• 제목/요약/키워드: RCM(Reliability Centered Maintenance)

검색결과 79건 처리시간 0.033초

공항철도 궤도회로장치에 대한 RCM 적용 방안 (An applicable RCM method for Track circuit equipment of AREX's Signalling System)

  • 송미옥;임성수;이창환;박승근
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1126-1131
    • /
    • 2008
  • In this paper we introduce an applicable RCM(Reliability centered maintenance) method for Track circuit equipment of AREX's Signalling System. AREX computerize all the process of FRACAS(Failure Reporting, Analysis and Corrective Action System)) by the Facility Management System of Integrated Information System. These datum were analysed and reproduced as the RAMS index value which can be used by maintenance staff for optimizing the maintenance method of the System.

  • PDF

확률론적 FMECA를 이용한 발전설비의 신뢰도 기반 유지보수계획 수립 (Reliability-Centered Maintenance of Generating Unit Using Stochastic FMECA)

  • 주재명;김동민;변용태;김형철;김진오
    • 조명전기설비학회논문지
    • /
    • 제22권1호
    • /
    • pp.58-65
    • /
    • 2008
  • 본 논문은 신뢰도 기반 유지보수(RCM : Reliability-Centered Maintenance) 계획에 의한 발전설비의 유지보수주기를 평가하고 있다. 유지보수주기는 발전설비의 안정성 및 비용을 결정하기 위한 기준으로 활용된다. 본 논문에서는 설비 수명평가를 통해 확률분포를 이용한 확률론적 FMECA(Failure Mode, Effects and Criticality Analysis)에 대해 논하고, 국내 발전 설비 중 비교적 평균수명이 짧은 복합화력 발전소를 선정하여 유지보수 주기를 평가하였다. 발전소 유지보수 평가는 향후 구조 개편된 전력시장에서 유지보수계획 수립 방법의 유용한 지표로 활용 가능할 것이다.

각 컴포넌트 유지보수 주기를 고려한 풍력발전 설비의 유지보수 계획에 관한 연구 (A Study on the Maintenance Plan Considering Maintenance Cycle of Wind Turbine Component)

  • 이윤성;신준현;김진오
    • 조명전기설비학회논문지
    • /
    • 제27권5호
    • /
    • pp.39-45
    • /
    • 2013
  • Wind power is one of the fastest growing renewable energy sources. In these days, wind turbine shifts from onshore to offshore because the offshore wind farm has a abundant wind resource. However, offshore wind turbine is not easy to access, it has a long downtime when the failures of the wind turbine component occur. Therefore, the appropriate wind turbine maintenance plan is required to meet the economic and reliability of the components. This paper proposes the maintenance planning method based on the RCM(Reliability Centered Maintenance) to determine an economical maintenance cycle to satisfy the appropriate reliability of the wind turbine components. In order to compare the proposed method with the conventional RCM method, critical components are selected in the case study because they have a long downtime and a large amount of total cost.

Markov State Model을 이용한 복합화력 발전설비의 최적의 유지보수계획 수립 (Application Markov State Model for the RCM of Combustion Turbine Generating Unit)

  • 이승혁;신준석;김진오
    • 전기학회논문지
    • /
    • 제56권2호
    • /
    • pp.248-253
    • /
    • 2007
  • Traditional time based preventive maintenance is used to constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is scheduled by RCM(Reliability-Centered Maintenance) evaluation. So, Markov state model is utilized considering stochastic state in RCM. In this paper, a Markov state model which can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by a Markov model. In case study, simulation results about RCM are used to the real historical data of combustion turbine generating units in Korean power systems.

복합화력발전기의 신뢰도 기반 유지보수를 위한 확률론적 FMECA 평가 (Stochastic FMECA Assessment for Optimal RCM of Combustion-Turbine Generating Unit)

  • 주재명;이승혁;신준석;김진오
    • 전기학회논문지
    • /
    • 제56권2호
    • /
    • pp.254-259
    • /
    • 2007
  • PM(Preventive Maintenance) can avail the generating unit to reduce cost and gain more profit in a competitive supply-side power market. So, it is necessary to perform reliability analysis on the power systems in which reliability is essential. Thus, to schedule optimal PM planning based on reliability that is defined RCM(Reliability-Centered Maintenance), FMECA(Failure Mode Effects and Criticality Analysis) assessment is very important. Therefore, in this paper, the procedure of FMECA assessment for optimal RCM is proposed by probabilistic approach using real historical failure data of combustion-turbine generators in Korean power systems. The stochastic FMECA is performed based on the effects of probable failure modes of combustion-turbine generating unit.

