• Title/Summary/Keyword: Railway Noise and vibration

Search Result 476, Processing Time 0.033 seconds

The Study on Correction Factor of a Small Scale Reverberation Chamber to Estimate Transmission Loss (소형 잔향실의 확산 음장 보정 계수 측정 연구)

  • Kim, Tae Min;Kim, Da Rae;Kim, Jeung Tae
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.960-965
    • /
    • 2014
  • Transmission loss of specimen is calculated by measuring energy of incident and transmission and using reverberant room of large size. But normal measurement of transmission loss has trouble because it is actually demanded that large area and specimen of certain size is satisfied with condition of diffused sound field. Especially, in case of mechanical component, interested frequency band is mid-frequency band between 500 ~ 2k Hz, and it is used to be available to minimize a reverberation chamber under conditions satisfying acoustic one because production of specimen for transmission loss measurement has limit. But, as in semi-reverberation room, it is difficult to satisfy condition of diffuse sound field and modification factor is applied to complement that. Correction factor when measuring transmission loss using semi-reverberation chamber is required accuracy because it works as main factor determining reliability of reuslts on transmission loss. In this study, it is analyzed that an effect on correction factor based on varying materials and sizes of specimens in order to deduction of it. Also It is confirmed that applied by elicited correction factor with actual railway vehicle's floor has reliability.

  • PDF

The Realtime Railway Data Control System to process Stream Data in Multi Sensor Environments (멀티센서환경에서 스트림데이터를 처리하는 실시간 철도데이터운영시스템 개발)

  • Park, Hyeri;Jung, Subin;Oh, Ryumduck
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.07a
    • /
    • pp.289-292
    • /
    • 2022
  • 본 논문에서는 실제 철도 건널목(교차로)에서 발생하는 소음 및 진동, 차량 및 보행자 사고와 같은 위험 요소로부터 발생하는 위험 상황들을 분류하고, 철도 건널목(교차로) 운행 상황을 구현한 모형 철도 주변에 센서를 부착하여 철도 건널목에서 발생하는 위험 요소들을 아두이노 센서로 감지해 데이터를 수집한다. 또한 수집된 데이터들을 활용하여 사용자의 상황에 맞는 철도데이터 운영시스템을 제안한다.

  • PDF

The Design of Realtime Cognitive System to detect Dangerous Situations in Railway Tunnel Environment (철도터널 환경에서 위험상황 감지를 위한 실시간 인지시스템의 설계)

  • Oh, HyeonJin;You, Song-su;Lee, Seungshin;Oh, Ryumduck
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.07a
    • /
    • pp.293-296
    • /
    • 2022
  • 본 논문에서는 실제 주행하는 철도가 지나가는 터널에서 유발되는 안전사고 및 주변에 거주하는 주민들과, 서식하는 야생동물들에게 피해를 입힐 수 있는 소음과 진동을 감지하고, 철도가 터널을 운행하는 상황을 구현하여, 너털에서의 위험 요소들에 대한 상황 데이이터들을 센서를 통해 데이터 수집을 진행하고 다양한 위험 상황으로부터 실시간 감지를 통해 데이터들을 분석하고 적절한 상황 지원을 위한 실시간 인지시스템 모델을 설계하고 지원한다.

  • PDF

The Blasting Pollution Effects Estimation & The Excavation Construction Case Study Of Personal Museum On Tunnel (산악터널에 인접한 개인 박물관의 발파공해 영향평가 및 굴착 시공사례)

  • Kwon, Soon-Sub;Lee, Myong-Choul;Park, Tae-Soon;Jeong, In-Choul;Lee, Hyun-Gu
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.127-132
    • /
    • 2004
  • The third double-track construction part of work, called Chung Ang Railroad line(Deok-So$\∼$Won-Ju) is in progress and the personal museum located 330m from the starting point of Pal-Dang Tunnel(length=4,470m) line in the canyon is to be effected by rock blasting during the tunnel excavation work, especially museum articles and building itself. This paper is the example of application suitable tunnel rock blasting pattern for excavation after the case study about the investigation and analysis of rock blasting noise pollution during tunnel excavation work. The museum is a three-story building, RC concrete structure and is located 17m from the top of the tunnel, in the center of the double-track line. Comparing estimate vibration frequency with site vibration one, it can be verified the reasonable rock blasting noise pollution as improving the application of tunnel excavation rock blasting pattern. The above pattern has been selected economically and effectively and applied to our construction field.

  • PDF

A study on Cogging Torque attenuation structure of traction motor (트랙션용 전동기의 코깅토크 감쇄 구조에 관한 연구)

  • Ko, Hyung-Keun;Kim, Byung-Kook;Lee, Sang-Kyu;Cho, Jae-Hee;Park, Tae-Hong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2365-2372
    • /
    • 2011
  • The Cogging Torgue is non-uniform torgue in motor which causes noise and vibration to synchronous motors such as BLDC motor, and regardless of load current, is generated by the interaction between permanent magnet rotor and stator slot which is the force of tangential direction that tends to move into the position where the magnetic energy of motor system is minimal. such Cogging Torgue shall be considered in design stage since it is the main factor of motor's noise and vibration. Understanding that Cogging Torgue is generated by the interaction between relatively low stage harmonic flux density gab of permanent magnet rotor and steel slot of stator. This study proposes the method if reducing Cogging Torgue using response surface method which is a kind of design if experiment.

