• Title/Summary/Keyword: Railroad-tunnel

Search Result 233, Processing Time 0.039 seconds

Study on the Establishment of Reduction Goals for Air Pollutants Emissions from Diesel Locomotives in Korea by Comparison with Emission Regulation in United States (미국 디젤기관차의 매연 배출기준과 비교한 국내 디젤기관차의 매연 배출 저감목표 설정 연구)

  • Park, Duck-Shin;Kwon, Soon-Bark;Lim, In-Gwon;Cho, Young-Min
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.152-157
    • /
    • 2006
  • The air pollutant emission from the railroad diesel locomotive is still a significant environmental concern in many countries including Korea and Unites States. The emission characteristics of the railroad diesel locomotive were extensively studied in this study. Particulate matter (PM) and nitrogen oxides ($NO_x$) emitted from a large locomotive engine (2-cycle, 16-cylinder, and 3,000-horsepower) under various engine-rating conditions was analyzed with a scanning mobility particle sizer and a gas stack sampler by using a dilution tunnel. We could gain the emission values of 2.1 g/horsepower-hour for PM and 42.7 g/horsepower-hour for $NO_x$. We proposed the emission reduction goal of the railroad diesel locomotive for Korea in comparison with the regulation of United States.

  • PDF

Case Study on the detailed standard setting and Application for QRA in Honam high speed railway tunnel (호남고속철도터널의 정량적 위험도 분석(QRA)을 위한 세부기준수립 및 적용사례)

  • Kim, Seon-Hong;Moon, Yeon-Oh;Seok, Jin-Ho;Kim, Ki-Lim;Kim, Chan-Dong;Yoo, Ho-Sik
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.10a
    • /
    • pp.249-260
    • /
    • 2008
  • Although the accident rate is lower than the road tunnel, fire in railway tunnel can bring large damage of human life. In the high speed railway tunnel, the possibility of the railway-disaster (fire) is growing in consideration of the speedy railway and the tunnel length. For that reason, MLTM (Ministry of Land, Transport and Maritime Affairs) published "Rules about the Safety Standard of Railroad (2005.10.27)" and "The Detailed Safety Standard of Railroad (2006.9.22)". According to those, QRA(Quantitative Risk Analysis) technique is recommended to be applied to railway tunnel design which is longer than 1km for assuring the safety function and estimating the risk. However, it is difficult to perform the disaster prevention design due to lack of the detailed standards about event scenario, fire intensity, incidence rate of accidents etc. Therefore, This paper introduces the case of tunnel design for disaster prevention of the Honam high speed railway including the detailed standards of QRA and reasonable safety facilities.

  • PDF

Behaviour Characteristics of Tunnel in the Cavity Ground by using Scale Model Tests (축소모형실험을 이용한 공동지반에서의 터널 거동특성)

  • Chung, Jeeseung;Moon, Innki;Yoo, Chanho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.12
    • /
    • pp.61-69
    • /
    • 2013
  • As construction for road and train tunnel is increasing, various geotechnical conditions can be faced during the construction stage. Especially, if the tunnel is located in limestone area, the cavity is mostly to locate in tunnel planning location. One or some cavities which can be harmful for tunnel safety are predicted. Hence, this study was fulfilled to confirm the influence between tunnel and cavity using laboratory scale down model test and numerical analysis. The scale down model test was carried out to confirm the failure load of the model ground about the interval length of cavity and tunnel and to analyze behaviour characteristics of the model ground on the cavity shape. From the model test result, the failure load decrease in accordance with decreasing of interval length between cavity and tunnel within 0.5D. The numerical analyses were carried out for verification about scale down model test. From the numerical analysis result, tunnel safety decreases in the case of the interval between cavity and tunnel within 0.5D.

A Study on the Applicability of the Conventional TTX Propulsion System on the High-speed Propulsion System for a Deep-underground GTX

  • Park, Chan-Bae;Lee, Byung-Song;Lee, Ju
    • International Journal of Railway
    • /
    • v.3 no.2
    • /
    • pp.54-59
    • /
    • 2010
  • In order to develop the deep-underground GTX (Great Train eXpress) in domestic, the running performance analysis of the propulsion system by a variety of route condition must be carried out before studying the specification and the development of the high-speed propulsion system with inverter and traction motor. Then it is necessary to study the running resistance properties of the high-speed traction system for the variety of tunnel type and vehicle organization method at first. In addition, the properties of the power requirement of the traction motors needed to maintain the balanced speed of the high-speed traction system are next studied. We need to study properties of the emergency braking distance caused by the highest operation speed of the high-speed traction system and present the fundamental design technologies to develop the high-speed traction system for the deep-underground GTX. Finally, the paper analyzes the applicability of the conventional Korean Tilting Train eXpress (TTX) propulsion system on the high-speed propulsion system for the deep-underground GTX.

