• 제목/요약/키워드: Rail site

검색결과 99건 처리시간 0.025초

장대레일 재설정 방법 개선 연구 (A study on the refined resetting for the continuous weleded rail)

  • 김우진;정찬묵;민경주
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.386-394
    • /
    • 2007
  • Due to the transportability problems, long rail shall be from base rail unit, which is normally 100m for regular rail and 300m for high speed rail. After these rail units are transported from the fabricator to the site, the field weld would be performed.axial stresses in the long rail is mainly from the temperature differences at various locations the long rail. Also the gaps between each welds cause secondary axial stresses in the rail. In addition to these, re-welds the fractured rails, rail buckling, irregular rail vibration, rail twist also result innonuniform axial stresses in the rail. To obtain the rail buckling stability, the rail stresses shall be released due to the resetting of CWR. Traditionally two resetting of CWR methods have been applied, the one is rail heater and the other is rail tenser. these methods, the latter has been recommended because it has less limitation in the rail length and it is easier to minimized the force differences. But even in this method, the calculation is cumbersome and is not easy to find out the rail stress distribution itself.refined methodsxial stress resetting in the long rail is studied and this study be easily applied in the real construction. From this approach, more rational rail maintenance system can be expected.

  • PDF

경전철 산업 발전방안 연구 (A Study on the Development Strategies for the Light Rail Transit Industry)

  • 정경렬;윤세균;최용훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.500-509
    • /
    • 2005
  • Light-rail transit system has many characteristics of better accessibility. frequency service, low construction cost, reduced air pollution and medium-capacity public transport etc. Light rail transit system as a urban transportation system has been growing worldwide since the late 20th century. More than 300 cities around the world have light railway systems. Many medium-size cities in domestic site is planning the construction of light railway. This paper describes the development strategies for the light rail transit industry.

  • PDF

경부고속철도 교량상 장대레일의 온도응력 계측 실험 (Investigation of Thermal Stress of Continuous Welded Rail on High Speed Railway Bridge)

  • 강재윤;최은석;진원종;이정우;곽종원;김병석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.458-461
    • /
    • 2007
  • Recently, the continuous welded rail(CWR) track has been used for less maintenance of the High-speed railway tracks. In case of CWR track, track buckling has always been an unpredictable event under the high compressive stress in rail. The behavior and stress state of CWR track is manily influenced by its thermal variations, and it is important to understand seasonal variations of rail temperature and stress to predict the track stability. This paper describes the in-site measurement for the rail temperature and rail stress, and the correlation between the rail temperature and stress was examined.

  • PDF

AHP 분석을 통한 역세권 개발 입지 평가 지표 개발 및 적용 (A Study on Development and Application of Evaluation Index for Rail Station Area Development Site Using AHP)

  • 심상우;이규진;최기주;전성민
    • 대한토목학회논문집
    • /
    • 제35권2호
    • /
    • pp.447-453
    • /
    • 2015
  • 본 연구에서는 역세권 개발 입지 평가를 위한 객관적인 평가 지표 및 가중치를 제시하고자 한다. 역세권 개발 입지 평가를 위한 평가 지표는 정량화 가능 여부, 신설 역사 적용 가능성, 자료 수집의 지속가능성, 평가 지표간 상관관계 및 전문가 의사결정기법을 통해 선정하였고, 그 결과 철도 및 지하철 수요, 공시지가 비율 등 8개 지표가 선정되었다. 수요, 사업성, 지역성으로 분류하여 선정된 평가 지표를 계층화한 후 AHP (Analytic Hierarchy Process) 분석을 수행한 결과 가중치는 수요(0.486), 사업성(0.369), 지역성(0.145)의 순으로 나타나 지역성보다는 수요 및 사업성이 중요한 것으로 나타났다. 기존 75개 철도역을 대상으로 적용한 결과 수도권은 수요, 지방지역은 사업성이 높은 철도역의 평가 결과가 높게 나타났다. 이러한 결과로 볼 때 역세권 개발 입지는 수요와 사업성을 기반으로 검토될 필요가 있을 것으로 판단되며, 본 연구 결과는 역세권 개발을 위한 초기 단계에서 의사결정을 위한 기초 자료로 활용될 수 있을 것으로 기대된다.

텅레일 밀착력 측정기 개발에 관한 연구 (Study on developing CSEM Sratch Tester of tongue rail)

  • 이남일;고양옥;정호형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1663-1668
    • /
    • 2010
  • The terms of track is a train-only line for a train service, in premises of station of a station, that the unit over the track for turnout the track from one track to another track, which it changes the course from the main track that is used for operating a train to the side track, is called a turnout The stick strength of tongue rail is adjusting uniform pressure on the both sides, the adhesion strength between a basic rail and tongue rail has to maintain over 100kg of power value to open over 1mm the ends. This study suggested developing a measuring instrument that can measure a basic rail and the stick strength of a movable rail in according with a switch, such as a switch point, and a performance test. This study ties to be helped that it improves measuring usability for the maintainers through improving quality in a stick measuring instrument, that it solves a technique in the site difficulties through improving a measuring instrument, with reducing the obstacles and expenses.

