• 제목/요약/키워드: Quantitative Performance Assessment

검색결과 240건 처리시간 0.025초

수소충전소 성능평가 장비 안전성 평가 연구 (Risk Assessment for Performance Evaluation System of Hydrogen Refueling Station)

  • 강승규;이동훈
    • 한국수소및신에너지학회논문집
    • /
    • 제33권3호
    • /
    • pp.232-239
    • /
    • 2022
  • This study performed qualitative and quantitative risk assessment of equipment for evaluating the protocol of hydrogen refueling stations and suggested measures to improve safety. Hazard and operability study was performed for qualitative risk assessment, and Hy-KoRAM was used for quantitative risk assessment. Through a qualitative risk assessment, additional ventilation devices were installed, simultaneous venting of the storage container was prohibited, and the number of repeated refilling of the evaluation equipment was identified to manage the number of fillings of the container. Through quantitative risk assessment, the area around the device was set as a restricted area when evaluating the station, and measures were suggested to reduce the frequency of accidents.

Data Governance 정량평가 모델 개발방법의 제안 (A Quantitative Assessment Model for Data Governance)

  • 장경애;김우제
    • 한국경영과학회지
    • /
    • 제42권1호
    • /
    • pp.53-63
    • /
    • 2017
  • Managing the quantitative measurement of the data control activities in enterprise wide is important to secure management of data governance. However, research on data governance is limited to concept definitions and components, and data governance research on evaluation models is lacking. In this study, we developed a model of quantitative assessment for data governance including the assessment area, evaluation index and evaluation matrix. We also, proposed a method of developing the model of quantitative assessment for data governance. For this purpose, we used previous studies and expert opinion analysis such as the Delphi technique, KJ method in this paper. This study contributes to literature by developing a quantitative evaluation model for data governance at the early stage of the study. This paper can be used for the base line data in objective evidence of performance in the companies and agencies of operating data governance.

과학 탐구 능력 향상을 위한 수행 평가 자료 개발 - 초등학교 3, 4학년용 자료 - (The Development of Performance Assessment Materials to Improve Scientific Inquiry Skills - Focused on the Third and Fourth Grades in Elementary School -)

  • 맹희주;손연아;채동현
    • 한국초등과학교육학회지:초등과학교육
    • /
    • 제27권4호
    • /
    • pp.399-419
    • /
    • 2008
  • The purpose of this study was to develop performance assessment materials of scientific inquiry skills on 62 scientific activities in elementary science textbook for third and fourth grades. For this study, a total of 318 elementary teachers were sampled and surveys were carried out to examine the status of performance assessment of scientific inquiry skills in school. The classification system of assessment methods by Hart(1994) was also analyzed to create assessment strategy of scientific inquiry skills for elementary school students. Based on the quantitative data analysis, literature study and existing performance assessment materials analysis, performance assessment materials were developed and applied to science classes for third and fourth grades. Teachers and students were interviewed after the classes for asking about merits and improvements and the performance assessment materials were revised.

  • PDF

도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 - (Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system -)

  • 유지오;신현준;김종원
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.

  • PDF

고속도로 교통안전시설물의 정성적 및 정량적 위험도분석 연구 (A Study of Qualitative and Quantitative Risk Assessment for Highway Safety Facilities)

  • 지동한;오영태;최현호
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.99-109
    • /
    • 2007
  • 교통시설물의 위험요소는 안전피해의 규모 및 종류 등 복잡한 제반요소에 영향을 받기 때문에 안전개념에 기초한 분석이 요구된다. 이를 위해 본 연구에서는 교통안전시설에 대한 정성적 및 정량적 위험도분석 방법을 제시하고 이를 가치평가에 도입할 수 있는 절차를 제안하였다. 또한 정량적 분석을 위해 교통사고 데이터 및 이를 분석한 EPDO(Equivalent Property Damage Only)를 이용하여 사고빈도와 피해정도 및 사고요인별로 Event Tree를 작성하여 제시하였으며 이를 이용하여 중앙분리대 비교 1안(140cm) 및 비교 2안(127cm)에 대한 위험지수를 산정하였다.

초등학교 과학 수업에서 활용할 수 있는 과학 탐구 능력 수행 평가 자료 개발 (Developing Performance Assessment Materials on Scientific Inquiry Skills for Elementary School Students)

  • 채동현;손연아;맹희주
    • 한국초등과학교육학회지:초등과학교육
    • /
    • 제26권3호
    • /
    • pp.341-358
    • /
    • 2007
  • The purpose of this study was to develop performance assessment materials of scientific inquiry skills on sixty scientific activities in elementary science textbook for fifth and sixth grades. For this study, a total of 500 elementary teachers were sampled and surveys were carried out to examine the status of performance assessment of scientific inquiry skills in school. The classification system of assessment methods by Hart(1994) was also analyzed to create' assessment strategy of scientific inquiry skills' for elementary school students. Based on the quantitative data analysis and literature study, performance assessment materials were developed and applied to science classes for fifth and sixth grades. Teachers and students were interviewed after the classes for asking about merits and improvements and the performance assessment materials were revised. This study can provide elementary school teachers with reliable sources for performance assessment of scientific inquiry skills utilized in their science classes.