  • PDF

The effect of Mobile Flash Butt Welding (이동식 플래시 버트 용접의 효과)

  • Lee Jun-Sik;Lee Jong-Su;Lee Hak-Kyu;Lee Jung-Kwon;Lee Jee-Ha
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.793-799
    • /
    • 2004
  • In track a third weakness point is joint part, turnout part, curve part. One of them joint part of rail have been known to the most weak point by loosen of joint bar and fish bolt due to impulse and vibration by wheel contact at times. In addition happen to deformation and failure at end of rail, failure and miniature of ballast gravel. Finally impact between wheel and rail become origin cause of a welded rail, noise and vibration. riding condition deterioration, besides track failure. In the present domestic, Thermite and Gas pressure weldings have been used to continuous welded rail(CWR), however stiffness and confidence in quality is lower than Flash butt welding method. FRW have the excellent capacity, however have a shortcoming large scale of machine and power equipment. Therefore we will introduce Mobile Flash Butt Welder can weld in track.

  • PDF

A Study on the Design for Floor Construction which Installed on Next Generation High Speed Train (차세대고속전철 상구조 설계에 대한 연구)

  • Yoo, Bo-Sun;Lee, Joung-Yul;Kim, Kuk-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.35-42
    • /
    • 2011
  • Recently, the Next Generation High Speed Train(hereinafter HEMU-400X) which has been developing is the power distribution type high speed train. The power is on every each car and all bogies are installed on the front and rear of every car comparison with KTX and KTX-Sancheon which are consist of power cars and linkable bogies. HEMU-400X can be designed much more seats than others because there are not power car separately. However, that type has no advantage for vibration and noise due to distributed power and more faster design speed. Therefore, in this study, the design of floor construction for preventing the vibration from under the floor is considered.

  • PDF

Dynamic analysis for High-speed train using acceleration value (고속철도차량의 가속도 값을 이용한 차량 동특성 분석)

  • Kim, Young-Mo;Choi, Sung-Hun;Kim, Ki-Hwan;Park, Tae-Won
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.169-174
    • /
    • 2007
  • Adopting articulated bogie system, the HSR350x and KTX have similar physical mechanical characteristic, but they show different dynamic characteristics due to different position of suspensions and those physical properties. The low level vibration frequency which effects on the ride comfort of passengers and the high level vibration frequency which is related to noise of vehicle have been measured by accelerometers mounted on Wheel sets, Bogies and Car bodies to analysis the dynamic characteristics of the High-Speed Trains. The KTX number 36 is utilized to measure the lateral and vertical acceleration value of car body, and total measurement system of HSR350x have been used to acquire acceleration data. The sampling frequency of data is 500Hz generally, but the Car body at TT2 of HSR350 has 1000Hz exceptionally.

  • PDF

A Case Study on the Design of Railway Tunnel through section for under OO temple (OO 사찰 하부 터널통과 설계 사례)

  • Kim, Shin;Lee, Sung-Ki;Seo, Hyoung-Chul;Kwag, Jung-Yeol;Cho, Bong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.208-218
    • /
    • 2006
  • It is very important to evaluate predictable problems diversely such as stability of a tunnel and structures when tunnel is inevitably constructed in the area where is adjacent to a structure and low overburden. Double electrified railway design on the third section of Donghae-Nambu line studied in this paper has some problems mentioned above. So more careful works are required before construction. In this study, ground surrounding is composed of faults, fault zone and set back about 13m from a Buddhist temple located on the upper part of the tunnel. From these conditions, this case study presents proper methods considering ground condition, effects of blasting and civil petitions. It is tried to make the tunnel and Buddhist temple stable by analytical technique and analysis of existing cases. And design considering stability of tunnel and adjacent structure during operation is carried out as well. Especially, environmentally friendly railway tunnel which is appropriate to the local condition and surroundings is designed by minimizing noise and vibration that is able to occur during construction and train service. From now on, this study is helpful to better design in the case of tunnel design which has to consider civil petition.

  • PDF

Precast Concrete Guideway of Automated Guideway Transit with Rubber Tire. (경량전철 고무차륜용 PC슬레브 궤도)

  • 조능호;정원기;이규정;윤태양;이안호
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.295-302
    • /
    • 2000
  • Slab guideway, surface treatment, heat line installation, and joint connection for Automated Guideway Transit with rubber tire are researched. While the AGT with rubber tire is constructed in city, the precast slab guideway must be considered a reduction of the construction period and the noise under construction. which related with environment. To do that, a basic design and the structural analysis for the precast slab guideway with rubber tire are studied. The surface treatment and the heat line installation of that are also compared with currently used methods. Tining method is applied to the surface treatment adopted from the concrete pavement application currently in use. The connection method between the slab of bridge and precast guideway are suggested with a bolt type and a bond type. To minimize noise and vibration of the connection while the AGT is in driving, the slop connection method can be enhanced the serviceability.

  • PDF