  • PDF

경전철 산업 활성화 및 발전 방안에 관한 연구 (A Study on the Development Strategies for the Light Rail Transit Industry)

  • 정경렬;윤세균;최용훈
    • 한국철도학회논문집
    • /
    • 제9권1호
    • /
    • pp.95-101
    • /
    • 2006
  • Light rail transit system has many characteristics of better accessibility, frequency service, low construction cost, reduced air pollution and medium-capacity public transport etc. Light rail transit system as a urban transportation system has been growing worldwide since the late 20th century. More than 300 cities around the world have light railway systems. Many medium-size cities in domestic site is planning the construction of light railway. This paper describes the development strategies for the light rail transit industry.

레일절손검지장치 현장적용 및 안정화에 관한 연구 (A Study on the Application on Site and Stability of Broken Rail Detection Equipment)

  • 최시행;차관봉;이종성;정수영;이희성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2082-2089
    • /
    • 2011
  • This study is examination of application on site for performance and stability of real-time broken rail detection equipment development system about connection, welded part occurring data errors of broken rail monitoring system. As a result of analysis about data collected in Seoul Metro No.2 Subway from Mar. 2010 to Jan. 2011, we found it is possible to detect crack location(Thermit welding) within the margin of error of ${\pm}1m$ accurately as the first attenuation was -1.2dB and the second was -1.3dB.

  • PDF

강우시 철도성토사면의 열차운전규제기준에 관한 연구 (A Study on the rail-transport operation control for railway embankment under rainfall)

  • 김현기;박영곤;신민호;김수삼
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.514-519
    • /
    • 2001
  • There are a close relationship between natural disasters and train safety. So it is very important to guaranty train safety using reasonable rail-transport operation control against disasters. Therefore, based on the past record of rainfall at failure, rail-transport operation control for railway embankment under rainfall was set up. After slope check list at home and abroad had been analyzed, new slope check list was suggested and site investigations were carried out using this check list. In order to evaluate the stability of railway slopes under rainfall, explanatory variables and subordinate variables were selected for multi-variate analysis and critical rainfall was defined by statistical process. Rail-transport operation control including regional and geological properties was suggested by analyzing the critical rainfall and rail-transport operation control in other country, and this will be a good tool to control train speed under rainfall and to secure train safety.

  • PDF

판형교 장대화에 따른 성능 개선 (Performance Improvement on Plate Girder Bridges Through Continuous Welded Rail)

  • 민경주;반걸용;류연종
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1439-1449
    • /
    • 2007
  • The challenging aspect of CWR (continuous welded rail) is the additional axial forces in rails, mainly due to the thermal expansion of steel plate girder and rail itself. It has been found that these axial forces are proportional to girder length, total bridge length and bolt tightening forces. Also these forces are dependent to girder support conditions, types of bearings and their arrangements. With CWR, the authors' previous studies show that performance improvements like noise reduce, fatigue resistances and bearing durability increment can be expected. In addition to these effects, secondary effects due to the semi integral behavior between rail and bridge girder also can be expected. Special bearings which can reduce the absolute maximum axial forces have been developed, and applied to real 100m span bridge. The performance improvements were verified through site measurements and numerical analysis. The purpose of this study is to confirm the expected performance improvement aspects of steel plate girder bridges with CWR. To verify these aspects, girder stiffness changes, rail axial force changes, girder displacements and noise level were thoroughly measured and compared.

  • PDF

유류로 오염된 철로지역의 지중정화를 위한 영향반경 산정과 공기주입법/토양증기추출법의 적용성 평가 (Calculation of Radius of Influence and Evaluation of Applicability of Air Sparging/Soil Vapor Extraction system for the Remediation of Petroleum Contaminated Rail Site)

  • 조장환;박정구;김용덕;서창일;김해금;최상일
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제20권1호
    • /
    • pp.1-6
    • /
    • 2015
  • The objectives of this study were to calculate the radius of influence (ROI) of well for an air-sparging (AS)/soil vapor extraction (SVE) system and to evaluate the applicability of the system applied for the remediation of the petroleum contaminated rail site. For air permeability test, three monitoring wells were installed at a location of 1.3 m, 2.3 m, 3.0 m from the extraction well. And the pressure of each monitoring well was measured by extracting air from the extraction well with the pressure and flow of $(-)2,600mmH_2O$ and $1.58m^3/min$. The ROI for an extraction well was calculated as 4.31 m. Air was injected into the injection well with the pressure and flow of $3,500mmH_2O$ and $0.6m^3/min$ to estimate the radius of influence for oxygen transfer. Oxygen concentrations of air from three monitoring wells were measured. The ROI of an injection well for oxygen transfer was calculated as 3.46 m. The 28 extraction wells and 19 injection wells were installed according to the ROI calculated. The AS/SVE system was operated eight hours a day for five months. The rail site was contaminated with the petroleum and concentrations of benzene, toluene, and xylene were over the 'Worrisome Standard' of the 'Soil Environment Conservation Act'. The contaminated area was estimated as $732m^2$ and contaminants were dispersed up to (-)3 m from the ground. During the operation period, soil samples were collected from 5 points and analyzed periodically. With the AS/SVE system operation, concentrations of benzene, toluene, and xylene were decreased from 7.5 mg/kg to 2.0 mg/kg, from 32.0 mg/kg to 23.0 mg/kg, from 35.5 mg/kg to 23.0 mg/kg, respectively. The combined AS/SVE system applied to the rail site contaminated with volatile organic compounds (VOCs) exhibited a high applicability. But the concentration of contaminants in soil were fluctuated due to the heterogeneous of soil condition. Also the effect of the remediation mechanisms was not clearly identified.