415
    • /
    • 2015
  • The railway route and alignment planning have been executed with a limited number of alternatives based on the site pre-survey and the topographic map. This study developed an intelligent railway alignment planning program (ei-Rail) which can derive all the considerable design alternatives and provide the data for the alternative evaluation such as constructions cost, operation cost, and etc. According to the comparisons with prevailing planned railway projects, the time and cost for planning can be reduced as well as the construction costs. This program may contribute to the development of railway industry by reducing the time and cost for planning as well as the total project cost.

Customer Satisfaction Analysis for Urban Railway Service Quality by IPA Analysis (IPA 분석을 이용한 도시철도 서비스품질의 고객만족도 분석)

  • Kim, Heung-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.5
    • /
    • pp.502-511
    • /
    • 2015
  • The purpose of this study is to prioritize the importance of urban railway service quality through statistical analysis. This was done to maximize customer satisfaction by providing customers of urban railway services (including LRT), operated by the local government, with a better customized service quality. It was hoped that this project would boost the need for public transportation by increasing customer satisfaction, which would eventually lead to more profitable revenue. The results of validity certification of expectations and perceptions before and after the use of government funded urban railway and private sector invested urban railways show that there are gaps for 18 items for the government funded urban rail projects (p<.01), while there is no significant difference for 2 items between expectation and perception (p>.05); private sector invested urban railway projects show differences for all 20 items (p<.001). Therefore, IPA analysis is conducted to improve the service quality; this should lead to a remedy that focuses on service quality. The findings of this study will contribute to providing management strategies for boosting customer satisfaction and creating revenue through customized service quality in the urban railway operating industry (including LRT), which is currently suffering from chronic deficits.

Sensitivity Analysis for Railway Development Areas Using Land Cover Map (토지피복지도를 활용한 철도개발지의 민감도 분석)

  • Kim, Min-Kyeong;Kim, Dong-Yoeb
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.76-84
    • /
    • 2017
  • Recently, the 'Ecological Network Restoration Project at Chupungnyeong' has been placed; this project is located at the center of the Baekdu mountain spine, the core of the ecological network of the Korean Peninsula. In the process of industrialization since the early 1900s, this area has been under railroad and road construction; as such, wildlife movements have been interrupted and many cases of road-kill have been found. The investment in railroads has increased because railroads are an environmentally sound means of transportation. Single track railways have been converted to double track electric railways and track reforming projects are underway in order to speed up the current railway system. This study suggests to take land use as a standard for assessing the ecological weaknesses of the domestic geo-spaces that are to be affected by rapid extension of railway lines. The land cover map issued by the Ministry of Environment was overlapped with the Korean Railway Line Map for analysis. The results showed that five items were high in sensitivity: paddy fields, fields, deciduous forests, bare land, and inland waters. It seems to be necessary to set weights for highly sensitive land use types; also, specific evaluation criteria need to be reestablished.

An operational issues analysis of ICT-based on-board train control system (ICT기반 차상제어시스템 개발에 따른 운영 이슈 사항 분석)

  • Kim, Young-Hoon;Choi, Won-Suk
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1043-1048
    • /
    • 2011
  • In the case of a low density branch line, these areas are operating at a loss. So much money is used for infrastructure maintenance cost. To solve the problem, our institute have a project to develop the Information & Communication Technology based train operation system. In a similar research in the Europe, The UK's Transport Research Laboratory experienced analysis of operational issue for developing ERTMS from Level II to Level III. In this paper, we study about railway operational issues before development of ICT based train operation system. An analysis target of operational issues are railway business process & data, drivability and moving or virtual block system.

  • PDF

A study on the risk assessment based on the semi-quantitative methodology (준 정량적 방법의 위험성 평가에 대한 연구)

  • Jung, Da-Woon;Oh, Sang-Min;Yoo, Deung-Ryeol;Seo, Jung-Wook;Kim, Du-Ill
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1425-1432
    • /
    • 2011
  • The various risk assessment methodologies have been introduced in the railway industries. The risk assessment suggested by CENELEC are described with two ways; quantitative and qualitative methods. However, in the industry application level, the quantitative method is hard to apply for a project because of somehow complicated or few statistical figures which was driven from the on-site and the qualitative method is too subject to have the confidence of its results fully. In this paper, the state-of-the-art methods which were suggested in Europe recently are introduced and compared to existing quantitative and qualitative methods. Furthermore, the application measures of railway projects are investigated.

  • PDF

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

A Case Study on the Application of Configuration Management Process for the Development of High-Safety Railway Signaling System Based on International Standards (국제표준기반의 고안전성 철도신호시스템 개발을 위한 형상관리프로세스 적용사례 연구)

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.108-115
    • /
    • 2019
  • The activities of managing and controlling the configuration of a system component over its life cycle are critical tasks in developing a high safety system as well as general system development. These configuration management activities should be defined through the management plan at the beginning of the life cycle, and should be performed continuously and systematically until the end of the project after the system or product development is completed. In this study, the configuration management process applied in the development of high safety railway signaling system was introduced and an efficient application proposals of it was proposed. In particular, configuration management through the establishment of a configuration management system based on computer tools is one of the important activities of maintaining the configuration integrity of the system or product.

A Study on the Performance Elevation Methods of Next Generation Railway Freight Vehicles (차세대 철도화물차량의 성능향상방안에 관한 연구)

  • Ham Y.S.;Hong J.S.;Oh T.Y.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.351-354
    • /
    • 2005
  • Research purpose of this project is intending Maintenance Free of freight car and speed up of freight train. At goods transport as heightening traveling by ship speed of freight train shortening raise railway share of physical distribution and stand on tiptoe to Northeast Asia physical distribution main country to contribute expect. This paper is the performance elevation methods of next generation railway freight vehicles.

  • PDF