• Title/Summary/Keyword: Railway Infrastructure

Search Result 368, Processing Time 0.028 seconds

TRS Network Design and Inspection by Shared Network in Subway (지하철에서의 공용망을 이용한 TRS 망 설계 및 검증에 관한 연구)

  • Kim, hak-yeoul;Kim, Seong-Cheol
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.14 no.3
    • /
    • pp.231-238
    • /
    • 2021
  • In addition to individual calls and group calls, the Trunked Radio System (TRS), which belongs to a group, can make calls simultaneously, and many users can use it within a limited time by adjusting the call time. Also, the LCX infrastructure network of the subway Most of the FM, firefighting radio, TRS of the National Police Agency and the terrestrial DMB service built in 2005 are commonly connected to the network for service and operation. In connection with the analysis, call reception sensitivity, handoff, interference with other signals, time delay, etc. were analyzed, and tests such as reception field strength for each output of the repeater and the success rate of the call terminal were conducted and the test results were analyzed. In addition, it will help TRS cell design and network construction by predicting equipment output capacity and service coverage based on test results.

Development of Business and Performance Record Standard Template for Rail Infrastructure BIM Performance Management (철도인프라 BIM 성과관리를 위한 업무 및 성과기록 표준 템플릿 개발)

  • Shin, Min-Ho;Kim, Hwan-Yong;Choi, Young-Woo;Han, Sang-Cheon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.50-59
    • /
    • 2020
  • Recently, the government has actively promoted the introduction of BIM at the national level to improve the efficiency and productivity of the construction industry, and private interest in the application of BIM has also increased. However, despite the large amount of references and information, not much research has been done in quantitative ways to accurately measure the performance of BIM projects. The purpose of this study is to review performance measurement cases using ROI, investment effect analysis, and queue model analysis using domestic and overseas BIM guideline research and to present standard templates that can quantitatively measure BIM performance records according to domestic conditions based on this. Performance measurement trends and cases according to the application of BIM were analyzed, and nine quantification elements were derived from this, and based on this, a performance measurement data collection template at the BIM life cycle stage was prepared. Detailed items and contents were prepared for the nine quantification elements, and the final template consisted of a total of 43 questions, divided into the entire stage (15), the beginning (8), the middle (8), and the latter (12) areas. It is expected that by using the standard template of railway BIM performance records developed in this study, the BIM design stage will be diagnosed and the deficiencies will be supplemented, which will be the basic data for measuring actual quantitative performance in all life cycle performance of future BIM projects.

Numerical Evaluation of Settlement Reducing Effect by Partial Reinforcement of Rock Fill (수치해석을 통한 암성토 부분보강의 침하억제 효과 평가)

  • Lee, Su-Hyung;Choi, Yeong-Tae;Han, Jin-Gyu ;Gu, Kyo-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.23-31
    • /
    • 2023
  • The escalating settlements observed in concrete slab tracks pose a significant challenge in Korea, raising concerns about their adverse impact on the safe operation of high-speed railways and the substantial costs involved in restoration. A primary contributor to these settlements is identified as the utilization of rock materials sourced from tunnel construction, incorporated into the lower subgrade without the requisite soil mixing to achieve an appropriate particle size distribution. This study employs numerical analysis to evaluate the efficacy of partial reinforcement in reducing settlements in rock-filled lower subgrades. Column-shaped reinforcement areas strategically positioned at regular intervals in the lower subgrade induce soil arching in the upper subgrade, leading to a concentration of soil loads on the reinforced areas and consequent settlement reduction. The analysis employs finite element methods to investigate the influence of the size, stiffness, and spacing of the reinforced areas on settlement reduction in the lower subgrade. The numerical results guide the formulation of an optimal design approach, proposing a method to determine the minimum spacing required for reinforcements to effectively limit settlements within acceptable bounds. This research contributes valuable insights into addressing the challenges associated with settlement in concrete slab tracks, offering a basis for informed decision-making in railway infrastructure management.

