• Title/Summary/Keyword: R&D Project Management

Search Result 419, Processing Time 0.033 seconds

The Effects of R&D Process Maturity on Product Development Performance: Focused on Mediating Effect of R&D Project Performance (R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향: R&D 프로젝트 성과의 매개효과를 중심으로)

  • Shin, Kyung Sic;Oh, Min Jeong;Kim, Won Ki;Park, So Hyun
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.7 no.7
    • /
    • pp.165-174
    • /
    • 2018
  • The purpose of this study is to verify the effects of R&D process maturity on product development performance and to verify whether R&D project performance mediating effect. The questionnaire was collected and analyzed to 131 persons related to the R&D work in 55 companies and public institutions performing R&D work. The results of this study are as follows, the effect of R&D process maturity on product development performance and mediating effect of R&D project performance were analyzed by simple and multiple regression analysis. Regression analysis was analyzed by SPSS statistical program. The higher the maturity level of the R&D process, the higher the product development performance and the R&D project performance, and the R&D project performance is partially mediated. It is concluded that it is important to establish and operate a systematic R&D process and to develop a project management methodology suitable for the characteristics of a company in order to improve product development performance. It is expected that if this study are utilized as practical R&D management methodology in corporate management, it will contribute to improvement of company product performance.

A Quality Management Model Contingent to R&D Characteristics (연구개발 특성을 고려한 품질경영 모형)

  • Yoon, JaeWook
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.43 no.2
    • /
    • pp.90-99
    • /
    • 2017
  • As the importance of R&D has increased, there have been various efforts to apply the quality management principles and tools to R&D activities in order to manage them effectively. The R&D sector differs from other value chains, so it may be difficult to apply quality management without proper considerations of R&D characteristics. This study describes the characteristics of R&D as high uncertainty and risk, diversity of R&D types, project-based activities, importance of strategic goals and business models, and importance of intangible assets. Three well accepted R&D quality management models are reviewed and implications for quality management and R&D characteristics are summarized. Based on these findings, the management targets of R&D quality management are classified into management level (organization, project) and management focus (process, output), and the contexts of R&D quality management are classified into R&D type (research, development) and market/customer requirement clarity (fluid, specific), and appropriate R&D quality management activities in each situations have been suggested.

Project Team Leader's Roles and Team Performance (프로젝트 팀 리더의 역할과 팀성과)

  • 김영배;차종석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.19 no.1
    • /
    • pp.123-144
    • /
    • 1994
  • This Study has empirically examined the relationship between the role of R & D project leaders and their team performance using data from 87 project teams in 6 R & d organizations. The results reveal that : 1) R & D project leaders play five different roles for performing their jobs-strategic plannar, team builder, gatekeeper, expert and champion : 2) all but the champion role of leaders are positively associated with project team performance unless they have too short team tenure to materialize their role efforts : 3) However, the relationship between the role of leaders and project team performance varies according to characteristics of their team and project tasks. More specifically, it becomes more important for leaders to focus on gatekeeping and championing roles as their team gats older. Team building role of leaders is more important for higher performance of relatively certain R & D projects, while for uncertain R & D projects gatekeeping role appears to be more important.

  • PDF

The study of EPC System S/W based on the UI (EPC시스템에서 UI기반의 소프트웨어에 대한 고찰)

  • Hwang, Seong Ha;Yoo, Sun Il;Jeong, Jin Su
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.6 no.1
    • /
    • pp.61-68
    • /
    • 2010
  • Generally EPC management system was simply management concept through the normal S/W. Our LNG Plant R&D Center wanted to the excellent management system from the S/W. So We developed the R&D management S/W and EPC management S/W Built in the Microsoft Project Server. Our system made to the customer Requirements. It was just User Interface protocol. But User Interface has more Weak position, because it makes from the MS Project Servers. Ms Projector server make easy to treat the project on the WBS. EPC parts mixed WBS and normally Ms SQL Database. It has very complicated Structures. Now We planed to make the general Database and Ms Project Server, It' means to the S/W Developer and Schedule Manager ability. We will successfully integrate R&D management system and EPC system and other softwares.

  • PDF

Integrated design system for supporting product development process ($ezDesign^{(R)}$ System) (제품개발 프로세스를 지원하는 통합설계환경)

  • Lee, Sang-Bong;Kim, Su-Ok;Hong, Tae-Hwa
    • Proceedings of the KSME Conference
    • /
    • 2001.06c
    • /
    • pp.357-360
    • /
    • 2001
  • Design Engineering Group, LG Production engineering Research Center has been developing The Integrated Design Environment enabling engineering design task with ease, speedy and accurate for several years targeting the design departments in LG Electronics. $ezDesign^{(R)}$ System is consisted by Engineering Database Management, Engineering Knowledge Management, 3D Design Application, Design Evaluation Method and Project Management. Engineering Database Management manage the design information effectively. Engineering Knowledge Management takes control of design knowledge from design engineering activity systematically. It is possible for the engineering designer to utilized 3D CAD easily by 3D Design Application. Design Evaluation Method can evaluate several design alternatives synthetically. In Project management System, Designer can simulate the project schedule and cost. In this report, We will introduce how design process can be innovated by way of $ezDesign^{(R)}$ System.

