Risk-Based Inspection(RBI) Technology for Safety Management of the Pressurized Facilities (압력설비의 안전관리를 위한 위험기반검사(RBI) 기술)

  • Lee, Hern-Chang;Han, Seong-Hwan;Cho, Ji-Hoon;Kim, Tae-Ok
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.4
    • /
    • pp.1-6
    • /
    • 2011
  • Risk-based inspection (RBI) is a inspection technique suggesting inspection plan, such as inspection interval and inspection method, of the pressurized facilities based on its risk in the petrochemical, refinery and gas industries. Therefore, we can intensively and cost-effectively maintain, repair and manage the high-risk facilities through RBI technology. This paper reviews RBI technology, such as principle and implemental procedure of RBI, management of risks and facilities and return of investment through RBI, RBI technology at present and its application in domestic industries. In addition, some improvement directions of RBI are also proposed.

Development of Risk Based Inspection (RBI) Procedures for Optimized Preventive Maintenance (PM) Planning of Energy Plants (에너지플랜트의 최적 예방점검을 위한 위험도기반 설비 관리(RBI) 절차 개발)

  • Choi, Jeong-Woo;Yoon, Kee-Bong
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.1
    • /
    • pp.74-80
    • /
    • 2011
  • Recently, needs for extending remaining life and integrity of the aged energy plants are increased since the most domestic plants have been operated over 10 years. This need makes RAM (reliability, availability and maintainability) of the plant become more significant. RBI (risk based inspection) is main technology to increase RAM in energy plants. So far RBI has been developed mainly in the field of process plants (chemical/refinery), underground buried pipelines or nuclear power plants. However, the existing RBI procedure is limited mainly to process plants, it need to be extended to the other energy plants such as fossil power plants. In this study, a general RBI procedure for optimized PM (preventive maintenance) is proposed for various energy plants.

A Study on Surveying Functions of RBI Software (RBI 소프트웨어의 기능에 관한 조사연구)

  • Song J S;Shim S H;No W H;Park J H;Choi S C;Kwon J R;Kim J Y;Yoon K B
    • Journal of the Korean Institute of Gas
    • /
    • v.5 no.4 s.16
    • /
    • pp.56-61
    • /
    • 2001
  • Recently RBI softwares have received widespread interests from various industries. The available RBI softwares have variety of levels of analysis, fields of applications and damage mechanisms considered, which depend on the software developing institutes. In this paper results of a GSP(Group Sponsored Project) entitled 'Study on Surveying Functions of Foreign RBI Softwares' are summarized. A part of the study is explained in detail as a sample case for showing the contents of the project. Based on the demo softwares as well as the open documents and contents obtained in the web pages of the developer critical comparisons of the well-known RBI softwares were made. The required functions of the optimal RBI software is also discussed from the review results of this study.

  • PDF

Development of Implemental Procedure for K-Risk Based Inspection (한국형 위험기반검사(K-RBI)의 절차 개발)

  • Lee, Hern-Chang;Shin, Pyong-Sik;Lim, Dae-Sik;Kim, Tae-Ok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.3 s.75
    • /
    • pp.31-37
    • /
    • 2006
  • To apply easily the K-RBI program in domestic industries, an implemental procedure for K-RBI program was prepared. The K-RBI program had been developed, based on API-581 BRD. Therefore, through the usage of the developed K-RBI program and the implemental procedure, industries would have a benefit from reduced costs by modifying a frequency of an inspection efficiently. Also, the reliability of facilities would be maximized through improvement of an inspection method for facilities, considering its risk.

Application of Risk-Based Inspection with Financial Risk for a Petrochemical Process (석유화학공정에서 재정적 위험도에 의한 위험기반검사의 적용)

  • Kim, Tae-Ok;Lee, Joong-Hee;Choi, Sung-Kyu;Lee, Hern-Chang;Jo, Ji-Hoon
    • Journal of the Korean Institute of Gas
    • /
    • v.13 no.4
    • /
    • pp.53-60
    • /
    • 2009
  • For the case of the facilities using utilities such as cooling water and steam, risk of the facilities is zero because the consequence of failure (COF) through equipment damage area is zero. Therefore, to improve the estimation method of the risk by COF through equipment damage area in the risk-based inspection (RBI), this study developed the procedures of RBI, in which the risk was estimated by COF through financial loss. And, the RBI program (KS-RBI Ver 3.1) was developed to establish inspection interval based on the risk of the facilities estimated by COF through equipment damage area and financial loss, simultaneously, and the developed RBI program was applied to a petrochemical process. As a result, risks of the facilities estimated by COF through financial loss were similar to risks by COF through the equipment damage area. But, for the case of the facilities using utilities or expensive facilities, the estimation method of the risk by COF through financial loss was more accurate than through equipment damage area.

