• Title/Summary/Keyword: ROAD

Search Result 12,731, Processing Time 0.04 seconds

A Study on the Volcanic Ash Damage Sector Selection based on the Analysis of Overseas Cases and Domestic Spatial Information (해외 사례 분석과 국내 공간정보 분석을 통한 화산재 피해 분야 선정)

  • Han, Hyeon-gyeong;Baek, Won-kyung;Jung, Hyung-sup;Kim, Miri;Lee, Moungjin
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.5_1
    • /
    • pp.751-761
    • /
    • 2019
  • Mt. Baekdu, Mt. Aso, Mt. Sakurajima, Mt. Kikai and etc are distributed around the Korean Peninsula. Recently signs of eruption of Mt. Baekdu are increasing, raising concerns over possible damage to volcanic ash from seasonal winds during the winter eruption. Therefore, detailed procedures for investigation and countermeasures for volcanic ash spread and damage are required. But the standards for the warning and alarm signal of volcanic ash presented by Korea Ministry of Government Legislation are vague, with "when damage is expected" and "when serious damage is expected". In this study, to analyze the damage threshold and to apply the cases of overseas damage to the country, a survey was conducted on the establishment of domestic spatial information by public institutions with public confidence. As a result of the investigation of damage from volcanic ash overseas, the details of the damage cases were different depending on the type of life or income sources of each country. Therefore, instead of applying the volcanic ash damage cases abroad in Korea, spatial information analysis was performed to reflect domestic social and natural characteristics. In addition, we selected the areas to be considered in the event of volcanic ash damage in Korea. Finally, domestic volcanic ash damages should be classified as health, residential, road, railroad, aviation, power, water, agriculture, livestock, forest, and soil. When establishing the volcanic ash alarm optimized for Korea in the future, overseas volcanic ash damage cases and domestic spatial information construction in this study will be helpful in policy establishment.

Benchmarking Highway Maintenance Practices for Standardized Guideline Development (도로공사 유지관리 표준화 절차 개발을 위한 벤치마킹)

  • Ha, Minhui;Kim, Donghee;Shin, Hochul;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.44-56
    • /
    • 2019
  • Recently, the paradigm of SOC investment has shifted from new construction to maintenance. This shift became more important for the highway system because it is as one of the most important SOC. In Korea, highway maintenance costs are about 20% of the total annual highway construction budget, which is about two-thirds of developed countries. In addition, establishing standardized guidelines for the highway maintenance operation is not in place. Therefore, in order for domestic road construction and maintenance technology to secure competitiveness in the global construction market, it is urgent to improve the management capacity for maintenance as well as the technology and management capacity. This study examines highway maintenance practices in OECD countries such as North America, Europe, Australia, New Zealand, and Japan to identify core elements of highway maintenance practice. It is imperative to establish a comprehensive management system based upon asset management principle. Even if the budget for the highway construction is reduced, investment in maintenance needs to be maintained.

Runoff Characteristics of Non-point Source Pollutants from Road Area During Rainfall Events (강우시 도로지역 비점오염물질 유출특성)

  • Park, Woon Ji;Lee, Su In;Lee, Hae Seung;Lee, Young Joon;Choi, Joong Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.403-403
    • /
    • 2015
  • 본 연구에서는 강우시 도로지역에서 발생하는 비점오염물질 유출 및 수질특성을 살펴보고자 도로지역(국도 46호선)을 대상으로 총 16회의 강우사상에 대해 분석하였다. 모니터링 기간(2014년 5월~9월)동안 연구대상지역에는 3.2~80.3 mm의 강우가 발생하였으며, 강우강도는 0.39~11.29 mm/hr의 범위로 나타났다. 선행무강우일수는 0.3~20.1일이며, 총 유출량은 0.1~6.8 ㎥, 유출율은 0.24~0.85(평균 0.6)의 범위로 나타났다. 강우 모니터링 결과, 유량가중평균농도(Event Mean Concentration, EMC)는 TOC 4.9~56.2 mg/L(평균 18.0 mg/L), BOD 3.1~21.5 mg/L(평균 7.5 mg/L), COD 6.7~58.6 mg/L(평균 23.6 mg/L), SS 2.1~281.9 mg/L(평균 59.4 mg/L), T-N 1.07~13.46 mg/L(평균 4.89 mg/L) 그리고 T-P 0.065~0.680 mg/L(평균 0.23 mg/L)의 범위로 나타났으며, 강우계급별로 살펴보면 0~10 mm일 때 BOD 9.3 mg/L, COD 30.5 mg/L, SS 84.1 mg/L, T-N 5.42 mg/L, T-P 0.27 mg/L로, 10~30 mm일 때 BOD 6.6 mg/L, COD 22.0 mg/L, SS 29.0 mg/L, T-N 4.9 mg/L, T-P 0.20 mg/L로, 50 mm 이상의 강우에서는 BOD 3.6 mg/L, COD 7.1 mg/L, SS 46.4 mg/L, T-N 3.42 mg/L, T-P 0.10 mg/L로 강우계급별 EMC는 대부분 수질항목에 있어 10 mm 이하 계급의 평균 EMC가 높은 수준으로 나타났다. 그리고 각 강우사상에 대한 단위면적당 오염부하는 TOC 0.06~3.5 kg/ha, $BOD_5$ 0.03~1.6 kg/ha, CODMn 0.09~4.74 kg/ha, SS 0.09~35.99 kg/ha, T-N 0.012~2.600 kg/ha, T-P 0.001~0.062 kg/ha의 범위로 산정되었다. 도로지역은 불투수층 면적비율이 높아 누적강우량 10 mm 이하에서도 유출이 발생하는 것으로 분석되었으며, 작은 강우에도 초기유출이 발생하고 유출되는 오염물질 농도가 높은 경향을 나타내었다.

