• Title/Summary/Keyword: Quantity

Search Result 9,276, Processing Time 0.033 seconds

A Study on the Simplification for Quantity Bill Writing and Structure in the Electrical Extension Field (내선분야 내역서 작성 및 체계 간소화 방안 고찰)

  • Hyun, So-Young;Kim, Gwang-Gon;Park, Min-Young;Choi, Seung-Dong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.1
    • /
    • pp.173-178
    • /
    • 2012
  • The quantity bill writing of organized electrical construction can be an effective to quality and process management in the construction. Therefore, in order to overcome confusion of the construction and doing an effective work, the clearly quantity bill writing is need. This paper is a focused to solve a problem of existing quantity bill as the difference in terms of work section and item information, regulatory information of ordering authority. Therefore, a terms of work section and item information, regulatory information of ordering authority has been normalized. Moreover, basic data of simplification for quantity bill writing and structure has been guaranteed.

USING QUANTITY ESTIMATE STATISTICAL MODELS FOR INFRASTRUCTURE LONG RANGE COST MANAGEMENT

  • Jui-Sheng Chou;Min Peng;James T. O'Connor;Khali R. Persad
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.808-813
    • /
    • 2005
  • Effective cost management requires reliable cost estimates at every stage of project development. The primary purpose of this research is to develop systematic modeling procedures and an automatic computing program for infrastructure estimating in the Texas Department of Transportation (TxDOT). The computing system toggles between project input information and segregated district unit prices for highway work item quantity estimates associated with earthwork and landscape, subgrade treatments and base, surface courses and pavement, structures, miscellaneous construction, and lighting, signing, markings and signals. This quantity-based approach was chosen because of the conventional approach lacking of quantity information until primary design is complete.

  • PDF

Conceptual Design and Characteristic Analysis of a Superconducting Motor using Iron Cores in the Field (계자 철심형 초전도 전동기 개념 설계 및 특성 해석)

  • Lee, S.H.;Kwon, S.O.;Hong, J.P.;Kwon, Y.K.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.10 no.3
    • /
    • pp.14-18
    • /
    • 2008
  • This paper deals with the conceptual design and characteristic analysis of core type superconducting motor using iron cores in the field. As the objective function of conceptual design, the flux quantity per pole is selected. In order to reduce the quantity of superconductors, the variations of flux quantity per pole by changing the design variables and area are investigated. Finally, the quantity of superconductors between air-cored and core type superconducting motor is compared under the same motor capacity. In addition, the dimensions and volumes of motors are compared.

Crafting an Automated Algorithm for Estimating the Quantity of Beam Rebar

  • Widjaja, Daniel Darma;Kim, Do-Yeong;Kim, Sunkuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.485-496
    • /
    • 2023
  • Precise construction cost estimation is paramount to determining the total construction expense of a project prior to the initiation of the construction phase. Despite this, manual quantification and cost estimation methods, which continue to be widely used, may result in imprecise estimation and subsequent financial loss. Given the fast-paced and efficiency-demanding nature of the construction industry, trustworthy quantity and cost estimation is essential. To mitigate these obstacles, this research is focused on establishing an automated quantity estimation algorithm, particularly designed for the main rebar of beams which are recognized for their complicated reinforcement configurations. The exact quantity derived from the proposed algorithm is compared to the manually approximated quantity, reflecting a variance of 10.27%. As a result, significant errors and impending financial loss can be averted. The implementation of the findings from this research holds the potential to significantly assist construction firms in quickly and accurately estimating rebar quantities while adhering strictly to applicable specifications and regulatory requirements.

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF

Effects of Location Based Coupon Through Smart Phone (스마트폰을 이용한 위치기반 쿠폰광고의 효과)

  • Joo, Young-Jin;Ji, Min-Seong;Lim, Jong-Hyeok
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.40 no.1
    • /
    • pp.35-55
    • /
    • 2015
  • In this research, we analyze the effects of price discounts and scarcity message (both quantity limitation message and time limitation message) on the purchase intention in the smart-phone environment. The purchase intention becomes higher at high discount rate and with scarcity message (both quantity limitation message and time limitation message). We also analyze the moderating effects of consumer's shopping value and distance between the consumer and the store on the effects of price discounts and scarcity message (both quantity limitation message and time limitation message) on the purchase intention. On average, the effects of price discount, time limitation message and quantity limitation message on the purchase intention become the highest levels for consumers pursuing hedonic shopping value. The effects of price discount, time limitation message and quantity limitation message on the purchase intention become higher when they are offered within a short distance between the coupon provider and the target customer.