  • PDF

Development of Program for Qualitative Risk Based Inspection (RBI) using API-581 (API-581에 의한 정성적 위험기반검사(RBI) 프로그램 개발)

  • 이헌창;유준;김환주;김태옥
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.1
    • /
    • pp.49-60
    • /
    • 2004
  • Industrial facilities are becoming more complex and various with rapidly developing technologies. A number of installations and equipments are increased to improve productivity, and they are operated under the condition of high temperature and pressure. They are continuously repaired, replaced or abolished because of the deterioration with time, but their repair and replacement are not easy for economical and environmental concerns. If possible, the deteriorating equipments should be inspected and repaired effectively considering the state of maintenance and preservation, economic efficiency, and safety. That's where RBI(Risk Based Inspection) fits in. Even if RBI technology has been known among specialists, there were no tools readily available and it was hard to practice and apply RBI in industrial inspection and safety management. In the development of the qualitative RBI, the overall algorithm adopted API-581 BRD. The qualitative RBI program was developed to search the appling process.

Development of Program for K-RBI (한국형 위험기반검사(K-RBI) 프로그램 개발)

  • Kwon, Hyuck-Myun;Yim, Dae-Sik
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.30 no.1 s.244
    • /
    • pp.90-96
    • /
    • 2006
  • Since Risk Based Inspection(RBI) was introduced to quality the risks for jet engine and nuclear power, the technique has been expanded to the area of petrochemical plant. Recently among USA and Europe, window-based computer programme for RBI has been rapidly developed. When local companies procure such program to apply to their plants, it is difficult to build up a proper database as well as expect a good result. In this regards, K-RBI programme accustomed to Korean environments was developed. After completion of the programme in 2004, it was tested by 2 local petrochemical plants and was produced fruitful results. By using these programme, we are expecting accident prevention through risk based planning and implementing of equipment inspection, and saving dollars caused by procuring foreign expensive programme.

A Study on the Safety Enhancement of Chemical Plants Using Risk Based Inspection Method (Risk Based Inspection 기법을 이용한 화학공장의 안전성 향상에 관한 연구)

  • 노용해;유진환;서재민;임차순;고재욱
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.73-80
    • /
    • 2002
  • The RBI technique proposed by API is composed of three steps. The qualitative RBI method can be used for the purpose of screening the components with high risk. And the quantitative RBI method employs complex risk evaluation model for predicting component risk in a quantitative manner. The inspection program can be optimized based on the results obtained by these RBI technique. The forementioned RBI technique has been applied to a common hydrodesulfurizer unit and the technique is critically evaluated for studying its benefits and limitations, which is the main issue of this thesis. It's conducted that the RBI method can provide a method for defining and measuring the component risk, and also provide a powerful tool for managing many of the important elements of a process plant.

Development of a RBI Procedure and Implementation of a Software Based on API Code (I) - Qualitative Approach (API기준에 근거한 RBI 절차 개발 및 소프트웨어의 구현 (I) 정성적 접근법)

  • 심상훈;송정수;김지윤;윤기봉
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.66-72
    • /
    • 2002
  • During the last ten years, effort has been made for reducing maintenance cost for aged equipments and ensuring safety, efficiency and profitability of petrochemical and refinery plants. Hence, it was required to develop advanced methods which meet this need. RBI(Risk Based Inspection) methodology is one of the most promising technology satisfying the requirements in the field of integrity management. In this study, a qualitative assessment algorithm for RBI based on the API 581 code was reconstructed for developing an RBI software. The user-friendly realRBI software is developed with a module for evaluating qualitative risk category using the potential consequence factor and the likelihood factor.

Development of RBI Procedures and Implementation of a Software Based on API Code (III) - Quantitative Approach (API 기준에 근거한 RBI 절차 개발 및 소프트웨어의 구현 (III) - 정량적 접근법 -)

  • 송정수;심상훈;최송천;윤기봉
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.1
    • /
    • pp.56-63
    • /
    • 2003
  • During the last decade, effort has been made f3r reducing maintenance cost for aged equipments and ensuring safety, efficiency and profitability of petrochemical and refinery plants. Hence, it was required to develop advanced methods which meet this need. RBI(Risk Based Inspection) methodology is one of the most promising technology satisfying the requirements in the field of integrity management. In this study, a quantitative assessment algorithm fir RBI based on the API 581 code was reconstructed for developing an RBI software. The user-friendly realRBI software is developed with a module for evaluating quantitative risk md financial risk using the potential consequence and the likelihood. Also, inspection planning module for inspection time and inspection method are included in it.