• 제목/요약/키워드: Quantity estimation process

검색결과 102건 처리시간 0.026초

Schematic Estimation Process using Architectural Object BIM Library

  • Lee, Ji Yong;Kim, In Han;Choi, Jung Sik
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.289-293
    • /
    • 2015
  • The construction industry has been evolving with the development of information technology. According to this trend, the current industry changes from 2d drawings to Building Information Modeling(BIM). Current studies on the BIM-based estimation have problems such as Quantity Take-Off(QTO) specificity toward a particular software, the uncertainty of the amount in accordance with the model quality. These studies focus on QTO based on BIM rather than schematic estimation. In addition, studies on the connection with the QTO and unit cost for schematic estimation are insufficient. The purpose of this study is to propose schematic estimation process by utilizing construction codes and QTO in architectural object BIM libraries. Construction codes are classified in detail in order to input codes inside each. This study has connected unit cost and construction classification codes that obtain from BIM model. The results of this study will be helpful in decision-making and communication for schematic estimation of the design phase. It will improve the efficiency and reliability problems of existing schematic estimation.

  • PDF

건축 물량산출 활용을 위한 BIM품질기준 도입 방안 (Introduction of BIM Quality Standard for Quantity Take-off)

  • 권오철;조찬원;조주원
    • 한국건축시공학회지
    • /
    • 제11권2호
    • /
    • pp.171-180
    • /
    • 2011
  • 최근 국내외에서 건축물의 고층화 및 비정형화 추세 속에서 BIM기술이 활발히 이루어지고 있으나 설계단계의 BIM 데이터가 시공현장에 적극적으로 재활용되지는 못하고 있다. 건설 회사들의 주요 관심사는 공정 및 공사비 관리 등 여러 분야인데 BIM기술이 활발히 사용되기 위해서는 BIM 데이터가 이러한 용도로 활용될 수 있도록 올바르게 작성되어야 한다. 이를 위해서는 특히 BIM데이터를 건물 부재별로 수량을 올바르게 산출할 수 있도록 기준을 설정하여 BIM데이터를 작성하는 것이 필요하며 작성된 BIM데이터가 올바르게 만들어졌는지를 품질관리 차원에서 확인하는 것이 필요하다. 본 연구는 BIM기술이 건설현정의 공정 및 공사비 관리에 활용에 매우 중요한 물량산출을 올바르게 할 수 있도록 BIM데이터의 품질을 확보할 방안에 대한 제시를 목적으로 수행되었다.

철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립 (BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures)

  • 주선우;김치경;김시욱;노준오
    • 한국전산구조공학회논문집
    • /
    • 제30권6호
    • /
    • pp.567-576
    • /
    • 2017
  • 본 연구는 BIM 도입 효과를 극대화할 수 있는 현장 적용성 확보에 중점을 둔 철근콘크리트 골조공사의 BIM 견적모델 작성과 BIM기반 견적 업무 프로세스를 표준화한 가이드라인을 제시하는 것을 목적으로 한다. 이를 위하여 기존 지침 및 가이드라인의 BIM 견적모델 작성 범위 및 방식을 고찰하고, 철근콘크리트공사 수량산출 견적 지침 및 기준을 분석하며, 기존 견적 방식과 BIM기반 견적 방식에 대해 비교분석한다. 이를 통하여 BIM기반 견적 업무의 표준 프로세스를 수립하고, 콘크리트/거푸집/철근 견적모델의 작성 및 수량산출 기준을 도출하며, 철근콘크리트공사 BIM기반 수량산출 및 견적 업무의 성과물 목록 및 양식을 제시한다. 본 연구를 통해 작성된 BIM 견적 가이드라인은 BIM기반의 새로운 기술환경에 대한 진입장벽을 낮추고, 견적의 정확성 극대화를 통한 원가절감을 실현하며, BIM 업무와 건설산업의 생산성과 부가가치를 증대시켜, 궁극적으로 건설사업 전 생애주기에서 생산되는 정보를 통합 관리할 수 있는 기반을 구축하고 BIM 생태계를 조성하는데 기여할 것으로 기대한다.

소성변형 밀 마멸에 대한 열간 단조 금형의 수명 평가 (Life Estimation of Hot Forging Die by Plastic Deformation and Wear)

  • 이현철;김병민;김광호
    • 한국정밀공학회지
    • /
    • 제20권2호
    • /
    • pp.66-75
    • /
    • 2003
  • This paper describes about the estimation method of die lift by wear and plastic deformation in hot forging process. The thermal load and the thermal softening are happened by the high temperature in hot forging process. Tool lift decreases considerably due to the softening of the surface layer of a tool caused by high thermal load and long contact time between tool and billet. Also, tool life is to a large extent limited by wear, heat crack and plastic deformation in hot forging process. Above all, the main factors which affects die accuracy and tool lift are wear and the plastic deformation of a die. The new developed technique for predicting tool life applied to estimate the production quantity for a spindle component and these techniques assist to improve the tool life in hot forging process.

적정처리를 위한 주거환경개선지구 내 구조형태별 지정폐기물 발생량 예측에 관한 연구 (A Study on the Estimation about Aomunt of the Amelioration Districts for Optimum Process of Designated Wastes)

  • 신용철;손병훈;홍원화;이재성
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2008년도 춘계학술발표대회 논문집
    • /
    • pp.285-290
    • /
    • 2008
  • Recently, the scale of the construction work has been increased due to the revitalization of the construction industries. therefore, the demolition work in downtown areas is increased too. Amelioration districts are deteriorating rapidly since it followed the policy which allowed a large number of constructions in a very short period of time. therefore, the quantity of construction wastes and the designated wastes such as asbestos are increased. This study was classifying and analyzing the constructions in amelioration districts to estimate quantity of the designated wastes and the unit of the designated wastes. According to the results of this research, the average annual designated wastes was increased up to 2.59% in comparison with 2,779,334 ton in 2000, there came out 3,151,653 ton of designated wastes in 2005. For the appropriate disposal of increasing designated wastes, it is necessary to study exact estimation of the quantity of wastes.