Design and Fabrication of an LPVT Embedded in a GIS Spacer (GIS 스페이서 내장형 저전력 측정용 변압기의 설계 및 제작)

  • Seung-Gwan Park;Gyeong-Yeol Lee;Nam-Hoon Kim;Cheol-Hwan Kim;Gyung-Suk Kil
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.37 no.2
    • /
    • pp.175-181
    • /
    • 2024
  • In electrical power substations, bulky iron-core potential transformers (PTs) are installed in a tank of gas-insulated switchgear (GIS) to measure system voltages. This paper proposed a low-power voltage transformer (LPVT) that can replace the conventional iron-core PTs in response to the demand for the digitalization of substations. The prototype LPVT consists of a capacitive voltage divider (CVD) which is embedded in a spacer and an impedance matching circuit using passive components. The CVD was fabricated with a flexible PCB to acquire enough insulation performance and withstand vibration and shock during operation. The performance of the LPVT was evaluated at 80%, 100%, and 120% of the rated voltage (38.1 kV) according to IEC 61869-11. An accuracy correction algorithm based on LabVIEW was applied to correct the voltage ratio and phase error. The corrected voltage ratio and phase error were +0.134% and +0.079 min., respectively, which satisfies the accuracy CL 0.2. In addition, the voltage ratio of LPVT was analyzed in ranges of -40~+40℃, and a temperature correction coefficient was applied to maintain the accuracy CL 0.2. By applying the LPVT proposed in this paper to the same rating GIS, it can be reduced the length per GIS bay by 11%, and the amount of SF6 by 5~7%.

A Foundational Study on Deep Learning for Assessing Building Damage Due to Natural Disasters (자연재해로 인한 건물의 피해 평가를 위한 딥러닝 기초 연구)

  • Kim, Ji-Myong;Yun, Gyeong-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.3
    • /
    • pp.363-370
    • /
    • 2024
  • The escalating frequency and intensity of natural disasters and extreme weather events due to climate change have caused increasingly severe damage to societal infrastructure and buildings. Government agencies and private companies are actively working to evaluate these damages, but existing technologies and methodologies often fall short of meeting the practical demands for accurate assessment and prediction. This study proposes a novel approach to assess building damage resulting from natural disasters, focusing on typhoons-one of the most devastating natural hazards experienced in the country. The methodology leverages deep learning algorithms to evaluate typhoon-related damage, providing a comprehensive framework for assessment. The framework and outcomes of this research can provide foundational data for the evaluation of natural disaster-induced damage over the entire life cycle of buildings and can be applied in various other industries and research areas for assessing risk of damage.

The Study of Establishing the Multi-pass Eurasian Railroads (유라시아 철도의 다중경로 구축에 관한 연구)

  • Hahm, Beom-Hee;Huh, Nam-Kyun;Hurr, Hee-Young
    • Korean Business Review
    • /
    • v.21 no.2
    • /
    • pp.137-170
    • /
    • 2008
  • This study is presenting the logistics strategy in the international logistics markets which makes competition and corporation among north-east Asian countries to establishing the multi-pass Eurasian railroads. The countries located in north-east area of Eurasia like China, Japan, Russia and Korea are paying higher costs and disutility to the transportations and communications due to repeated conflicts and confrontations causes from the politic problems. They are being used surface transportation for most of all logistics between Europe and Asia except special merchandises because of characteristic of cargo to be air, the Silk Road remains vestige only which was main logistic passage to this area since BC. So far the Trans-Siberian Railway is being used by Russia mostly as north of Eurasian transport because of difficulties of service. The Trans-China Railway built in 1992 is not accomplishing as a international logistic passages. It is expected to take a long lead time because of characteristic of resource development and poor logistic infrastructure to the countries like Uzbekistan, double landlocked country, Mongolia and Azerbaijan, the countries do not be adjacent to the sea, even they have great economic jump-up plans through the development of their own resources. The Shanghai Cooperation Organization(SCO) start to sail officially in 2001 is constructed with China, Russia, Tadzhikistan, Kyrgyzstan, Kazakhstan and Uzbekistan as regular members of 6 countries and Mongolia, India, Pakistan, Afghanistan and Iran as observers 5 countries. It is started as a military alliance to protect terror, but now, it is expended to cooperate with the traffic, transportation, trade and share of energies. The Russia is doing their best to activate TSR as a government target to developnorth area equivalently, and economic develop of far-east Siberia. And also it is agreed provisionally to improve and repair of rail road between Nahjin and Hassan to connect TSR and TKR( Trans-Korea Railroad) by Russia, North Korea and South Korea with Russian's aggressive efforts. The development plan of this area is over lapped with GTI(Greater Tumen Initiative) promoted by UNDP, and is a cooperated project by 5 countries of South Korea, Mongolia, China, Russia and North Korea, subject to review the appropriation of energy, tour, environment, rail road connection between Mongolia and China and establishing a ferry route to north-east Asia. It is Japanese situation to pay attention to Russia and China even they have been supplying large-scope of infrastructure in Mongol area without any charges, target to get East Asia Main Rail Road to connect Mongolia and Zalubino of Russia. In case of the program for the Denuclearization of North Korea is not creeping, it will be accelerated to connect the TKR and TSR, TKR and TCR by somehow attending United States, including developing program promoted by UN ESCAP. As the result, Korean peninsular will continue the central role of competition and cooperation as in the past, now and future of north-east Asia, as of geographical-economics and geographical-politics whether it is requested or not wanted by neighbor countries.

