TOWARDS A RELATIONAL CONTRACTING FRAMEWORK IN THE AUSTRALIAN CONSTRUCTION INDUSTRY: AN INITIAL FRAMEWORK

  • Melissa Chan;Bambang Trigunarsyah;Vaughan Coffey
    • International conference on construction engineering and project management
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.117-123
    • /
    • 2011
  • The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

  • PDF

Infection and Mutation - On the H. P. Lovecraft's fiction and "Project LC. RC" (감염과 변이 -H. P. 러브크래프트의 소설과 『Project LC. RC』에 대하여)

  • Bok, Do-Hoon
    • Journal of Popular Narrative
    • /
    • 제27권2호
    • /
    • pp.13-44
    • /
    • 2021
  • This article describes the fear of infection through the Covid19 pandemic and the rapid phase change of human species with H. P. Lovecraft's fiction and "Project LC. RC". Pandemic and climate change, which can be called global weirding, fundamentally question the status and history of human species in the ecosystem. The horror creature and cosmological indifferentism in Lovecraft's weird fiction are contemporary in that they help shed light on today's global weirding. But Lovecraft's racism allows him to ask more fundamental questions about the logjam of his cosmic horror. "Project LC. RC" are a Korean writers's works of cultural variation that rewrites controversial racism and misogyny in Lovecraft's fiction. Such variation becomes the task of creating a mutation in Lovecraft as it becomes infected with the affection of Lovecraft's writing. This article first noted the creative power of Lovecraft's fiction that induces such a mutation. And under this premise, this article wanted to reveal the meaning of Lee Seo young, Eun rim, and Kim Bo young's recreates of Lovecraft's fiction through the analysis of images and motifs of abject, plant creature and symbiosis. Specifically, Lovecraft's creature, which evokes phallic fear, turns into an image of an abject embracing and comforting women's despair("I Want You to Stay Low"), a plant creature that provides women with refuge("Color in the Well"), and a creature of care and symbiotic life("A Sea of Plague"). This recreate/rewriting has contemporary significance in that it embodies values such as labor, care, and solidarity in their works. The conclusion noted another power of creative variation in Lovecraft's fiction, which is not reduced to recreate/rewriting.

The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge (RC라멘교의 기본설계단계 개략공사비 산정모델)

  • Kim, Byung-Soo;Kwon, Suk-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • 제10권2호
    • /
    • pp.111-120
    • /
    • 2009
  • The conceptual cost estimation used the construction project needs for confirm budget not only at the planning phase but also at the preliminary design phase of the construction project. Present, the conceptual cost estimation model have problems the rate of error is very large because the linear simple model calculate by use the cost of the unit meter or the unit square. This study development the model used grouping and the key quantity method, the mixed unit cost for solve problem of the very large rate of error. The result of this study reduced difference of between the real design construction cost therefor it expect that contribute to the client or the service company estimate budget of RC rahmen bridge.

Assessment of structural behavior of reinforced concrete slab ceiling under full load test in a residential complex project

  • Jaffar A. Kadim;Oday A. Abdulrazzaq;Abdulamir A. Karim;Aqeel H. Chkheiwer
    • Structural Engineering and Mechanics
    • /
    • 제89권6호
    • /
    • pp.627-634
    • /
    • 2024
  • This research deals with the process of conducting a reinforced concrete slab loading test of a Residential Complex Project at the Shatt Al Arab District which is located in southern Iraq. The purpose of the test which represents a destructive test is to evaluate the structural behavior of the slab condition state during and after the examination of the test process in order to ascertain the ability of the slab ceiling to withstand the loads generated during the use of the building. The test was carried out accordant to ACI 437.2-13 code. The reason for this test is the postponed 8 years of building project construction. Concrete blocks were used to simulate and conduct a loading test of 30-tons for 3 days. The central point has been installed to measure the slab deflection that occurred during the test. The results showed that both the total deflection and residual deflections were lesser than the permissible values according to the ACI 437.2-13, the RC slab behavior was mainly linear structural behave, and that the purpose of the examination was achieved. Finally, a new method was introduced to the assessment of the slab condition at the support which is found in good condition.

Design and Verification of Dynamically Reconfigurable DES (동적 재구성가능 DES의 설계 및 검증)

  • 안민희;양세양;윤재근
    • Journal of KIISE:Computing Practices and Letters
    • /
    • 제9권5호
    • /
    • pp.560-566
    • /
    • 2003
  • Recently, many researches on RC(Reconfigurable Computing) with highly complex FPGA's and reconfigurable processors have been reported, and even some attempts for commercialization have been successful. In this paper, we introduce the design methodology for implementing DES crypto algorithm on small-capacity FPGA by using its dynamic reconfigurability and a system-level verification technique. Throughout this design project, we could evaluate the effectiveness of this approach, which is the dynamic reconfigurability of FPGAs makes the efficient trade-off between the performance and the cost robustly viable.

Comparative assessment of seismic rehabilitation techniques on a full scale 3-story RC moment frame structure

  • Di Ludovico, M.;Balsamo, A.;Prota, A.;Manfredi, G.
    • Structural Engineering and Mechanics
    • /
    • 제28권6호
    • /
    • pp.727-747
    • /
    • 2008
  • In the framework of the SPEAR (Seismic PErformance Assessment and Rehabilitation) research Project, an under-designed three storey RC frame structure, designed to sustain only gravity loads, was subjected, in three different configurations 'as-built', Fiber Reinforced Polymer (FRP) retrofitted and rehabilitated by reinforced concrete (RC) jacketing, to a series of bi-directional pseudodynamic (PsD) tests under different values of peak ground acceleration (PGA) (from a minimum of 0.20g to a maximum of 0.30g). The seismic deficiencies exhibited by the 'as-built' structure after the test at PGA level of 0.20g were confirmed by a post - test assessment of the structural seismic capacity performed by a nonlinear static pushover analysis implemented on the structure lumped plasticity model. To improve the seismic performance of the 'as-built' structure', two rehabilitation interventions by using either FRP laminates or RC jacketing were designed. Assumptions for the analytical modeling, design criteria and calculation procedures along with local and global intervention measures and their installation details are herein presented and discussed. Nonlinear static pushover analyses for the assessment of the theoretical seismic capacity of the structure in each retrofitted configuration were performed and compared with the experimental outcomes.

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • 제9권1호
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF