• 제목/요약/키워드: Railway Demand

검색결과 403건 처리시간 0.029초

화물철도 노선별 운송 품목의 경쟁구조에 관한 연구 : 우리나라를 중심으로 (A Study on the Competitive Structure of Transportation Items by Freight Railway Lines: The case of South Korea)

  • 송민주;이희용
    • 무역학회지
    • /
    • 제44권4호
    • /
    • pp.153-168
    • /
    • 2019
  • The logistics industry is changing with the diversification of demand and related technology development. Thus, the transportation system is also changing to social problems and environmental damage, and the importance of rail freight is increasing with changes in the international logistics environment. This study analyzes railway freight competition structure using freight volume and suggests improving the competitiveness of railroad freight. To achieve the research purpose, this study was conducted using the Hirshmann-Herfindahl Index(HHI) and Location Quotients(LQ) method. As a result, the concentration trend of railway trends has increased from 0.213 to 0.238 during the last 9 years, and LQ analysis has enabled the identification of local competition lines by item. The study result confirmed that policy measures on railway freight system, railway infrastructure construction and railway operation are necessary to enhance railway competitiveness.

도시철도역 이용수요 추정 및 이동편의시설 규모 예측 비교 분석 (Comparative Analysis of Estimation of Demand for Urban Railway Stations and Forecast of Transportation Facilities Size Prediction)

  • 김황배;이상화;배춘봉
    • 대한토목학회논문집
    • /
    • 제39권6호
    • /
    • pp.877-886
    • /
    • 2019
  • 도시철도 출입구 규모는 이용자의 수요에 따라 산정되어야 하나, 우리나라는 일률적인 값을 적용, 출입구 위치에 따라 이용자의 편차가 많이 발생하여 불편을 겪는다. 최근 교통약자편의증진법에 의해 에스컬레이터, 엘리베이터 등의 이동편의시설의 설치가 의무화되고 있지만 기존 역의 경우 이용자 수요와 상관없이 설치 가능한 곳에 주로 배치가 되기 때문에 실질적으로 이용이 많이 불편하다. 이동편의시설 위치 및 규모가 역 설계 또는 건설시 반영될 수 있도록 본 연구에서는 역 출입구별 이용수요를 예측하여 출입구의 이동편의시설 규모 산정 모형을 정립하고자 한다. 이를 위해 역별 승하차 이용수요, 철도역 주변 용도별 건물 연상면적을 활용하여 1일 수요 예측을 위한 다중회귀모형식을 수립하였다. 추정된 모형의 검증을 위해 동대문역과 종각역의 실제 데이터를 이용하였으며, 추가적으로 국내외 에스컬레이터 산정식을 활용하여 출입구별 에스컬레이터 설치 규모를 비교/분석하였다. 그 결과 단일역을 대상으로 이용수요를 추정하는 것이 좀 더 정확하였으며, 종각역은 1번 출구에 상하행 에스컬레이터가 설치되어 있으나, 4번 출구에 설치하는 것이 타당한 것으로 분석되었다. 본 연구는 2018년 게재한 도시철도역 출입구 유출입 이용자 추정 모형 수립 논문의 발전된 형태로 향후 역 신설시 또는 이동편의시설물 설치 및 확장시 활용될 수 있을 것이라 판단된다. 더불어 현재 무분별하게 설치하는 에스컬레이터 설치 기준의 기초가 될 것으로 보인다.

역세권을 반영한 도시철도 역별 수요추정 모형 개발 (Modeling the Urban Railway Demand Estimation by Station Reflecting Station Access Area on Foot)

  • 손의영;김재영;정창용;이종훈
    • 대한교통학회지
    • /
    • 제27권2호
    • /
    • pp.15-22
    • /
    • 2009
  • 도시철도 수요를 일반적인 4단계 모형에 의해서 역별로 추정하는 경우에는 몇 가지 한계가 존재한다. 첫째 행정동 기반 사회경제지표를 토대로 하므로 행정동 단위의 도시철도 수요가 추정될 수밖에 없다. 그러나 각 행정동에 1개만이 아닌 2개 이상의 역이 위치할 경우 행정동 단위의 수요를 2개 이상의 역에 적절하게 할당하기가 쉽지 않다. 둘째 역별 도시철도 수요는 행정동보다 공간적 범위가 좁은 역세권 특성에 커다란 영향을 받게 된다. 그러므로 역세권보다 넓은 행정동 전체 특성을 기반으로 한 도시철도 수요 추정과 역별 할당에 의한 역별 수요 추정은 부정확할 수밖에 없다. 위와 같이 행정동을 기반으로 한 자료 사용의 한계로 도시철도 역별 수요를 제대로 추정하기 어려운 점이 존재하여, 본 연구에서는 크게 두 가지 방안을 검토하였다. 첫째는 행정동이 아닌 역세권을 기반으로 하는 사회경제지표 자료를 토대로 역별 수요를 추정하는 방안이다. 그러나 이 방안은 자료 수집과 분석에 너무 많은 시간과 노력이 소요되는 것에 비하여, 추정의 정확도는 크게 높아지지 않는 것으로 나타났다. 둘째는 일반적인 4단계모형을 적용하되 역세권 특성을 반영하기 위해 행정동 센트로이드 위치 및 도시철도 역과의 커넥터 거리를 각 역별로 조정하여 역세권을 반영하는 방안이다. 행정동 센트로이드 위치 및 커넥터 거리를 조정하는 두 번째 방법을 적용하여 역별 수요를 추정한 결과를 실제 집계된 서울시 지하철의 역별 수요를 비교한 결과, 각 역별로 매우 근사한 결과를 나타내었다.

도시철도 고가교 및 교량 교각의 연성도 내진설계와 내진성능 평가 (Ductility Demand-Based Seismic Design and Seismic Performance Evaluation of Urban Railway Bridge Pier)

  • 박승희;남민준;윤종구;김진호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1220-1226
    • /
    • 2011
  • The purpose of this study is to assess the seismic performance of a reinforced concrete pier using ductility demand-based seismic design method and nonlinear earthquake analysis. A computer program named MIDAS/Civil(MIDAS IT,2009) for the analysis of the reinforced concrete pier was used. The bridge pier was designed by the ductility demand-based seismic design. In addition, a seismic performance was evaluated through both capacity spectrum method and nonlinear time history method. In order to determine the seismic performance of the bridge pier, the maximum response values from the capacity spectrum method and nonlinear time history analysis were compared each other.

  • PDF

경부고속철도의 표정속도 향상 가능성에 대한 고찰 (A Study on the Possiblity of Schedule Speed Improvement for Kyeongbu HSR)

  • 윤장호;엄기영;박정현;류성찬
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1793-1801
    • /
    • 2011
  • The domestic railway has high speed trains as good as those of countries outside Korea, but the schedule speed in the domestic railway, which is calculated by dividing distance to destination by time, is lower than that of overseas trains. The object of this study is the necessity for the improvement of schedule speed in the Kyeongbu High speed railway. This study was conducted with analyzing foreign cases related to the improvement of schedule speed in order to satisfy the increasing traffic demand. The schedule speed against the high speed of railway advanced countries is over 65%, while it is about 50% in the domestic railway. In conclusion, This study confirmed that there are possibilities and plans about the improvement of schedule speed for using TPS analysis in the Kyeongbu High speed railway.

  • PDF

경전철사업에서의 철도전문기관과 지자체 간의 협력사례 (Cooperation Case between Railway Specialized Authorities and Local Government in LRT Project)

  • 송재일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2217-2224
    • /
    • 2011
  • The railway industry has well developed with Korea's economic growth as follows - Industrial railway's electrification in 1973, Seoul subway opening in 1974, Busan subway opening in 1985, High speed railway opening in 2004. But LRT as city transportation means has been faced with many difficulties. Looking at the LRT projects implemented until now, there are some issues like the transportation demand, the quality & safety of RS and facilities, the poor management of inhabitant complaints and the failure to maintain policy coherence. They have caused not only the project schedule to extend but also the project costs to increase, even to obstruct the project progress itself in some cases. These risk factors become the obstacle of LRT project's success, but it is said that more basic problem is the lack of risk management capability of competent authorities in railway business. Under these circumstance, Railway specialized Authorities and Local government have cooperated to identify various risk factors and to prepare the measures in advance, so we try to introduce this cooperation case, which will help other local government as an useful reference.

  • PDF

철도투자 효율성 향상을 위한 투자전략에 관한 연구 (A Study on the Investment Strategy that improves the Rail-infrastructure Investment Efficiency)

  • 김성;이종국;김윤양
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1574-1586
    • /
    • 2008
  • Railway is the most effective transportation than any other traffic. But due to the its expensive maintenance fee and various components like roadbed, rail, rollingstock, electric and signal etc, the construction cost of the railway is usually higher than highway. Such a reason, a lot of cost and period are needed to complete the railway project. In addition that considering the decreasing of the SOC budget, the investment in the railway industry is getting hard than ever. This study analyzed the cost, term of work, freight & passenger transportation demand of the wide area railway electrification project and main line improvement project. And it compared the estimation value and real value of the projects like cost and period etc. And this study surveyed the economic feasibility including factors which are not considered in the feasibility study guide. With those results, This study suggest the project management and evaluation method to enlarge the efficiency of the railway construction project.

  • PDF

안전성 중시 철도제품의 국제인증 획득 사례를 통한 통계적 분석 및 시사점에 관한 연구 (A study on the statistical analysis and implications cases of obtaining international safety certification in safety critical railway products)

  • 최요철
    • 시스템엔지니어링학술지
    • /
    • 제17권2호
    • /
    • pp.114-121
    • /
    • 2021
  • Today, it is a time when self-help efforts are being made to increase the demand for international certification by domestic and foreign railway orderers and develop excellent railway systems for railway system and railway construction projects. Since 2011, cases of obtaining international certification related to the domestic railway system/products have been collected and analyzed through literature and Internet data and based on the analysis results, evaluation results on the acquisition of international certification in Korea are presented. Through these results, the government, research institutes, and industries will be practical reference materials for international certification-related work.

통행배정-노선계획 통합 모형을 위한 선형 근사화 알고리듬 개발 (An Iterative Linear Approximation Algorithm for a Unified Model of Traffic Assignment and Line Planning in Railway Networks)

  • 박범환
    • 한국철도학회논문집
    • /
    • 제17권2호
    • /
    • pp.140-147
    • /
    • 2014
  • 노선 계획이란 열차종별 수요를 만족하는 최적의 열차 운행 횟수를 결정하는 단계를 말한다. 이러한 노선계획의 주요 입력자료는 통행배정 모형으로부터 산출된 열차종별 구간 통행량이다. 그러나 대부분의 통행배정 모형 또한 노선계획을 통해 구한 열차 운행 횟수 혹은 시격을 입력요소로 요구하므로, 수요예측(통행배정)-노선계획의 단계적 접근은 두 계획간의 상호 모순을 초래하여 부정확한 열차종별 수요 및 노선계획을 도출할 수 있다. 본 연구는 이 두 가지 문제를 통합적으로 고려할 수 있는 최적화 모형과 이에 대한 선형 근사해법을 제시하고, 전체 한국 철도 네트워크에 적용한 실험결과를 제시한다.

동해북부선 철도의 경제적 효과 (Economic Analysis of the Donghae-Bukppuseon Railway)

  • 김선주
    • 토지주택연구
    • /
    • 제11권4호
    • /
    • pp.15-26
    • /
    • 2020
  • This study analyzes the Domestic Economic Ripple Effect (DERE) of the Donghae-Bukpuseon Railway (DBR). Input-Output Analysis and Scenario Analysis are employed. First, the future demand is approximately 6.86 billion people, 1.4 billion tons of logistics, and future forecast production is 1.2 trillion won for passengers, and 0.15 trillion won for logistics. Second, the production inducement (PI) coefficient of the railway industry is 2.080, the value-added inducement (VAI) coefficient is 0.680, the import inducement (II) coefficient is 0.32 and the employment inducement (EI) coefficient is 6.45. Third, for the DERE, PI is 2.846 trillion won, VAI is 0.939 trillion won, II is 0.446 trillion won, and EI is 8,737 people/1 billion won. Fourth, PI is approximately 2.8 trillion won, and the payback period is 35 years. Scenario 1 (a 50% increase in the demand for tourism) takes approximately 27 years, Scenario 2 (an 100% increase), 20 years, and Scenario3 (an 150% increase), 16 years. The successful way of the DBR is to enlarge the linkage effect of trans-railways for which international cooperation and agreements are needed. Also, even if the DBR is isolated due to worsening inter-Korea relations, the development of tourism resources is important for public investment feasibility.