• 제목/요약/키워드: Rail road tunnel

검색결과 24건 처리시간 0.026초

도로 터널 스마트관리를 위한 디지털 트윈 및 지능형 레일 로봇 개발 (Development of Digital Twin and Intelligent Monorail Robot for Road Tunnel Smart Management)

  • 손영우;박재홍;김응욱;정영식
    • 한국산업융합학회 논문집
    • /
    • 제27권1호
    • /
    • pp.25-37
    • /
    • 2024
  • The objective of this study was to create intelligent rail robots that are optimized for facility management and implement digital twin systems for smart road tunnel management. An autonomous surveillance system is formed by combining the sensing platform consisting of railing robots, fixed cameras and environmental detection sensors with the digital twin data platform technology for tunnel monitoring and early fire suppression. In order to develop mobile rail robots for fire extinguishing, we also designed and manufactured robots for extinguishing & monitoring and fire extinguishing devices, and then we examined the optimization of all parts. Our next step was to build a digital twin for road tunnel management by developing continuous image display system and implementing 3D modeling. After constructing prototypes, we attempted simulations by configuring abnormal symptom scenarios, such as vehicles fires. This study's proposal proposes high-accuracy risk prediction services that will enable intelligent management of risks in the tunnel with early response at each stage, using the data collected from the intelligent rail robots and digital twin systems.

철도터널의 환기특성에 관한 연구 (The Characteristics of Ventilation in Railway Tunnel)

  • 유지오;신현준;이호석
    • 한국터널지하공간학회 논문집
    • /
    • 제2권2호
    • /
    • pp.22-31
    • /
    • 2000
  • 철도터널에서 오염물질의 거동은 열차의 운행조건 및 터널의 구조 등과 같은 다양한 인자에 의해 영향을 받아 매우 복잡한 양상을 보이게 된다. 본 연구에서는 SES프로그램을 수정하여 해석한 농도계산을 이용하여 철도터널에서 오염물질의 거동특성을 구명하고, 터널의 단면적, 길이 및 열차의 항력계수, 주행속도가 터널의 최대풍속 및 오염농도에 미치는 영향에 대한 분석결과를 제시하였다.

  • PDF

예산배분을 위한 철도선로구간의 노후도 평가 (Deterioration Evaluation of Railway Line Segments for Budget Distribution)

  • 김성호;최찬용;나희승
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1802-1809
    • /
    • 2011
  • A distribution method of limited budget for rail line facility improvement is to use investment priorities of rail line segments based on their deterioration. In this paper we present an evaluation method of rail line segment deterioration which can be used to distribute limited budget. Rail line facilities include rail track, crossing, road bed, bridge, tunnel. These facilities deterioration and line shape can affect line segment deterioration. Deterioration evaluation method we present is a weighted sum of each component deterioration scores. The component weight can be obtained from experts using analytic hierarchy process.

  • PDF

철도 시설 및 차량 분야 사고 발생에 따른 비상대응 설비 환경 분석 연구 (A Study on emergency equipments for accidents of rail infrastructure and rolling-stock)

  • 양도철;서영민
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1817-1823
    • /
    • 2007
  • In this study, we have studied rail infrastructure related to emergency action to manage the risk when emergency caused by faults of facility or rail vehicle during operation happens. Especially we have compared the effect of emergency action with examining the structure of vehicle, tunnel, bridge and access road, etc which are related to emergency action. Also, we have tried to analyze effects of radio and communication equipment, lifesaving and refuge which could be used for rolling stock, station, control room, tunnel, bridge and etc, and we have presented the way of reporting the emergency to the train driver or crew, control room, outside networks which could be used by passengers in vehicle, station, railroad line. Based on these, we have analyzed the conduct of emergency action in length of time when emergency happens in railway and high-speed railway, and studied the method of which passengers could be guided safely and escape from the scene of the accident.

  • PDF

한계해석법에 의한 파일-지반-터널 상호작용 해석 (Upper and Lower Bound Solutions for Pile-Soil-Tunnel Interaction)

  • 이용주;신종호
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.77-86
    • /
    • 2005
  • In urban areas, new tunnel construction work is often taking place adjacent to existing piled foundations. In this case, careful assessment for the pile-soil-tunnel interaction is required. However, research on this topic has not been much reported, and currently only limited information is available. In this study, the complex pile-soil-tunnel interaction is investigated using the upper and lower bound methods based on kinematically possible failure mechanism and statically admissible stress field respectively. It is believed that the limit theorem is useful in understanding the complicated interaction behaviour mechanism and applicable to the pile-soil-tunnel interaction problem. The results are compared with numerical analysis. The material deformation patterns and strain data from the FE output are shown to compare well with the equivalent physical model tests. Admissible stress fields and the failure mechanisms are presented and used to develop upper and lower bound solutions to assess minimum support pressures within the tunnel.

  • PDF

A Study on the Installation of a Barrier to Prevent Large-Scale Traffic Accidents in Tunnel

  • Baek, Se-Ryong;Yoon, Jun-Kyu;Lim, Jong-Han
    • International journal of advanced smart convergence
    • /
    • 제8권4호
    • /
    • pp.161-168
    • /
    • 2019
  • Traffic accidents in tunnel can lead to large traffic accidents due to narrow and dark road characteristics. Therefore, special care of the driver is required when is driving in a tunnel. However, accidents can happen at any time. In the event of an accident, a narrow road structure may lead to a second accident. Therefore, all facilities installed inside the tunnel should be allowed to minimize damage in the event of an accident. We confirmed the safety of the collision target through the action of the sedan, Sport Utility Vehicle (SUV) and truck when the vehicle crashed into a stairway installed on the tunnel emergency escape route, and when a concrete barrier or guard rail was installed in front of the stairway. The behavior of the vehicle has resulted in a total of three results: rollover or rollover, change of speed and angle of the vehicle after collision. The sedan and SUV were the most secure when colliding with the guardrail, but considering the truck as a whole, concrete barriers were judged to be the most suitable for minimizing damage from the first accident and reducing the risk of the second accident.