  • PDF

A Study on Smoke Extract Vents in a Subway with Screen door by Evacuation Performance Evaluation through RSET vs. ASET based on Computer Simulations (스크린도어가 설치된 지하철 승강장의 대피안전성 평가를 통한 제연환기구의 방재성능 개선방안 연구)

  • Park, Hyung-Joo;Lee, Young-Jae;Shin, Dong-Cheol;Baek, Dong-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.511-519
    • /
    • 2007
  • This study provides comprehensive design improvements covering technical issues concerning life safety matter In case of fire train stoppage in the middle of a tunnel. Recently Government announced that most of subway platforms will have screen doors in 3 years. Therefore, many fire safety engineers considered that they may contribute on life safety on train stoppage in tunnel. Especially The screen door can protect platform from smoke along tunnel ceiling when fire train stopped in tunnel. The study showed that platform ventilation ducts and the a tunnel ventilation chimney in the middle of tunnel in exiting subway tunnel could not guarantee life safety ability in terms of RSET vs. ASET comparison. Furthermore during evacuation process many peoples may be threatened from the smoke spread from the origin of fire. Although only additional vertical route can be installed in tunnels In order to decrease RSET, it will costs high or no spaces remains in outside on the road. The study suggested that increase of ASET can be best solution without additional escape route, therefore alternative design methods suggested on the base of simulation results. Finally the study shows alternative methods can give good result in terms of evacuation performance evaluation. The evacuation performance evaluation helps the decision-maker to determine the preferred alternatives or upgrades to existing tunnel infrastructure and other measure to meet safety objectives. Finally, the study details the effectiveness of measures the can be taken to reduce the risk of incidents in subway tunnels.

Evaluation of SWMM Snow-melt Module to Secure Bi-Modal Tram Operation (바이모달 트램 운행 안전성 확보를 위한 SWMM 융설 모듈 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.441-448
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the show pack melt/freezing due to unexpected snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snow-fall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for know removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system prediction.

Optimal Landing Location and Skid Trail Network Selection in Timber Harvesting Area (목재수확작업지의 적정 집재장 선정 및 작업로 배치)

  • Ji, Byoung-Yun;Oh, Jae-Heun;Park, Sang-Jun;Hwang, Jin-Sung;Cha, Du-Song
    • Journal of Forest and Environmental Science
    • /
    • v.27 no.3
    • /
    • pp.195-203
    • /
    • 2011
  • Forest in the our country is in the age that needs positive operation in order to foster economical forest. Multiple operations for making valuable forest should be conducted steadily and timely from afforestation to harvesting. In order to execute these kinds of forest operations, the construction of skid trail network that can be effectively used as a pathway for forestry machine and working space is necessary. To investigate facility effect of skid trail network, we executed the location of skid trail network through centroid method by GIS for 50ha of harvesting workplace in mechanized model forest located in Hongcheon, Gangwon Province. As a result of this research, skid trail density in this area changed from 79m/ha with current method to 42m/ha with improved method. It appeared that skid trail density with improved method is nearly half of current method even though the cutting area is the same as the current cutting area. Also, skidding distance changed from 117m with current method to 57m with improved method. It appears that skidding distance with improved method is nearly half of current method even though cutting area was enlarged in adjacent tending cutting area.

