Estimation of Welding Material Quantity for Shipbuilding at Early Design Stage based on Three-dimensional Geometric Information |
Lee, Jeong-Hoon
(Department of Convergence Study on the Ocean Science and Technology, Korea Maritime & Ocean University)
Byun, Seok-Ho (Division of Naval Architecture and Ocean Systems Engineering, Korea Maritime & Ocean University) Nam, Jong-Ho (Division of Naval Architecture and Ocean Systems Engineering, Korea Maritime & Ocean University) Kang, Tae-Won (Marine Tech-In, Co., Ltd.) |
1 | Roh, M.I. & Lee, K.Y., 2006. A study on the generation of the production material information of a building block and the simulation of the block erection. Korean Journal of Computational Design and Engineering, 11(2), pp.115-127. |
2 | Ruy, W.S. Kim, H.K. & Ko, D.E., 2013. A study on the welding amount estimation system combined with 3D CAD tool. Journal of the Korea Academic-Industrial Cooperation Society, 14(7), pp.3184-3190. DOI |
3 |
ASME, 2010. BPVC IX. Avaliable at: |
4 | Cho, K.K. et al., 1998. Determination of assembly units and assembly sequences for block assembly in shipbuilding. Proceedings of the Korean Operations and Management Science Society Conference, Kyungsung University, April 24-25, 1998, pp.1-8. |
5 | Lee, K.T. Kang, B.Y. Kang, S.W. & Um, D.S., 1998. A study on the development of welding material quantity estimation system for ship structures. Journal of Ocean Engineering and Technology, 12(4), pp.51-59. |
6 |
OCCT, 2016. OpenCASCADE technology documentation. Avaliable at: |