Computer modelling of fire consequences on road critical infrastructure - tunnels

  • Pribyl, Pavel;Pribyl, Ondrej;Michek, Jan
    • Structural Monitoring and Maintenance
    • /
    • 제5권3호
    • /
    • pp.363-377
    • /
    • 2018
  • The proper functioning of critical points on transport infrastructure is decisive for the entire network. Tunnels and bridges certainly belong to the critical points of the surface transport network, both road and rail. Risk management should be a holistic and dynamic process throughout the entire life cycle. However, the level of risk is usually determined only during the design stage mainly due to the fact that it is a time-consuming and costly process. This paper presents a simplified quantitative risk analysis method that can be used any time during the decades of a tunnel's lifetime and can estimate the changing risks on a continuous basis and thus uncover hidden safety threats. The presented method is a decision support system for tunnel managers designed to preserve or even increase tunnel safety. The CAPITA method is a deterministic scenario-oriented risk analysis approach for assessment of mortality risks in road tunnels in case of the most dangerous situation - a fire. It is implemented through an advanced risk analysis CAPITA SW. Both, the method as well as the resulting software were developed by the authors' team. Unlike existing analyzes requiring specialized microsimulation tools for traffic flow, smoke propagation and evacuation modeling, the CAPITA contains comprehensive database with the results of thousands of simulations performed in advance for various combinations of variables. This approach significantly simplifies the overall complexity and thus enhances the usability of the resulting risk analysis. Additionally, it provides the decision makers with holistic view by providing not only on the expected risk but also on the risk's sensitivity to different variables. This allows the tunnel manager or another decision maker to estimate the primary change of risk whenever traffic conditions in the tunnel change and to see the dependencies to particular input variables.

선로상 이물질 제거를 위한 자갈날림판 유동특성 연구 (Flow Characteristics of the Ballast Blower for the Prevention a Foreign Object Damage on the Rail Road)

  • 노주현;김덕영;구요천;윤수환;권혁빈;이동호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.414-419
    • /
    • 2006
  • The ballast or other objects may be located on the rail road by a lump of ice, repairing operation on the track, or the strong gust due to the high speed running of the train. When a train operated in this condition, it causes serious damages to the wheel, train, and structures near the track, or the secondary ballast flying. To remove these objects safely, a ballast blower is suggested which was attached under the train. Firstly, the numerical analyses are investigated to find out the basic flow characteristics of the ballast blower. Next, the performance of the ballast blower is verified by wind tunnel experiments. Through these studies, it is expected that the ballast blower can be applied practically.

  • PDF

터널시설물 점검진단 데이터의 텍스트마이닝 분석을 통한 유형별·지역별 중점 유지관리요소의 이해 (Understanding Facility Management on Tunnel through Text Mining of Precision Safety Diagnosis Data)

  • 서정은;오진탁
    • 한국공간구조학회논문집
    • /
    • 제21권3호
    • /
    • pp.85-92
    • /
    • 2021
  • The purpose of this paper is to understand the key factors for efficient maintenance of rapidly aging facilities. Therefore, the safety inspection/diagnosis reports accumulated in the unstructured data were collected and preprocessed. Then, the analysis was performed using a text mining analysis method. The derived vulnerabilities of tunnel facilities can be used as elements of inspections that take into account the characteristics of individual facilities during regular inspections and daily inspections in the short term. In addition, if detailed specification information and other inspection results(safety, durability, and ease of use) are used for analysis, it provides a stepping stone for supporting preemptive maintenance decision-making in the long term.

발파진동 제어에 의한 특수구간 터널굴착에 관한 연구 (A Study on Tunnel Excavation by Controlled Blast Vibration at Particular Environment Conditions)

  • 최형빈;임한욱
    • 산업기술연구
    • /
    • 제20권A호
    • /
    • pp.257-267
    • /
    • 2000
  • It was difficult to apply conventional excavation methods in some sections from Seoul to Pusan high speed rail road construction of 1 lot 2, due to highway concrete road, gas pipe, water pipe and nearby factories with automatic control system machine. To excavate safely and efficiently in these sections new blast patterns were employed within allowable blast vibration level, by test blast and controlled vibration by sequential blast. Behaviors of the rock mass including convergence and displacement around tunnel were measured with construction works and the crack width in concrete wall was also monitored for controlling allowable limits. The results can be summarized as follow : 1. The allowable blast vibration level in structure site is less 1.0cm/sec for highway concrete, 0.5 cm/sec for gas pipe, water pipe and building housing and 0.3 cm/sec for automatic control system machine. 2. The convergence displacement, single rod extensometer and multi rod extensometer around tunnel and cracks in concrete wall were measured, it was confirmed that the measured values were converged within allowable level. 3. The empirical formular of ground vibrations with 90% confidence lines for PD-3 was given as follow. $$V_{90%}=45.549({\frac{D}{\sqrt{W}}})^{-1.353}$$

  • PDF