The logistics industry is changing with the diversification of demand and related technology development. Thus, the transportation system is also changing to social problems and environmental damage, and the importance of rail freight is increasing with changes in the international logistics environment. This study analyzes railway freight competition structure using freight volume and suggests improving the competitiveness of railroad freight. To achieve the research purpose, this study was conducted using the Hirshmann-Herfindahl Index(HHI) and Location Quotients(LQ) method. As a result, the concentration trend of railway trends has increased from 0.213 to 0.238 during the last 9 years, and LQ analysis has enabled the identification of local competition lines by item. The study result confirmed that policy measures on railway freight system, railway infrastructure construction and railway operation are necessary to enhance railway competitiveness.
도시철도 출입구 규모는 이용자의 수요에 따라 산정되어야 하나, 우리나라는 일률적인 값을 적용, 출입구 위치에 따라 이용자의 편차가 많이 발생하여 불편을 겪는다. 최근 교통약자편의증진법에 의해 에스컬레이터, 엘리베이터 등의 이동편의시설의 설치가 의무화되고 있지만 기존 역의 경우 이용자 수요와 상관없이 설치 가능한 곳에 주로 배치가 되기 때문에 실질적으로 이용이 많이 불편하다. 이동편의시설 위치 및 규모가 역 설계 또는 건설시 반영될 수 있도록 본 연구에서는 역 출입구별 이용수요를 예측하여 출입구의 이동편의시설 규모 산정 모형을 정립하고자 한다. 이를 위해 역별 승하차 이용수요, 철도역 주변 용도별 건물 연상면적을 활용하여 1일 수요 예측을 위한 다중회귀모형식을 수립하였다. 추정된 모형의 검증을 위해 동대문역과 종각역의 실제 데이터를 이용하였으며, 추가적으로 국내외 에스컬레이터 산정식을 활용하여 출입구별 에스컬레이터 설치 규모를 비교/분석하였다. 그 결과 단일역을 대상으로 이용수요를 추정하는 것이 좀 더 정확하였으며, 종각역은 1번 출구에 상하행 에스컬레이터가 설치되어 있으나, 4번 출구에 설치하는 것이 타당한 것으로 분석되었다. 본 연구는 2018년 게재한 도시철도역 출입구 유출입 이용자 추정 모형 수립 논문의 발전된 형태로 향후 역 신설시 또는 이동편의시설물 설치 및 확장시 활용될 수 있을 것이라 판단된다. 더불어 현재 무분별하게 설치하는 에스컬레이터 설치 기준의 기초가 될 것으로 보인다.
도시철도 수요를 일반적인 4단계 모형에 의해서 역별로 추정하는 경우에는 몇 가지 한계가 존재한다. 첫째 행정동 기반 사회경제지표를 토대로 하므로 행정동 단위의 도시철도 수요가 추정될 수밖에 없다. 그러나 각 행정동에 1개만이 아닌 2개 이상의 역이 위치할 경우 행정동 단위의 수요를 2개 이상의 역에 적절하게 할당하기가 쉽지 않다. 둘째 역별 도시철도 수요는 행정동보다 공간적 범위가 좁은 역세권 특성에 커다란 영향을 받게 된다. 그러므로 역세권보다 넓은 행정동 전체 특성을 기반으로 한 도시철도 수요 추정과 역별 할당에 의한 역별 수요 추정은 부정확할 수밖에 없다. 위와 같이 행정동을 기반으로 한 자료 사용의 한계로 도시철도 역별 수요를 제대로 추정하기 어려운 점이 존재하여, 본 연구에서는 크게 두 가지 방안을 검토하였다. 첫째는 행정동이 아닌 역세권을 기반으로 하는 사회경제지표 자료를 토대로 역별 수요를 추정하는 방안이다. 그러나 이 방안은 자료 수집과 분석에 너무 많은 시간과 노력이 소요되는 것에 비하여, 추정의 정확도는 크게 높아지지 않는 것으로 나타났다. 둘째는 일반적인 4단계모형을 적용하되 역세권 특성을 반영하기 위해 행정동 센트로이드 위치 및 도시철도 역과의 커넥터 거리를 각 역별로 조정하여 역세권을 반영하는 방안이다. 행정동 센트로이드 위치 및 커넥터 거리를 조정하는 두 번째 방법을 적용하여 역별 수요를 추정한 결과를 실제 집계된 서울시 지하철의 역별 수요를 비교한 결과, 각 역별로 매우 근사한 결과를 나타내었다.
The purpose of this study is to assess the seismic performance of a reinforced concrete pier using ductility demand-based seismic design method and nonlinear earthquake analysis. A computer program named MIDAS/Civil(MIDAS IT,2009) for the analysis of the reinforced concrete pier was used. The bridge pier was designed by the ductility demand-based seismic design. In addition, a seismic performance was evaluated through both capacity spectrum method and nonlinear time history method. In order to determine the seismic performance of the bridge pier, the maximum response values from the capacity spectrum method and nonlinear time history analysis were compared each other.
