A Study on Improvement for Organizing Construction Bill of Quantity based on Digital Quantity Take-Off

디지털 수량산출에 기반한 건축공사 내역서 구성에 대한 연구

  • 송아름 (경상대학교 건축공학과) ;
  • 강기수 (경상대학교 융합과학기술대학원 건설공학과 건축공학전공) ;
  • 윤석헌 (경상대학교 건축공학과)
  • Published : 2014.05.29

Abstract

In construction management the estimation procedure of construction expanses follows a series of submission phases: production of drawings, the assessment report, and the expanse report. In South Korea, it is a widely known issue that the expanse report only includes the net expanses at each construction phase and part, which makes it difficult to trace detailed basis from the records. This issue with inefficient record management should pose a number of problems, which result from discontinuation of construction record, unproductiveness for reproduction of records at each construction and submission phases for construction management, and failure to perform fair management among the contracting parties. Thus, the amendment in which the assessment report and the quantity estimation report reflect common codes to share throughout types of construction, space, and parts should be applied into practices so as to model production of acceptable reports and record.

Keywords