RCM을 적용한 유지보수 시스템 구축에 관한 연구 (A Study to the Plan for Development of Maintenance applied RCM)

  • 오안섭;이헌일;신국호;신건영;장성태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.907-914
    • /
    • 2011
  • It has used for Rolling Stock Maintenance a number of maintenance system applied RCM in Railway(Korea Railroad Corporation, Seoul Metro, Korail Airport Railroad Corporation, etc) so far. Some institutions has been using develop Computational System including reliability process. A majority of the system has computerized maintenance work, but it is shown that developed focus on administrator and developer not user. SMRT(Seoul Metropolitan Rapid Transit Corporation) has developed computational system for maintenance in the '90s and saved many data about Maintenance Historical Data. However, this system reached the limits application of this data. Maintenance of computer systems is managed directly by the field staff and to introduce Reliability-centered maintenance SMRT was continually reviewed system development trends and supplement the existing system. To successfully operate RCM program should be gained full support in the whole company and field communicate, secure a reliable data from field and the most important take a patience. Our corporation will operate and develop successful RCM thorough review of these problems in the future.

  • PDF

RCM 수립을 위해 발전설비의 고장확률을 고려한 확률론적 FMECA 평가 기법 (Application of FMECA with Stochastic Approach to Reliability-Centered Maintenance of Electric Power Plants in Korean Power Systems)

  • 주재명;이승혁;김진오;이효상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.196-197
    • /
    • 2006
  • Preventive maintenance can avail the generation utilities to reduce cost and gain more profit in a competitive supply-side power market. So, it is necessary to perform reliability analysis on the systems in which reliability is essential. In this paper, RCM (Reliability -Centered Maintenance) analytical method is adopted using real historical failure data in Korean power plants. Therefore, the reliability -based Probability model for predicting the failures of components in the power plant is also established, and application to FMECA(Failure Mode Effects and Critical Analysis) consideration of failure probability, Based on the weighting ranking of generating equipments which status to be probability estimation by FMECA. The FMECA is an engineering analysis and a core activity performed by reliability engineers to review the effects of probable failure modes of generating equipments and assemblies of the power system on system performance. The results of this paper show that application of FMECA with stochastic approach to the preventive maintenance can efficiently avail decreasing the cost on maintenance and hence improve the total benefit.

  • PDF

비용을 고려한 발전설비의 예방유지보수 계획 수립 (Establishment of Preventive Maintenance Planning for Generation Facility Considering Cost)

  • 김형준;신준석;김진오;김형철
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 춘계학술대회 논문집
    • /
    • pp.328-333
    • /
    • 2007
  • Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for tm based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(Reliability-Centered Maintenance) evaluation. The main objective of RCM is to reduce the maintenance cost, by focusing on the most important functions of the system and avoiding or removing maintenance actions that are not strictly necessary. So, Markov state model is utilized considering stochastic state in RCM In this paper, a Markov state model much can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by the stepwise Markov model in detail. Also, because the system is not continuously monitored, the inspection is considered. In case study, simulation results about RCM will be shown using the real historical data of combustion turbine generating unit in Korean power systems.

  • PDF

Markov State Model을 이용한 복합화력 발전설비의 최적의 유지보수계획 수립 (Application Markov State Model for the RCM of Combustion turbine Generating Unit)

  • 신준석;이승혁;김진오
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.357-359
    • /
    • 2006
  • Traditional time based preventive maintenance is used to constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is scheduled by RCM(Reliability-Centered Maintenance) evaluation. So, Markov state model is utilized considering stochastic state in RCM. In this paper, a Markov state model which can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by a Markov model. In case study, simulation results about RCM are used to the real historical data of combustion turbine generating units in Korean power systems.

  • PDF

VVVF 도시철도 차량의 신뢰성 평가 시스템 개발에 관한 연구 (A Study on Development of the Reliability Evaluation System for VVVF Urban Transit)

  • 배철호;김성빈;이호용;장석화;서명원
    • 한국자동차공학회논문집
    • /
    • 제13권5호
    • /
    • pp.7-18
    • /
    • 2005
  • Over the past twenty years, the maintenance system has been developed and its importance has been increased. For the effective maintenance of the urban transit, we have developed the maintenance system based on the concept of RCM(Reliability Centered Maintenance). RCM analysis is a systematic approach to developing a cost-effective maintenance strategy based on the various components's reliability of the system in question. It is performed according to process that includes the following steps; definition of function and functional failures of the systems, construction of RB D(Reliability Block Diagram), performance of FMEA(Failure Modes & Effects Analysis) and calculation of the reliability index. The final process of RCM is to determine appropriate failure maintenance strategies. This paper aims to define the procedure of maintenace based on the concept of RCM for urban transit. The key for a successful maintenance system is an automated scheduling to the maximum extent possible and timely executions. The developed system issues maintenance plan and repair request based on analyzed data and maintenance experience.