• Title/Summary/Keyword: Quality Plans

Search Result 1,006, Processing Time 0.025 seconds

Plans for Cadastral Information Quality Improvement (지적정보 품질 수준의 향상 방안)

  • Hong, Sung-Eon
    • Journal of Digital Convergence
    • /
    • v.13 no.2
    • /
    • pp.185-192
    • /
    • 2015
  • This study was conducted to identify how cadastral information quality is managed at which level by reviewing the current cadastral information creation and quality management methods. In addition, relevant issues were deducted and, based on the results, plans for cadastral information quality improvement were suggested. The study results are as follows. As a result of reviewing the cadastral information quality management and its level and deducting the relevant issues, it was found that current cadastral information quality management is confined to positional accuracy, instead of comprehensive quality management embracing graphic and attribute information. In addition, it appeared that the quality measurement elements for spatial information quality management recommended by the International Standard Organization (ISO 19113) are not reflected enough. In this study, a plan of quality management at an international level, plan for introducing a quality test process, and plan for organizing an independent quality test organization were suggested as improvement plans for this corresponding issues.

A Suitability Analysis on the legal standards of the Rural Housing Standard Plans (농촌주택 표준설계도의 관련 법적 기준에의 적합성 분석 연구)

  • Jeon, Young-Hoon;Shin, Doo-Sik
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.15 no.4
    • /
    • pp.1-8
    • /
    • 2013
  • The Rural Housing Standard Plans for improving the quality of life and housing stability in rural areas has been developed 87 types from 1994 to 2012. However, some types of Plans do not satisfy the current legal standard in accordance with social and legal changes. Standard plans has the same effect as a building permit, and replace it, so legal suitability of Plans is an important. Therefore, it is required the suitability analysis on the legal standards of Rural Housing Standard Plans. The Purpose of this study is to derive improper types and items of the Rural Housing Standard Plans on the legal standards. In this study, we analyzed its suitability on the legal standards(law on fire-fighting system installation and safety management, energy saving design criteria for buildings, structural checklist for small buildings, the types of drawing for building permit) in accordance with "rules for the operation of standard plans". And we analyzed the utilization of the Rural Housing Standard Plans through downloads from welchon portal.

Optimal Inspection Policy By Fuzzy Goal Programming (Fuzzy Goal Programming을 이용한 최적 검사 정책)

  • 유정상
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.185-191
    • /
    • 1995
  • In this research, a mathematical programming model is developed for the economic modeling of sampling plans based on two evaluation criteria : the outgoing quality and the average total inspection cost A fuzzy goal programming model and its solution procedure are proposed for the managers whose management objectives on the two evaluation criteria are not rigorous. To study the sensitivity of quality characteristic dependence on the resulting inspection plans, a numerical example is solved several times for a dependent model.

  • PDF

Machine Quality Assurance and TPM in FA System (FA 시스템에서의 품질보전과 TPM)

  • 유정상;황의철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.15 no.25
    • /
    • pp.75-82
    • /
    • 1992
  • Standard acceptance sampling plans models the production pricess as a sequence of independent identically distributed Beruoulli random variables. However, the quality of items sampled sequentially from an ongoing production process of ten exhibits statistical dependency that is not accounted for in standard acceptance sampling plans. In this paper, a dependent production process is modelled as an ARMA process and as a two-state Markov chain. A simulation study of each is performed. A comparison of the probability of acceptance is done for the simulation method and for the approximation method.

  • PDF

Optimal Inspection Model for Dependent Product Quality (종속품질의 최적검사 수리모형)

  • 유정상
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.47
    • /
    • pp.101-112
    • /
    • 1998
  • Recently, researchers show growing interest on product quality characteristic dependence and designing acceptance sampling plans under the quality dependence. This research intends to resolve a few theoretical and practical questions for better application of acceptance sampling when the quality characteristic of product items exhibits a statistical dependence and samples are inspected according to the production order. In this research, a mathematical programming model is developed for the economic modeling of sampling plans based on two evaluation criteria : the average outgoing quality(AOQ) and the average total inspection cost. An efficient solution procedure is then proposed using the functional structure of the two evaluation criteria and the procedure is numerically illustrated.

