Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS. (WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구)

  • Ahn, Jae-Hong;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

A Study on the Simplification for Quantity Bill Writing and Structure in the Electrical Extension Field (내선분야 내역서 작성 및 체계 간소화 방안 고찰)

  • Hyun, So-Young;Kim, Gwang-Gon;Park, Min-Young;Choi, Seung-Dong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.1
    • /
    • pp.173-178
    • /
    • 2012
  • The quantity bill writing of organized electrical construction can be an effective to quality and process management in the construction. Therefore, in order to overcome confusion of the construction and doing an effective work, the clearly quantity bill writing is need. This paper is a focused to solve a problem of existing quantity bill as the difference in terms of work section and item information, regulatory information of ordering authority. Therefore, a terms of work section and item information, regulatory information of ordering authority has been normalized. Moreover, basic data of simplification for quantity bill writing and structure has been guaranteed.

Decision of optimal incentives and total order quantity with consideration of return rate of remanufacturing product (재생산 제품의 회수율을 고려한 최적 인센티브 및 총 주문량 결정)

  • Lee, Yong-Hyun;Lee, Chul-Ung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.8
    • /
    • pp.165-176
    • /
    • 2011
  • In this paper, we develop the cost minimization model to select two incentives and total order quantity with consideration of remanufacture company's return incentive. Return rate is sensitive to the incentive that the manufacture company offers. Using a EOQ(Economic Order Quantity) model of a cost minimization, we show concavities of the model about two incentives and total order quantity respectively. According to the proposed algorithm using the concavities, we find out the optimized incentive prices and total order quantity. Through numerical study, we examine sensitive analysis of the incentive price and order quantity for each parameter when the return rate is sensitive to incentive. Company lessens incentive to reduce total price. However, this makes the total price increase due to a diminution of return quantity. We expect that domestic or overseas remanufacture businesses are able to decide optimal incentive and total order quantity by this research.

Considerations When Quantity Take-Off of Rebar Based on the BIM Model (BIM Model 기반 철근 수량산출 시 고려사항)

  • Jeong, Seo-Hee;Kim, Ju-Yong;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.73-74
    • /
    • 2023
  • The purpose of this study is to derive the cause of the quantity difference and present the considerations when take-off rebar quantity based on BIM model by comparing the quantity of rebar based on BIM model with 2D drawing. This research was limited to take-off the quantity of rebars in the building frame work, and after take-off the quantity of rebars by 3D modeling the 2D drawing of the target building with Revit, the quantity difference was compared with 2D-based software. Therefore, when take-off the quantity of rebars based on the BIM model, instead of take-off the existing 2D-based quantity premium proportion, according to general structural consider development length, lap splice length, covering thickness, reinforcing bars and spacing. In the future, this study is expected to contribute to improving the accuracy of BIM-based frame construction quantity take-off.

  • PDF

A Study on Automated Quantity Take-off Methods of Earth Works in Road Design using 3D Design Concept (3차원 설계를 통한 도로설계단계의 토공 자동물량 산정 방안에 관한 연구)

  • Cho, Myunhwan;Kim, Nakseok;Chae, Jae-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.277-283
    • /
    • 2016
  • Recently, the interests in three-dimensional design and BIM(Building Information Modeling) are increasing in civil engineering sector and the researches about three-dimensional design and quantity take-off methods for civil engineering structures have been conducted. However, these studies are just carried out the 3D design and quantity calculation of civil structures on the road or railway such as bridges and tunnels. The study on the quantity take-off methods and the evaluation of calculated results on the earth works should be performed in more detail. Based on these backgrounds in mind, the study was conducted the three-dimensional road design and evaluated the quantity take-off results on the earth works using 3D calculation method(average end area method, prismoidal method and composit method). The calculated quantity from composit method showed about 5% error of measuring efficiency than the average end area method, and when reporting the quantity calculation of earth works, it is necessary to specify the calculation method using quantity take-off of earth works.

