• Title/Summary/Keyword: Quantity calculation

Search Result 255, Processing Time 0.029 seconds

Compatibility inspection for the way for Decision about Bight Flow Profile of Standard River Design (하천설계기준의 만곡부 수면형 결정 방법에 대한 적용성 검증)

  • Choi, Han-Kuy;Che, Hong-Gi;Baek, Hyo-Sun
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.43-51
    • /
    • 2006
  • Through the result of calculating the deviation between the value calculated from two-dimensional number formula, one-dimensional number interpretation, and curving part water surface type calculation method, we could confirmed that the deviation is reduced more than 50% when we use curving part water surface type calculation method. Also it was confirmed that there occurs the reduction rate of maximum 59% as the result of comparing with one-dimensional number interpretation since the reduction rate of safe room height was 20%, in 500 CMS of flood water quantity when we planted the construction of levee by curving part water surface type calculation method. And therefore, we have confirmed that the curving water surface type calculation method can be used as a simple formula in rivers with water quantity less than 500 CMS that flows in and out in Jess than 90 degree angle.

  • PDF

Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame (건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석)

  • Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.651-662
    • /
    • 2023
  • Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.

Basic study about Automatic Rebar Quantity Estimation Integrated with Structural Design Information (구조설계정보 통합 관리에 의한 철근 물량 산출 자동화 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.109-110
    • /
    • 2015
  • Estimation of rebar quantity may be used as an index to evaluate the economic feasibility of structural designs. However, when using the software to estimate the rebar quantity, there may be some limitations such as data loss caused by human errors and estimation delays caused by increased input time, since the information on arrangement of rebar is inserted manually. To solve the problems of such quantity estimation software, it is necessary to develop a method on automatic input/output of structural design information for quantity estimation and an algorithm for accurate estimation of rebar quantity. The purpose of this study is to improve the existing rebar quantity estimation by connecting with the database on information related to rebar estimation and the algorithm for rebar estimation, in order to develop an algorithm to estimate an accurate, net rebar quantity. The study result can be used as basic data for development of software for efficient structural designs and automatic framework estimation of buildings.

  • PDF

A Verification of the Accuracy in BIM-Based Quantity Taking-Off - Focusing on Finishing Work (BIM 기반 물량 산출의 정확성 검증 - 마감공사 공종을 중심으로)

  • Kim, Ji-Hyun;Yoon, Su-Won
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • Currently, various studies and applications related BIM based quantity take-off have been attempted, because of the accuracy of cost estimating and reliability by using the BIM model information in automatical calculation. Finishing works that have a large number of various types and materials need the higher accuracy and reliability on the BIM-based quantity take-off. Therefore, this study compared and analyzed 2D and 3D based quantity through Test-bed and determine the cause of the quantity difference. This verified the accuracy and efficiency in the BIM-based quantity take-off for finishing works. Also this study has been proposed opinions for calculating the exact BIM-based quantity take-off.

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information (3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

Verification Method for Quantity Takeoff Results of Concrete Works using Design Drawing Information (도면정보 기반 건축공사 콘크리트 물량산출 성과물 검증방안 개발)

  • Lim, Haejin;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.20-28
    • /
    • 2020
  • In construction project, an error in quantity information immediately leads to an error in the quotation, highly reliable quantity calculation is required for successful performance of a project. But there is a difficulty in the current situation for the person in charge to review all calculation sheets for quantity review as the quotation work has to be performed in a short period of time. Accordingly, it is thought that a review plan is required to secure reliability on calculated results and the review plan should be able to be carried out within insufficient quotation periods. In the present paper, it is intended to present a plan that enables quantity to be reviewed with the minimum number of persons within the shortest period of time through an algorithm of calculating a verification quantity. The suggested algorithm allows the result of quantity calculation work carried out earlier based on 2-dimensional drawing to be compared, not with an accurate quantity, but within an error range.

A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase (실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구)

  • Park, Seunghwa;Kim, Heungsoo;Yoon, Dooyung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.

Calculation of Seasonal Demand Side Management Quantity Using Time Series (시계열 모델을 이용한 계절별 수요관리량 산정)

  • Lee, Jong-Uk;Wi, Young-Min;Lee, Jae-Hee;Joo, Sung-Kwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.12
    • /
    • pp.2202-2205
    • /
    • 2011
  • Demand side management is used to maintain the reliability of power systems and to increase the economic benefits by avoiding power plant construction. This paper presents a systematic method to calculate the quantity of seasonal demand side management using time series. A numerical example is presented to calculate the quantity of demand side management in winter season using time series.

Computer나 Calculator를 이용한 계산에서 오류 교정을 위한 어림셈 지도에 관한 연구

  • Gang Si Jung
    • The Mathematical Education
    • /
    • v.29 no.1
    • /
    • pp.21-34
    • /
    • 1990
  • This is a study on an instruction of estimation for error correction in the calculation with a computer or a calculator. The aim of this study is to survey a new aspect of calaulation teaching and the teaching strategy of estimation and finally to frame a new curriculum model of estimation instruction. This research required a year and the outcomes of the research can be listed as follows: 1. Social utilities of estimation were made clear, and a new trend of calculation teaching related to estimation instruction was shown. 2. The definition of estimation was given and actual examples of conducting an estimation among pupils in lower grades were given for them to have abundant experiences. 3. The ways of finding estimating values in fraction and decimal fraction were presented for the pupils to be able to conduct an estimation. 4. The following contents were given as a basic strategy for estimation. 1) Front-end strategy 2) Clustering strategy 3) Rounding strategy 4) Compatible numbers strategy 5) Special numbers strategy 5. In an instuction of estimation the meaning, method. and process of calculation and calculating algorithm were reviewed for the cultivation of children's creativity through promoting their basic skill, mathematical thinking and problem-solving ability. 6. The following contents were also covered as an estimation strategy for measurement 1) Calculating the sense of quantity on the size of unit. 2) Estimating the total quantity by frequent repetition of unit quantity. 3) Estimating the length and the volume by weighing. 4) Estimating unknown quantity based on the quatity already known. 5) Estimating the area by means of equivalent area transformation. 7. The ways of instructing mental computation were presented. 8. Reviews were made on the curricular and the textbook contents concerning estimation instructions both in Korea and Japan. and a new model of curriculum was devised with reference to estimation instruction data of the United States.

  • PDF