Estimation of Welding Material Quantity for Shipbuilding at Early Design Stage based on Three-dimensional Geometric Information (3차원 선박형상정보를 활용한 설계초기단계 용접물량 산출)

  • Lee, Jeong-Hoon;Byun, Seok-Ho;Nam, Jong-Ho;Kang, Tae-Won
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.54 no.1
    • /
    • pp.57-62
    • /
    • 2017
  • These days, shipbuilding companies are making an effort to adopt the IT technology in order to improve the production efficiency. One such effort is to utilize a planning and scheduling system to predict the production cost in advance. In this system, assessing the welding material quantity is an important factor. Unfortunately, obtaining the welding material quantity in the early design stage is extremely difficult because the detailed production information, which is essential in deriving the cost associated with welding, is normally available at a later stage. This paper aims at developing a computerized program that produces an index to estimate the welding material quantity in the early design stage. By using only three-dimensional geometric information, the program analyzes the production process and estimates the welding material quantity at any design or production stage when no production information is available. The results can be used for the planning and scheduling system.

A Study on the Integrated Production-Inventory Model Under Quantity Discount (수량할인하(數量割引下)의 통합생산재고(統合生産在庫)모델에 관(關)한 연구(硏究))

  • Han, Yeong-Seop;Lee, Sang-Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.16 no.1
    • /
    • pp.78-87
    • /
    • 1988
  • The purpose of this study is to develop the algorithm applicable to the integrated production inventory model under quantity discount. To achieve this purpose, the integrated production inventory model which unifies the inventory problem of raw materials and the finished product for a single product manufacturing system is considered. The product is manufactured in batches and the raw materials are obtained from outside suppliers but some of the raw materials are discounted according to the purchasing quantity. The intergrated production inventory problem considered in this study is formulated by the non-linear mixed integer programming model, and the optimal solution is obtained by using the algorithm developed by Goyal. Then, the algorithm developed by this study is applied to the quantity discount problem, and the optimal solution is revised by this results. The quantity discount algorithm of the integrated production inventory model developed by this study gives a systematic procedure to obtain the optimum policy to minimize the total cost in any case. The numerical example involving 20 raw materials and 5 raw materials among them are discounted according to the purchasing quantity is given to verify the mathematical model and the algorithm developed in this study.

  • PDF

Effects of Leaf Loading Quantity and Circulating Air Volume on the Physical and Chemical Characteristics during Curing in Flue-cured Tobacco Leaves. (열풍건조시 적입 및 송풍량에 따른 황색종 연초엽의 이화학성 변화)

  • 석영선;노재영
    • Journal of the Korean Society of Tobacco Science
    • /
    • v.14 no.1
    • /
    • pp.48-56
    • /
    • 1992
  • This studies were carried out to investigate the effects of leaf loading quantity and circulating air volume during bulk curing on the variation of physical and chemical characteristics in flue-cured tobacco. The results are as follows : 1. The content of sugar in cured leaves was decreased with more circulating air volume and leaf loading quantity at bulk curing. 2. Total nitrogen and protein nitrogen were decreased with less circulating air volume and more leaf loading quantity, while amino nitrogen was increased. 3. The contents of linolenic acid and linoleic acid were increased with more leaf loading quantity and oxalic acid and citric acid had a tendency of being increased in case of high circulating air volume. 4. In general, major aromatic compounds were increased through flue-curing. Relatively high content of solanone in case of lower air volume and less leaf loading were observed, while megastig matrienone was increased when leaf loading was small. 5. The more circulation air volume with leaf loading quantity caused lowering equilibrium moisture content and higher shatter index, which resulted in poor quality of cured leaves based on quality index, nitrogen number, taste index phillips index, and sugar-nicotine ratio.

  • PDF

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.