The Extraction Method of Spacial Element Cost based on the Quantity Take-Off and Bill of Quantity (건설공사의 수량산출서 및 산출내역서 기반 공간별/부위별 공사비 추출방법에 관한 연구)

  • Nam, Dong-hee;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.232-233
    • /
    • 2021
  • As construction projects become larger and more complex in the construction environment, and as the Building Information Model(BIM) is technically introduced, the demand for construction costs in units of space is increasing. Cost estimating of spacial element can reduce the error in cost prediction method based on cost of work type and to utilize the construction cost data for each space in the design phase. The purpose of this study is to extract spatial statements by utilizing spacial information of quantitative statements based on items that are common elements of the Quantity Take-Off and Bill of Quantity.

  • PDF

Basic Research on BIM-Based Quantity Take-off Guidelines

  • Yun, Seokheon;Kim, Sangchul
    • Architectural research
    • /
    • v.15 no.2
    • /
    • pp.103-109
    • /
    • 2013
  • Various types of building information should be linked to 3D model objects for their effective use by stakeholders. Because Building Information Modeling (BIM) based on 3D is used by different stakeholders, the created BIM need standard guidelines for each purpose, as, for example, for quantity take-off. Thus, this study was conducted to propose guidelines for BIM modeling for quantity take-off in the framework, especially, in the concrete and form. The proposed guidelines adopted each element of the BIM model based on an analysis of the problem of the general BIM model. Moreover, the usability and accuracy of the reinforced structure modeling guidelines were verified by comparing the quantity of the commercial estimation software and the modeling quantity using the proposed modeling guidelines.

Low-Carbon Information Management of Street Lamps and Street Trees Using GIS (GIS를 이용한 가로등 및 가로수의 저탄소 정보 관리)

  • Choi, Byoung Gil;Na, Young Woo;Kwon, Oh Sub
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.1
    • /
    • pp.55-62
    • /
    • 2014
  • Diverse improvement projects such as replacing street lamps with LED, street trees, etc are currently in progress in Korea to reduce greenhouse gas so as to cope with change in climate. However, the effect of climate change policy is not exactly analyzed, because exhaust quantity and absorption quantity of greenhouse gas of the target street lamp and street trees are not arranged as information. Thus, this study studied the method to systematically manage low carbon related information of urban facilities by using GIS. It was found that low carbon information of the urban facilities is necessary to exactly analyze effect of climate change policy and the method to calculate carbon exhaust quantity and absorption quantity of each facilities should be established to build exact low carbon information of urban facilities. Further, it was found that the visualization of information related to low carbon of street lamp and street trees by using GIS easily and visually grasps and systematically controls the effect of policy coping with change in climate than the existing numeral data of exhaust quantity and absorption quantity of greenhouse gas.

Early Warning System for Inventory Management using Prediction Model and EOQ Algorithm

  • Majapahit, Sali Alas;Hwang, Mintae
    • Journal of information and communication convergence engineering
    • /
    • v.19 no.4
    • /
    • pp.221-227
    • /
    • 2021
  • An early warning system was developed to help identify stock status as early as possible. For performance to improve, there needs to be a feature to predict the amount of stock that must be provided and a feature to estimate when to buy goods. This research was conducted to improve the inventory early warning system and optimize the Reminder Block's performance in minimum stock settings. The models used in this study are the single exponential smoothing (SES) method for prediction and the economic order quantity (EOQ) model for determining the quantity. The research was conducted by analyzing the Reminder Block in the early warning system, identifying data needs, and implementing the SES and EOQ mathematical models into the Reminder Block. This research proposes a new Reminder Block that has been added to the SES and EOQ models. It is hoped that this study will help in obtaining accurate information about the time and quantity of repurchases for efficient inventory management.

Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame (건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석)

  • Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.651-662
    • /
    • 2023
  • Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.