• Title/Summary/Keyword: ROAD CONSTRUCTION

Search Result 2,080, Processing Time 0.026 seconds

A Case Study on Cut Slope Failure due to the Geomorphological Factor (지형요인에 의한 절토사면 붕괴사례)

  • Kim, Seung-Hyun;Choi, Ji-Yong;Rhee, Jong-Hyun;Lee, Jung-Yup;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1161-1170
    • /
    • 2009
  • The Roads in Gangwon Province generally was made on purpose to use the military road. In case of these roads, tremendous dangerous cut slopes do exist and its road linear shape was badly designed. In order to make up for this situation, the government has continuously established the new road or performed the public works such as the straight line of the curved road. Soksil 2 cut slope was made through the road improvement work. This has small surface failures and collapses. In spite of dry season, this slope are leaking lots of groundwater at the unbelievable point. So as to get curious phenomenon right, we performed a detailed field investigation, the geomorphological analysis, the stability analysis considering field characteristic and ultimately proposed the countermeasure to make sure stability of Sokil 2 cut slope.

  • PDF

Framework to Compute Vehicle Emission Costs Associated with Work Zones

  • Shrestha, K. Joseph;Adebiyi, Jeremiah;Uddin, Mohammad Moin;Sturgill, Roy
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.952-959
    • /
    • 2022
  • Active construction work zones will result in longer travel time and/or longer travel distances for road users because of reduced speed limits and/or detours. This results in increased fuel consumption and increased emissions of harmful gases such as Carbon Monoxide (CO), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx), which causes discomfort to the environment and road users around the work zone. The impact of such emissions should be considered while designing work zones or determining the number of days the roadway will be allowed to be closed partially or fully. This study develops a methodology to compute additional road user costs associated with such work zones. To achieve this goal, a) an extensive literature review is conducted, b) a framework to compute emission cost is developed, c) emission rates are computed for all counties (95) of the state of Tennessee, and d) a case study is conducted to demonstrate the use of the framework to estimate the additional impact of emission because of the work zone. For the case study conducted, the emission cost was computed to be $10,653.60 for the duration of the project. State DOTs can account for such road user costs while selecting contractors using A+B bidding. Accounting for such impact of emission will also indicate the agency's willingness to consider sustainability as a part of the business practices.

  • PDF

Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network (인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델)

  • Han, Hyeong Dong;Kim, Jeong Hwan;Yoon, Jung Ho;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.829-837
    • /
    • 2011
  • Construction cost estimation in planning phase which calculates the cost for performing construction tasks is used for various ways. Meanwhile, in the case of road construction, the existing cost estimating method in early phase based on numerical mean value of the past is not accurate to be used. This paper propose neural network model for estimating road construction cost in planning phase to solve the limit of current cost estimating method. The model was designed using past road construction bidding records, and variables of model were optimized through trial and error. The estimation result of the model was compared with regression analysis and government's standard and it was verified that the model is better in accuracy. It is expected that the proposed model will be used for road cost estimation in planning phase.

A Study for Reuse of Recycled Concrete (폐콘크리트 재활용 기술에 관한 연구)

  • 이진용;이인대
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.04a
    • /
    • pp.186-191
    • /
    • 1996
  • The recycled aggregate obtained from the recycled concrete may be used in road construction as crushed aggregate. The properties of recycled aggregate are reached to the values in accordance with specification for the subbase layer of the road construction. However, for the base layer of road construction, the mixtures of recycled aggregate and crushed aggregate have to be used in order to satisfy the specification. In the Batch Leaching Test the recycled aggregate has lower content of heavy matal and organic matter than those written in environmental pollution law. So it does not occur the environmental pollution.

  • PDF

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.

A Study on the Characteristic and Reinforcement of Road Cut Slope all over the HanGye Pass (한계령 일대 도로절토사면 특성과 보강방안 연구)

  • Rhee, Jong-Hyun;Kim, Seung-Hyun;Lee, Jung-Yup;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.676-680
    • /
    • 2006
  • Many collapse of road cut slope consisted of representative granite of korea peninsula is happened by weathering progress. Chose hangye pass consisted of korea peninsula's representative granite style for this study. Purpose of this study is that consider suitable reinforcement of cut slope consisted of granite by analyzing characteristic of hangye pass vicinity road cut slope.

  • PDF

A Study on Revising Construction Cost Calculation for Road Paving Maintenance Work (도로포장 유지보수 공사비산정기준 개정에 대한 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.155-156
    • /
    • 2020
  • Unlike new construction projects, road paving maintenance work shows large productivity discrepancies depending on the conditions of the worksite. The current construction cost calculation scheme, however, only provides daily construction volume categorized by work scope and scale: There are no detailed standards that can be implemented on various types of worksites. To develop standards that enable the calculation of appropriate construction costs by taking into account worksite conditions, the current study conducted on-site surveys and interviews. The on-site research and analysis revealed that location, construction width, the day's worksite lot, work scope, and construction objectives were found to cause differences in construction volume. In addition to the existing work scope and work scape variables, the current study added weight constants reflecting the daily work volume based on movement conditions at site and the size of the worksite lot. In this process, the current study found that even one type of construction project can have fifteen different levels of daily construction volume. Such detailed classification was deemed to enable the proper calculation of construction costs based on worksite conditions.

  • PDF

Evaluation of Bearing Capacity for Permeable Pavement using Geocell (지오셀을 이용한 투수성 포장의 지지력 평가)

  • Lee, Su-Hyung;Yoo, In-Kyoon;Lee, Dae-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.3
    • /
    • pp.11-17
    • /
    • 2012
  • This paper presents the results of investigation into bearing capacity of a geocell reinforced load base. In order to analyze variation of bearing capacity of the geocell reinforced road base comparing to without reinforced geocell road base, a series of full-scale tests were performed and measured using FWD (Falling Weight Deflectometer). The results indicate that bearing capacity of geocell (T=1.5 mm) reinforecd road base increase than the unreinforced road base.

Investigation of applicability for introducing green-road certification to domestic road (녹색도로인증제도의 국내 적용성 검토)

  • Lee, Du-Heon;Kim, Hyun-Woo;Park, Jae-Woo;Lee, Kyo-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.181-183
    • /
    • 2012
  • Recently, as part of an effort to realize the low-carbon green growth, the research to measure the degree of greening about the road facility with United States as its center was performed. In addition, the Green-road certification is enforced and applied. In this study, we would like to examine the applicability of the green-road certification to domestic road to promote the settlement of green-road certification system to contribute the related industry development for the green technology development and application and spread in the roads sector.

  • PDF