The domestic railway has high speed trains as good as those of countries outside Korea, but the schedule speed in the domestic railway, which is calculated by dividing distance to destination by time, is lower than that of overseas trains. The object of this study is the necessity for the improvement of schedule speed in the Kyeongbu High speed railway. This study was conducted with analyzing foreign cases related to the improvement of schedule speed in order to satisfy the increasing traffic demand. The schedule speed against the high speed of railway advanced countries is over 65%, while it is about 50% in the domestic railway. In conclusion, This study confirmed that there are possibilities and plans about the improvement of schedule speed for using TPS analysis in the Kyeongbu High speed railway.
The railway industry has well developed with Korea's economic growth as follows - Industrial railway's electrification in 1973, Seoul subway opening in 1974, Busan subway opening in 1985, High speed railway opening in 2004. But LRT as city transportation means has been faced with many difficulties. Looking at the LRT projects implemented until now, there are some issues like the transportation demand, the quality & safety of RS and facilities, the poor management of inhabitant complaints and the failure to maintain policy coherence. They have caused not only the project schedule to extend but also the project costs to increase, even to obstruct the project progress itself in some cases. These risk factors become the obstacle of LRT project's success, but it is said that more basic problem is the lack of risk management capability of competent authorities in railway business. Under these circumstance, Railway specialized Authorities and Local government have cooperated to identify various risk factors and to prepare the measures in advance, so we try to introduce this cooperation case, which will help other local government as an useful reference.
Railway is the most effective transportation than any other traffic. But due to the its expensive maintenance fee and various components like roadbed, rail, rollingstock, electric and signal etc, the construction cost of the railway is usually higher than highway. Such a reason, a lot of cost and period are needed to complete the railway project. In addition that considering the decreasing of the SOC budget, the investment in the railway industry is getting hard than ever. This study analyzed the cost, term of work, freight & passenger transportation demand of the wide area railway electrification project and main line improvement project. And it compared the estimation value and real value of the projects like cost and period etc. And this study surveyed the economic feasibility including factors which are not considered in the feasibility study guide. With those results, This study suggest the project management and evaluation method to enlarge the efficiency of the railway construction project.
Today, it is a time when self-help efforts are being made to increase the demand for international certification by domestic and foreign railway orderers and develop excellent railway systems for railway system and railway construction projects. Since 2011, cases of obtaining international certification related to the domestic railway system/products have been collected and analyzed through literature and Internet data and based on the analysis results, evaluation results on the acquisition of international certification in Korea are presented. Through these results, the government, research institutes, and industries will be practical reference materials for international certification-related work.
노선 계획이란 열차종별 수요를 만족하는 최적의 열차 운행 횟수를 결정하는 단계를 말한다. 이러한 노선계획의 주요 입력자료는 통행배정 모형으로부터 산출된 열차종별 구간 통행량이다. 그러나 대부분의 통행배정 모형 또한 노선계획을 통해 구한 열차 운행 횟수 혹은 시격을 입력요소로 요구하므로, 수요예측(통행배정)-노선계획의 단계적 접근은 두 계획간의 상호 모순을 초래하여 부정확한 열차종별 수요 및 노선계획을 도출할 수 있다. 본 연구는 이 두 가지 문제를 통합적으로 고려할 수 있는 최적화 모형과 이에 대한 선형 근사해법을 제시하고, 전체 한국 철도 네트워크에 적용한 실험결과를 제시한다.
This study analyzes the Domestic Economic Ripple Effect (DERE) of the Donghae-Bukpuseon Railway (DBR). Input-Output Analysis and Scenario Analysis are employed. First, the future demand is approximately 6.86 billion people, 1.4 billion tons of logistics, and future forecast production is 1.2 trillion won for passengers, and 0.15 trillion won for logistics. Second, the production inducement (PI) coefficient of the railway industry is 2.080, the value-added inducement (VAI) coefficient is 0.680, the import inducement (II) coefficient is 0.32 and the employment inducement (EI) coefficient is 6.45. Third, for the DERE, PI is 2.846 trillion won, VAI is 0.939 trillion won, II is 0.446 trillion won, and EI is 8,737 people/1 billion won. Fourth, PI is approximately 2.8 trillion won, and the payback period is 35 years. Scenario 1 (a 50% increase in the demand for tourism) takes approximately 27 years, Scenario 2 (an 100% increase), 20 years, and Scenario3 (an 150% increase), 16 years. The successful way of the DBR is to enlarge the linkage effect of trans-railways for which international cooperation and agreements are needed. Also, even if the DBR is isolated due to worsening inter-Korea relations, the development of tourism resources is important for public investment feasibility.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.