Pillar stability in very near-twin tunnels (초근접 병설터널의 필라 안정성 확보)

  • Kim, Donggyou;Koh, Sungyil;Lee, Jeongyong;Lee, Chulhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.699-714
    • /
    • 2022
  • The objective of this study is to suggest a safe and economical pillar reinforcement method when very near-twin tunnels with a minimum interval of 1 m passes through a soft zone such as weathered soil or weathered rock. A standard cross-sectional view of a two-lane road tunnel was applied to suggest a pillar reinforcement method for the very near-twin tunnels. The thickness of the pillar was 1 m. The ground condition around the tunnel was weathered soil or weathered rock. There were four reinforcement methods for pillar stability evaluation. These were rock bolt reinforcement, pre-stressed steel strand reinforcement, horizontal steel pipe grouting reinforcement, horizontal steel pipe grouting + prestressed steel strand reinforcement. When the ground condition was weathered soil, only the pillar reinforced the horizontal steel pipe grouting + prestressed steel strand did not failed. When the ground condition was weathered rock, there were no failure of the pillar reinforced the horizontal steel pipe grouting or the horizontal steel pipe grouting + prestressed steel strand. It is considered that the horizontal steel pipe grouting reinforcement played a role in increasing the stability of the upper part of the pillar by supporting the upper load applied to the upper part of the pillar.

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

Seismic Fragility Evaluation of Inverted T-type Wall with a Backfill Slope Considering Site Conditions (사면 경사도가 있는 뒷채움토와 지반특성을 고려한 역T형 옹벽의 지진시 취약도 평가)

  • Seo, Hwanwoo;Kim, Byungmin;Park, Duhee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.533-541
    • /
    • 2021
  • Retaining walls have been used to prevent slope failure through resistance of earth pressure in railway, road, nuclear power plant, dam, and river infrastructure. To calculate dynamic earth pressure and determine the characteristics for seismic behavior, many researchers have analyzed the nonlinear response of ground and structure based on various numerical analyses (FLAC, PLAXIS, ABAQUS etc). In addition, seismic fragility evaluation is performed to ensure safety against earthquakes for structures. In this study, we used the FLAC2D program to understand the seismic response of the inverted T-type wall with a backfill slope, and evaluated seismic fragility based on relative horizontal displacements of the wall. Nonlinear site response analysis was performed for each site (S2 and S4) using the seven ground motions to calculate various seismic loadings reflecting site characteristics. The numerical model was validated based on other numerical models, experiment results, and generalized formula for dynamic active earth pressure. We also determined the damage state and damage index based on the height of retaining wall, and developed the seismic fragility curves. The damage probabilities of the retaining wall for the S4 site were computed to be larger than those for the S2 site.

Study on the Piezoelectric Energy Harvesting Technology for the Energy Conversion of Vibration in Automobiles (자동차 진동 에너지 변환을 위한 압전 에너지 하베스팅에 관한 연구)

  • Lee, Hyeon Yeong;Kim, Kwangwon;Ye, Jiwon;Woo, Suhyeon;Lee, Geon;Lee, Seungah;Jeong, Seong Rok;Jeong, Seon Hye;Kim, Ho Seong;Nam, Ga Hyeon;Jo, Yun Yeong;Choi, Han Seung;Ryu, Jungho
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.34 no.6
    • /
    • pp.495-504
    • /
    • 2021
  • Energy Harvesting is a technology that can convert wasted energy such as vibration, heat, light, electromagnetic energy, etc. into usable electrical energy. Among them, vibration-based piezoelectric energy harvesting (PEH) has high energy conversion efficiency with a small volume; thus, it is expected to be used in various autonomous powering devices, such as implantable medical devices, wearable devices, and energy harvesting from road or automobiles. In this study, wasted vibration energy in an automobile is converted into electrical energy by high-power piezoelectric materials, and the generated electrical energy is found to be an auxiliary power source for the operation of wireless sensor nodes, LEDs, etc. inside an automobile. In order to properly install the PEH in an automobile, vibration characteristics includes frequency and amplitude at several positions in the automobile is monitored initially and the cantilever structured PEH was designed accordingly. The harvesting properties of fabricated PEH is characterized and installed into the engine part of the automobile, where the vibration amplitude is stable and strong. The feasibility of PEH is confirmed by operating electric components (LEDs) that can be used in practice.