  • PDF

Analysis of Service Factors on the Management Performance of Korea Railroad Corporation - Based on the railroad statistical yearbook data - (한국철도공사 경영성과에 미치는 서비스 요인분석 -철도통계연보 데이터를 대상으로-)

  • Koo, Kyoung-Mo;Seo, Jeong-Tek;Kang, Nak-Jung
    • Journal of Korea Port Economic Association
    • /
    • v.37 no.4
    • /
    • pp.127-144
    • /
    • 2021
  • The purpose of this study is to derive service factors based on the "Rail Statistical Yearbook" data of railroad service providers from 1990 to 2019, and to analyze the effect of the service factors on the operating profit ratio(OPR), a representative management performance variable of railroad transport service providers. In particular, it has academic significance in terms of empirical research to evaluate whether the management innovation of the KoRail has changed in line with the purpose of establishing the corporation by dividing the research period into the first period (1990-2003) and the latter (2004-2019). The contents of this study investigated previous studies on the quality of railway passenger transportation service and analyzed the contents of government presentation data related to the management performance evaluation of the KoRail. As an empirical analysis model, a research model was constructed using OPR as a dependent variable and service factor variables of infrastructure, economy, safety, connectivity, and business diversity as explanatory variables based on the operation and management activity information during the analysis period 30 years. On the results of research analysis, OPR is that the infrastructure factor is improved by structural reform or efficiency improvement. And economic factors are the fact that operating profit ratio improves by reducing costs. The safety factor did not reveal the significant explanatory power of the regression coefficient, but the sign of influence was the same as the prediction. Connectivity factor reveals a influence on differences between first period and latter, but OPR impact direction is changed from negative in before to positive in late. This is an evironment in which connectivity is actually realized in later period. On diversity factor, there is no effect of investment share in subsidiaries and government subsidies on OPR.

Development of Landslide-Risk Prediction Model thorough Database Construction (데이터베이스 구축을 통한 산사태 위험도 예측식 개발)

  • Lee, Seung-Woo;Kim, Gi-Hong;Yune, Chan-Young;Ryu, Han-Joong;Hong, Seong-Jae
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.4
    • /
    • pp.23-33
    • /
    • 2012
  • Recently, landslide disasters caused by severe rain storms and typhoons have been frequently reported. Due to the geomorphologic characteristics of Korea, considerable portion of urban area and infrastructures such as road and railway have been constructed near mountains. These infrastructures may encounter the risk of landslide and debris flow. It is important to evaluate the highly risky locations of landslide and to prepare measures for the protection of landslide in the process of construction planning. In this study, a landslide-risk prediction equation is proposed based on the statistical analysis of 423 landslide data set obtained from field surveys, disaster reports on national road, and digital maps of landslide area. Each dataset includes geomorphologic characteristics, soil properties, rainfall information, forest properties and hazard history. The comparison between the result of proposed equation and actual occurrence of landslide shows 92 percent in the accuracy of classification. Since the input for the equation can be provided within short period and low cost, and the results of equation can be easily incorporated with hazard map, the proposed equation can be effectively utilized in the analysis of landslide-risk for large mountainous area.

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

A study on the development and field application of SP-Rockbolt with high-strength steel pipe (고강도 강관을 적용한 SP-록볼트 개발 및 현장 적용을 위한 연구)

  • Shin, Hyunkang;Jung, Hyuksang;Ahn, DongWook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.651-668
    • /
    • 2017
  • For initial stability of the tunnel, the primary support, Shotcrete and rockbolt shall be placed in the most appropriate time. This is because the role of such support plays a vital role in long-term and short-term tunnel stability. In this study, the rock bolt is an important supporting system that receives the external pressure generated by the stress relaxation during tunnel excavation as axial force and transmits it to the shotcrete on the tunnel excavation surface. Until now, most of the materials of rock bolts have been used in the field, but there have been many problems such as uncertain quality of Chinese materials entering the market, poor packing due to falling down of rock bolts when filled with mortar, and corrosion due to water. Therefore, in this study, we have developed a high strength steel pipe rock bolt using Autobeam material to solve and improve various problems of existing rock bolts. In order to evaluate the performance of the developed bolt, field tests were carried out and the existing mortar filler in order to improve the performance of the rock bolt, the design and construction criteria were studied and the results were included in this paper.