  • PDF

3차원 선박형상정보를 활용한 설계초기단계 용접물량 산출 (Estimation of Welding Material Quantity for Shipbuilding at Early Design Stage based on Three-dimensional Geometric Information)

  • 이정훈;변석호;남종호;강태원
    • 대한조선학회논문집
    • /
    • 제54권1호
    • /
    • pp.57-62
    • /
    • 2017
  • These days, shipbuilding companies are making an effort to adopt the IT technology in order to improve the production efficiency. One such effort is to utilize a planning and scheduling system to predict the production cost in advance. In this system, assessing the welding material quantity is an important factor. Unfortunately, obtaining the welding material quantity in the early design stage is extremely difficult because the detailed production information, which is essential in deriving the cost associated with welding, is normally available at a later stage. This paper aims at developing a computerized program that produces an index to estimate the welding material quantity in the early design stage. By using only three-dimensional geometric information, the program analyzes the production process and estimates the welding material quantity at any design or production stage when no production information is available. The results can be used for the planning and scheduling system.

IT Model to Calculate Required Equipments for Excavation Work in Construction Projects

  • Mahajan, Darshan A.;Rajput, Babalu L.
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.1-4
    • /
    • 2013
  • Excavation is most commonly used activity in all construction projects. All contracting agencies prefer to use bigger and heavier excavators and dumpers on site to do excavations if quantity of excavation is huge. Estimation of required number of excavators and dumpers for completion of excavation could be rather a tedious process involving repetitive calculation on which professionals spend their valuable time. As the Information Technology is highly involved in construction section there os need to have IT model for estimation of number of excavators and dumpers. The developed model is useful to calculate required equipments within short period of time. The purpose of the developed IT model is to save the time and efforts of the construction professional. The paper discusses about model which can be used on site to estimate numbers of excavators and dumpers required for completion of certain quantity of excavation within the given time. The calculation considers various existing formulas and method to generate the output. This information could certainly be useful in planning equipments on construction project sites. The tool is user friendly where any non IT background person can use it on construction sites.

가공철근 물량산출 및 배근시공상세도 작성시스템 개발 (Developing An Automatic System for Quantity Taking-off Cut and Bent Re-Bar and Making a Placing Drawing)

  • 박현용;이승현;강태경;이유섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.358-363
    • /
    • 2007
  • 철근콘크리트 구조물 형태의 건설공사에 있어 철근공사는 구조적인 측면이나 공사비 비중으로 볼 때 매우 중요한 부분을 차지한다. 철근물량의 정확한 산출은 이러한 철근공사의 효과적인 관리를 위한 기본적인 업무로 볼 수 있으나, 기술의 발전이나 개선 노력에도 불구하고 여전히 철근 숙련공의 경험이나 인력에 의존하는 전 근대적인 방식에서 벗어나지 못하는 실정이다. 따라서 본 연구는 철근 물량을 부재별/배근별로 보다 신속하고 정확하게 산출하기 위한 전산프로그램의 개발을 목적으로 하며, 이를 위해 연결된 부재의 철근 배근 상태를 감안하여 이음길이와 정착 길이, 피복두께등을 고려한 물량산출 알고리즘을 개발하였다. 개발된 프로그램은 전문 인력의 판단이 아닌 논리적인 게산에 의해 신속하게 수량을 산출할 수 있으며, 설계 변경이 잦은 철근공사에 유연하게 대처할 수 있다는 장점을 지니며 물량산출 과정에서 나온 결과 값을 바탕으로 시공 상세도를 자동으로 작성하는 기능을 포함한다.

  • PDF

CRITICAL FACTORS FOR ASSESSMENT OF BIM BASED QUANTITY-TAKE OFF

  • Seong-Ah Kim;Chang-Hee Lee ;Sangyoon Chin;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.7-11
    • /
    • 2011
  • Quantity take-off (QT) is one of the most important tasks for determining the total cost of a construction project, and it requires accuracy and reliability for the result. Accuracy and reliability in BIM-based QT are also required to assure the completeness of the result. However, there has been no basis to measure the completeness of the BIM-based QT result. As BIM is increasingly being adopted in the construction industry with a wide variety of purposes, it becomes more important to have a method to improve the completeness of BIM-based QT and criteria to measure it. This research focuses on the hypothesis that the completeness of BIM-based QT relies on the accuracy and reliability of BIM and the BIM-based QT process. As a basic research to determine the completeness of BIM-based QT, this research analyzes and derives factors that affect the completeness of BIM-based QT.

  • PDF

BIM기반 Life Cycle Cost 산정을 위한 프로세스에 관한 연구 (A Study on the Estimating Process for Life Cycle Cost based on BIM)

  • 이현주;문준호;박규태;김태희;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.149-151
    • /
    • 2011
  • Recently, Architectural Design based on Building Information Modeling(BIM) is popular, construction management based on BIM is necessary. such as Quantity take off, scheduling, and Life Cycle Cost Estimating etc. Therefore, in the study, LCC Estimating using BIM Data, which is extracted from architectural designing process is proposed.

  • PDF