  • PDF

Change analysis with A.C of D.C electric railway (직류 전기철도의 교류화 분석)

  • Kim, Youn-Sik;Lee, Gi-Seung;Sim, Jae-Suk
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.151-156
    • /
    • 2008
  • The after 1974 capital region electric railroad is opened to traffic Koraill and Seoul metro adopt each other different power supply method and they operate and they are come. AC 25[kv] method voltage the insulation becomes larger standing distance highly, the case tunnel section which will introduce in the underground segment becomes on a large scale and the cost of construction increases to the city center and the underground segment adoption of DC method was many. To recent times with R-bar (Rigid-bar) introductions change of tunnel section the introduction of AC method came to be easy without in the underground segment. Operates sees in the electric protection where the Seoul metro and the Korail are different each other and, from the dead section segment the interior electric light to put out lights the passenger brings about inconveniently and the civil appeal which demands a power supply method unification occurs, within the company interchange electric railroad brazier safety improvement and maintenance expense curtailment etc. the flaw is original proposal, is a condition which finishes a feasibility study service about the power supply method fringe land. Interchange analysis of the DC electric railway it leads from the present paper and it compares under analyzing being it could be reflected to also the route which is in the process of actual using boil the strong point and a weak point of DC and AC method of the establishment route constructive at the time of and

  • PDF

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

A Study on the Running Stability of the High-speed Train by Wind Pressure and Crossing (고속열차의 풍압 및 교행에 의한 주행안정성 연구)

  • Jeon, Chang-Sung;Yun, Su-Hwan;Kim, Seog-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.880-887
    • /
    • 2020
  • This study was conducted to investigate the running stability of a high-speed train operated in a tunnel and an open field when external forces such as wind pressure and train crossings were applied to the vehicle. With no external force, the running stability at 400 km/h was examined, and the wheel weight reduction ratio, lateral pressure of the axles, and derailment coefficient satisfied the criteria of the technical standards for a high-speed train. When the distance between the centers of the tracks is 4.6 m, the external force caused by train crossing slightly affects the lateral acceleration of the vehicle but does not significantly affect the wheel weight reduction rate, lateral pressure, and derailment coefficient in a tunnel and open filed. When the distance is 4.6~5.0 m, the wheel weight reduction ratio, lateral pressure, and derailment coefficient satisfy the criteria with 20 m/s wind. When the wind speed was 30 m/s, the derailment coefficient satisfied the criteria, and the other variables exceeded them. It is predicted that a high-speed train can be operated safely at 400 km/h with wind speed of up to 20 m/s, and it should be slowed down at a wind speed of 30 m/s.

A Propose of Design Parameters for the Max. Speed of 250 km/h of Overhead Rigid Conductor System (250 km/h급 강체전차선로 설계파라미터 제시)

  • Lee, Kiwon;Cho, Yong Hyeon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.4
    • /
    • pp.740-744
    • /
    • 2017
  • Overhead Line is divided by two systems which are OCS (Overhead Catenary Line) and R-Bar (Overhead Rigid Conductor system). R-Bar has an advantage of maintenance and economic aspect comparing with OCS. R-Bar in Korea has developed for the max. speed of 120km/h, but it is evaluated up to the max. speed of 250 km/h in Europe. There are lots of mountains and underground sections in korea, it is really necessary to develop the R-Bar for a high-speed line. In the study, design parameters for the max. speed of 250 km/h of R-Bar was proposed. A bracket space, stiffness, and especially an installation tolerance of contact wire height at a bracket were considered as a parameter, and a dynamic behavior between a contact wire and pantograph was predicted by evaluated FEM simulation tool. The installation tolerance and bracket space are more important for the high-speed system. The proposed parameters was decided very conservative. Because the aerodynamic characteristics of a pantograph in tunnel is more severe than an open route and the simulation tool is not considered the such kind of aerodynamic characteristics.

perforation of tunnel in limestone formation (석회암층의 터널관통사례)

  • Kim, Yong-Il;Hwang, Nak-Yeon;Jeong, Du-Seok;Hong, Jong-Sang;Lee, Nae-Yong
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2007.03a
    • /
    • pp.64-80
    • /
    • 2007
  • This paper presents a case study on the excavation of a long tunnel(16.2km) named as "Sol-An tunnel", which connects between Mt. Dongbaek station and Dokye station in the Young-dong Railroad. This site is located in a complex geological region with faults, cavities and coal measures as sedimentary rocks area. It occurred geotechnical problems unexpectedly by running water when tunnelling in limestone area within those geological structures. This tunnel caused surface settlements through the decrease of ground water level and soil washed-out affecting by cavities and faults within limestone formation. This paper presents a analysis of source through a close investigation and measures. And also, does preventive measures about returns of settlements reflected by properties of limestones.

  • PDF