  • PDF

공동주택 리모델링 성능등급 개발방향 설정 (Development Strategies for Existing Apartment Housing Remodeling Performance Grading Indication System)

  • 백정훈;김수암;양현정
    • 한국주거학회논문집
    • /
    • 제27권4호
    • /
    • pp.23-32
    • /
    • 2016
  • The necessity of remodeling performance grading system is getting increased for the systematic management of existing housing stock, providing the resident's right to know and promoting the remodeling projects. A quantitative and objective evaluation method that has reflected the characteristics of remodeling must be developed because there is an aspect of having difficulty of assessment by an ordinary person as remodeling performance contains specialized details while the difficulty of applying the criteria of new buildings in terms of assessment items, criteria and methods. Accordingly, this study sets the goal as setting up the development objectives of performance grading system that has considered the remodeling characteristics. This study has analyzed the various assessment systems related to the domestic apartments as well as setting up the organization system of the remodeling performance grading system, perspectives of performance assessment and scope of assessment through literature, etc. It has also established the principles for setting up the assessment items of remodeling performance grade to present the directions for setting up assessment items and criteria.

Market Expansion Strategies for Small or Medium-sized Construction Companies by Developing Quantitative Risk Assessment Model

  • Yoo, Jinhyuk;Koh, Seungyoon;Seo, Induck;Cha, Heesung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.742-743
    • /
    • 2015
  • Korean construction industry has developed with national economy growth for a couple of decades. However, because of slump of real estate, the domestic construction industry was intimidated. In this situation, many construction company has no choice but to go abroad to find construction projects. However, almost small or medium-sized construction companies are very hard to operate their business because they have small funding ability and weak labor power. Therefore, this study aims to propose an assessment tool through analyzing risk factors of overseas construction projects for small or medium-sized companies by examining preceding research and interviewing industry experts. Weights of the risk factors are determined through the surveys of the industry practitioners. All of the data is configured into the assessment tool and this converts the quantitative information which leads to the optimal of strategies choice. This paper provides a quantitative measurement of possible performance and detailed assessment of each itemized risk factors. This assessment tool is qualified for industry experts so that it can safely be applied to the future projects. Ultimately, many small or medium sized construction companies will benefit from the tool proposed in this study to examine the potential of the overseas market expansion.

  • PDF

지진위험도평가 방법을 이용한 내진성능관리 의사결정 (Decision Making of Seismic Performance Management Using Seismic Risk Assessment)

  • 김동주;최지혜;김병화
    • 한국지진공학회논문집
    • /
    • 제23권6호
    • /
    • pp.329-339
    • /
    • 2019
  • The strategy for the management of earthquakes is shifting from post recovery to prevention; therefore, seismic performance management requires quantitative predictions of damage and the establishment of strategies for initial responses to earthquakes. Currently, seismic performance evaluation for seismic management in Korea consists of two stages: preliminary evaluation and detailed evaluation. Also, the priority of seismic performance management is determined in accordance with the preliminary evaluation. As a deterministic method, preliminary evaluation quantifies the physical condition and socio-economic importance of a facility by various predetermined indices, and the priority is decided by the relative value of the indices; however, with the deterministic method it is difficult to consider any uncertainty related to the return-year, epicenter, and propagation of seismic energy. Also this method cannot support tasks such as quantitative socio-economic damage and the provision of data for initial responses to earthquakes. Moreover, indirect damage is often greater than direct damage; therefore, a method to quantify damage is needed to enhance accuracy. In this paper, a Seismic Risk Assessment is used to quantify the cost of damage of road facilities in Pohang city and to support decision making.

BF 인증기준의 바닥 안전성에 관한 정량적 평가지표 검토 (A Review of the Quantitative Evaluation Indexes of Barrier-Free Certification for Floor and Ground Surfaces Safety)

  • 지석원;백권혁;최수경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.27-28
    • /
    • 2021
  • For Barrier-Free certification, the floor and ground surfaces must be finished with materials that are not slippery, flat, and have low-impact in fallis. However, the BF Certification Act does not provide specific methods to meet these regulations. In performance-based design, the responsibility of proving the performance rests with the building owner and architect, so quantitative evaluation indexes are needed to select suitable materials. Furthermore, changes in performance after completion should be checked periodically in 'As-Is' conditions. There are various methods for slips, trips and falls risk assessment, causing confusion for users. In this study, the results of previous studies on the evaluation methods of slips, trips and falls were considered closely, and each quantitative evaluation index that can be used in the new construction and maintenance phase was presented.

  • PDF