• Title/Summary/Keyword: Quantity of Reflect

Search Result 98, Processing Time 0.021 seconds

A Study on Improvement for Organizing Construction Bill of Quantity based on Digital Quantity Take-Off (디지털 수량산출에 기반한 건축공사 내역서 구성에 대한 연구)

  • Song, A-Reum;Kang, Ki-Su;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.198-199
    • /
    • 2014
  • In construction management the estimation procedure of construction expanses follows a series of submission phases: production of drawings, the assessment report, and the expanse report. In South Korea, it is a widely known issue that the expanse report only includes the net expanses at each construction phase and part, which makes it difficult to trace detailed basis from the records. This issue with inefficient record management should pose a number of problems, which result from discontinuation of construction record, unproductiveness for reproduction of records at each construction and submission phases for construction management, and failure to perform fair management among the contracting parties. Thus, the amendment in which the assessment report and the quantity estimation report reflect common codes to share throughout types of construction, space, and parts should be applied into practices so as to model production of acceptable reports and record.

  • PDF

A Quantity Flexibility Contract Model for Optimal Purchase Decision (최적 구매량 결정을 위한 QF 계약 모형)

  • Kim Jong-Soo;Kim Tai-Young;Kang Woo-Seok
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.31 no.2
    • /
    • pp.129-140
    • /
    • 2006
  • Quantity Flexibility contract coordinates individually motivated supplier and buyer to the systemwide optimal outcome by effectively allocating the costs of market demand uncertainty. The main feature of the contract is to couple the buyer's commitment to purchase no less than a certain percentage below the forecast with the supplier's guarantee to deliver up to a certain percentage above. In this paper we refine the previous models by adding some realistic features including the upper and lower limits of the purchase. We also incorporate purchase and canceling costs in a cost function to reflect the real world contracting process more accurately. To obtain the solution of the model, we derive a condition for extreme points using the Leibniz's rule and construct an algorithm for finding the optimal solution of the model. Several examples illustrating the algorithm show that the approach is valid and efficient.

The Method for Estimating the Inverse Demand Curve of Cournot Model in Electricity Market (전력시장 적용을 위한 쿠르노 모델에서의 역수요함수 추정 방법 제안)

  • Kang Dong-Joo;Hur Jin;Kim Tae-Hyun;Moon Young-Hwan;Lee Keun-Dae;Chung Koo-Hyung;Kim Balho H.
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.2
    • /
    • pp.79-87
    • /
    • 2005
  • At present Cournot model is one of the most commonly used theories to analyze the gaming situation in oligopoly market. But there exist several problems to apply this model to electricity market. The representative one is to obtain the inverse demand curve able to be induced from the relationship between market price and demand response. In Cournot model, each player offers their generation quantity to accomplish maximum profit, which is accomplished by reducing their quantity compared with available total capacity. As stated above, to obtain the probable Cournot equilibrium to reflect real market situation, we have to induce the correct demand function first of all. Usually the correlation between price and demand appears on the long-term basis through the statistical data analysis (for example, regression analysis) or by investigating consumer utility functions of several consumer groups classified as residential, industrial, and commercial. However, the elasticity has a tendency to change continuously according to the total market demand size or the level of market price. Therefore it should be updated as trading period passes by. In this paper we propose a method for inducing and updating this price elasticity of demand function for more realistic market equilibrium.

Comparison of the quantity estimations from the design phase and the settlement quantities of construction field to improve the extra rates of bar splice (철근 이음조정률의 개선을 위한 설계견적 수량과 현장시공 정산 수량의 비교분석 연구)

  • Kim, Sang-Yeon;Choi, Bo-Mi
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.257-266
    • /
    • 2017
  • LH has been using ultra high strength reinforcing bars (SD500 and SD600), since 2011. Such a change requires an adjustment of the old extra rates of bar splice to reflect use of ultra high strength reinforcing bars, as these rates had been set based on SD400 bars. It is particularly difficult to calculate precisely rebar lap-splice locations for large areas, such as those in apartment buildings. This research aims to adjust the extra rates of bar splice to reflect a reasonable rate; the rebar lap-splice length is not an exact estimation, but instead, an extra rates of bar splice is set and the rebar lap-splice length is increased by 2% (D 10) - 7% (025) depending on the bar size. The subjects of this study are LH apartments undergoing frame construction. We studied the quantity estimations from the design drawings, and analyzed the settlement quantities of construction field. The results of the study revealed that, when each of the quantities are analyzed, consider adjusting the extra rates of bar splice of some rebar to 1% - 3.5%. This was caused by an overuse of reinforcing bars in onsite construction and the use of supporting bars that have not been reflected in the documents, among other reasons. Based on the results of our study, an improvement plan for the current extra rates of bar splice seems to be necessary, cutting or raising the rate depending on the analysis of the data. Through this study, we expect to contribute to the calculation of reasonable construction costs, improvements in the quality of rebar work, and improvements in the capacity of design techniques for apartment buildings.

Response Experiences with a Semi-Quantitative Food Frequency Questionnaire : A Qualitative Study using Cognitive Interview (반정량 식품섭취빈도조사의 응답에 관한 인지면접연구)

  • Lee, Gyeong-Sil;Yi, Myung-Sun;Joung, Hyo-Jee;Paik, Hee-Young
    • Journal of Nutrition and Health
    • /
    • v.40 no.6
    • /
    • pp.566-575
    • /
    • 2007
  • The purpose of this research was to understand how individuals reflect on the frequency and quantity of foods that they consume. Participants selected 5 males and 15 females aged 30 years or older were first interviewed on the frequency of their food consumption. Then based on this data, they were given a cognitive interview using the method of verbal proving. The individual cognitive interviews were recorded with consent while being conducted after complete approval by the Seoul National University Institution Review Board. The recorded material was evaluated using a thematic analysis after transcribing them into text. By analyzing stages of reflection, the major barriers to make the device difficult are revealed: 1) More difficulty in remembering events over the course of a full year due to diversification in the types of food that people consume 2) difficulty calculating the average for seasonal foods 3) difficulty estimating the amount of consumption from the photos presented 4) difficulty estimating amount of consumption from the quantity presented 5) difficulty processing foods that people think are healthy and foods are unhealthy simultaneously 6) difficulty having to consider foods where target food goes in as an ingredient; 7) difficulties arising from having to increase frequency when the amount consumed is higher than the quantity that is presented 8) difficulty having to combine the frequency and quantity of each food item when numerous foods are clustered into one category. These findings show that the less participants were involved in cooking, the more diverse their eating habits were, and the more they tried to adhere to rules of filling out the questionnaire, the more it was difficult for them to come up with an answer to the question being asked. It therefore seems necessary to construct a Food Frequency questionnaire that is attentive to these problems that arise from the recall stages.

Algorithm for the Incremental Augmenting Matching of Min-Distance Max-Quantity in Random Type Quadratic Assignment Problem (랜덤형 2차원 할당문제의 최소 거리-최대 물동량 점진적 증대 매칭 알고리즘)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.3
    • /
    • pp.177-183
    • /
    • 2022
  • There is no known polynomial time algorithm for QAP that is a NP-complete problem. This paper suggests O(n2) polynomial time algorithm for random type quadratic assignment problem (QAP). The proposed algorithm suggests incremental augmenting matching strategy that is to set the matching set M={(li,fj)} from li with minimum sum of distance in location matrix L and fj with maximum sum of quantity in facility matrix F, and incremental augmenting of matching set M from M to li with minimum sum of distance and to fj with maximum sum of quantity. Finally, this algorithm performs swap strategy that is to reflect the complex correlations of distances in locations and quantities in facilities. For the experimental data, this algorithm, in spite of O(n2) polynomial time algorithm, can be improve the solution than genetic algorithm a kind of metaheuristic method.

Time-varying physical parameter identification of shear type structures based on discrete wavelet transform

  • Wang, Chao;Ren, Wei-Xin;Wang, Zuo-Cai;Zhu, Hong-Ping
    • Smart Structures and Systems
    • /
    • v.14 no.5
    • /
    • pp.831-845
    • /
    • 2014
  • This paper proposed a discrete wavelet transform based method for time-varying physical parameter identification of shear type structures. The time-varying physical parameters are dispersed and expanded at multi-scale as profile and detail signal using discrete wavelet basis. To reduce the number of unknown quantity, the wavelet coefficients that reflect the detail signal are ignored by setting as zero value. Consequently, the time-varying parameter can be approximately estimated only using the scale coefficients that reflect the profile signal, and the identification task is transformed to an equivalent time-invariant scale coefficient estimation. The time-invariant scale coefficients can be simply estimated using regular least-squares methods, and then the original time-varying physical parameters can be reconstructed by using the identified time-invariant scale coefficients. To reduce the influence of the ill-posed problem of equation resolving caused by noise, the Tikhonov regularization method instead of regular least-squares method is used in the paper to estimate the scale coefficients. A two-story shear type frame structure with time-varying stiffness and damping are simulated to validate the effectiveness and accuracy of the proposed method. It is demonstrated that the identified time-varying stiffness is with a good accuracy, while the identified damping is sensitive to noise.

A Proposal for Inverse Demand Curve Production of Cournot Model for Application to the Electricity Market

  • Kang Dong-Joo;Oh Tae-Kyoo;Chung Koohyung;Kim Balho H.
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.403-411
    • /
    • 2005
  • At present, the Cournot model is one of the most commonly used theories to analyze the gaming situation in an oligopoly type market. However, several problems exist in the successful application of this model to the electricity market. The representative one is obtaining the inverse demand curve able to be induced from the relationship between market price and demand response. In the Cournot model, each player offers their generation quantity to obtain maximum profit, which is accomplished by reducing their quantity compared with available total capacity. As stated above, to obtain the probable Cournot equilibrium to reflect the real market situation, we have to induce the correct demand function first of all. Usually the correlation between price and demand appears over the long-term through statistical data analysis (for example, regression analysis) or by investigating consumer utility functions of several consumer groups classified as residential, industrial, and commercial. However, the elasticity has a tendency to change continuously according to the total market demand size or the level of market price. Therefore it should be updated as the trading period passes by. In this paper we propose a method for inducing and updating this price elasticity of demand function for more realistic market equilibrium.

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

A Proposed Method for Estimating Demand function of Cournot Model in Electricity Market (전력시장에서의 쿠르노 수요함수 추정)

  • Kang, Dong-Joo;Hur, Jin;Oh, Tae-Kyoo;Chung, Koo-Hyung;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.168-170
    • /
    • 2005
  • At present Cournot model is one of the most commonly used theories to analyze the gaming situation in oligopoly market. But there exist several problems to apply this model to electricity market. The representative one is to obtain the inverse demand curve able to be induced from the relationship between market price and demand response. In Cournot model, each player offers their generation quantity to accomplish maximum profit, which is accomplished by reducing their quantity compared with available total capacity. As stated above, to obtain the probable Cournot equilibrium to reflect real market situation, we have to induce the correct demand function first of all. Usually the correlation between price and demand appears on the long-term basis through the statistical data analysis (for example, regression analysis) or by investigating consumer utility functions of several consumer groups classified as residential, industrial, and commercial. However, the elasticity has a tendency to change continuously according to the total market demand size or the level of market price. Therefore it should be updated as trading period passes by. In this paper we propose a method for inducing and updating this price elasticity of demand function for more realistic market equilibrium

  • PDF