  • PDF

Application of Project Management on Pyro Project (파이로 프로젝트에 프로젝트 관리 적용 방안)

  • Kim, Jeong-Guk;Kim, Hyuck-Jong;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

Development and Application of Technology Modular Alternatives Setting Model for Evaluating R&D Project Effectively (효율적인 R&D과제평가를 위한 기술대체모듈 설정모형의 개발 및 적용)

  • Kwon, Cheol-Shin;Kim, Ki-Chan;Ahn, Ki-Hyun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.1
    • /
    • pp.22-31
    • /
    • 2010
  • In R&D project evaluation, we consider the technical couple. And we set technology modular alternatives, after evaluating technical group based on technical couple. So we solve the problem extracted from existing research of R&D project evaluation. We use Conjoint Analysis(CA) for this research. CA is usually used for confirming customers' preference. However we use it for researchers' preference in the side of technology. This research is followed by the next 4 steps. (1) Hierarchical model of goal technology (2) Composition model of modular alternatives (3) Evaluation model of modular alternatives (4) Setting model of technology modular alternatives.

A study on the Improvement Direction of Design Phase Entry Criteria Review for Naval Surface Ships & Onboard Weapon Systems R&D Project (함정 및 함정탑재 무기체계 연구개발사업의 설계단계 진입조건 검토 개선 방향)

  • Kwang Yong Hwang;Dong Myung Seol;Bong Wan Choi
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.1
    • /
    • pp.79-90
    • /
    • 2023
  • In principle, R&D of general weapons systems are led by companies or government-funded organizations. In terms of project execution, the defense R&D planning system was reorganized to conduct SE-based project management by integrating the naval ship project execution procedure into the general weapon system R&D procedure. The development progress was confirmed according to the guide for SE application of DAPA, and a technical review meeting was proposed to enter into the each next phase in the R&D process. This paper focuses on improvement for technical review in terms of technical management based on system engineering for R&D mounted weapon systems and the naval surface ship project in preliminary design and detailed design. So, the improvement direction for reviewing the entry criteria for the R&D weapons systems of the naval ship and mounted weapons is proposed.

A study of appropriateness evaluation method for quality activity management of Software R&D Project (융복합 시대의 국가 SW R&D 프로젝트에 대한 품질활동관리 적정성 평가 방안 연구)

  • Seo, Young Wook;Chae, Seong Wook
    • Journal of Digital Convergence
    • /
    • v.13 no.8
    • /
    • pp.91-99
    • /
    • 2015
  • Reviewing the previous researches related to SW quality, we find that they are mostly quality evaluation models for SW quality improvement and maturity-design models for software project management evaluation. There are few studies for the appropriateness of SW quality management by Quality Control(QC) functions. Moreover, they are bound for government's SW R&D projects in the view of the third party. Therefore, we propose means for the objective evaluation of SW quality management's appropriateness by QC functions. For this reason, there are three research proposes in our study as follows. Firstly, we produce problems for the evaluation of the existing government's SW R&D project management's appropriateness. Secondly, to overcome the drawbacks for the evaluation of the appropriateness of SW quality management, new appropriateness evaluation methods are proposed. Lastly, we investigate the availability and effectiveness of the appropriateness evaluation methods for WBS projects.

Market, Firm, and Project-level Effects on the Innovation Impact of FP RTD Projects

  • Vonortas, Nicholas S.
    • STI Policy Review
    • /
    • v.1 no.2
    • /
    • pp.69-88
    • /
    • 2010
  • This paper explores the determinants of the innovation impact of publicly funded R&D projects along three broad dimensions, namely project, firm and market-related factors. In addition to these factors we examine the attributes of the research result per se and aspects of the commercialization process. The observations from empirical and qualitative analyses are based on R&D projects funded by the Fifth and Sixth Research Framework Programmes of the European Union. Firm size, prior experience, innovation culture, the nature of the project itself, explicit intension to commercialize, consortium management and strategy are the factors with the strongest effect on project success, defined in terms of product/process innovation and/or technical knowledge creation. The paper provides important implications for the organization, objectives, and management of public programmes that fund R&D and for project and participant selection.