  • PDF

Enhancing value of quality assurance rounds in improving radiotherapy management: a retrospective analysis from King Hussein Cancer Center in Jordan

  • Khader, Jamal K.;Al-Mousa, Abdelatif M.;Mohamad, Issa A.;Abuhijlih, Ramiz A.;Al-Khatib, Sondos A.;Alnsour, Anoud Z.;Asha, Wafa A.;Ramahi, Shada W.;Hosni, Ali A.;Abuhijla, Fawzi J.
    • Radiation Oncology Journal
    • /
    • v.37 no.1
    • /
    • pp.60-65
    • /
    • 2019
  • Purpose: The quality assurance (QA) chart rounds are multidisciplinary meetings to review radiation therapy (RT) treatment plans. This study focus on describing the changes in RT management based on QA round reviews in a single institution. Materials and Methods: After 9 full years of implementation, a retrospective review of all patients whose charts passed through departmental QA chart rounds from 2007 to 2015. The reviewed cases were presented for RT plan review; subcategorized based on decision in QA rounds into: approved, minor modifications or major modifications. Major modification defined as any substantial change which required patient re-simulation or re-planning prior to commencement of RT. Minor modification included treatment plan changes which didn't necessarily require RT re-planning. Results: Overall 7,149 RT treatment plans for different anatomical sites were reviewed at QA rounds. From these treatment plans, 6,654 (93%) were approved, 144 (2%) required minor modifications, while 351 (5%) required major modifications. Major modification included changes in: selected RT dose (96/351, 27%), target volume definition (127/351, 36%), organs-at-risk contouring (10/351, 3%), dose volume objectives/constraints criteria (90/351, 26%), and intent of treatment (28/351, 8%). The RT plans which required major modification according to the tumor subtype were as follows: head and neck (104/904, 12%), thoracic (12/199, 6%), gastrointestinal (33/687,5%), skin (5/106, 5%), genitourinary (16/359, 4%), breast (104/2387, 4%), central nervous system (36/846, 4%), sarcoma (11/277, 4%), pediatric (7/251, 3%), lymphoma (10/423, 2%), gynecological tumors (2/359, 1%), and others (11/351, 3%). Conclusion: Multi-disciplinary standardized QA chart rounds provide a comprehensive and an influential method on RT plans and/or treatment decisions.

Selection Priority of Tributary Catchments for Improving Water Quality using Stream Grouping Method (하천그룹화 방법을 이용한 수질개선 하천유역의 우선순위 선정)

  • Cho, Byungwook;Choi, Jeongho;Yi, Sangjin;Kim, Youngil
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.1
    • /
    • pp.18-25
    • /
    • 2012
  • For effective watershed management, it is very important to select the tributaries through selection and concentration of targeted tributary catchments for improving water quality within the limited financial conditions. This study introduced the selection and diagnosis procedure of tributary catchments for improving water quality at Chungcheongnam-do based on water quality and flowrate monitoring, stream grouping method. The tributaries with high value of water quality and flowrate were selected for improving water quality according to stream grouping method. The diagnosis of selected tributaries for improving water quality was performed with analysis of the pollution load (generated, discharged, delivered) and point source discharged pollution load density. The plans for improving water quality of tributaries were suggested thorough various diagnosis of tributary catchments. For improving water quality of tributaries in Chungcheongnam-do, the tributary catchments in the Dangjin, Asan, Yesan, Cheonan, Hongseong area should be preferentially considered. The water quality improving plans for those tributary catchments, in accordance with the reduction of sources of pollution by population and livestock, should be established.

Revised KS Standards for Acceptance Sampling By Attribute Based On Continuous Sampling Plan (CSP를 응용한 연속생산형 계수이산 샘플링 검사)

  • Choi, Sung-Oon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.161-165
    • /
    • 2008
  • This paper introduces three continuous sampling plans by attribute. Revised KS standards for acceptance samplings such as KSA ISO 2859-3, 4 : 2001 and 21247 : 2007 are presented. These plans are based on skip-lot, DQL(Declared Quality Level) and VL (Verification Level).

  • PDF

Air Quality Assessment for Development Plan after the Special Act on Licensing of Industrial Complexes (산업단지 「인·허가 특례법」 이후 개발계획에 따른 국내 대기질 영향예측)

  • Moon, Nankyoung;Kim, Soontae;Seo, Jihyun
    • Journal of Environmental Science International
    • /
    • v.26 no.11
    • /
    • pp.1209-1222
    • /
    • 2017
  • On June 5, 2008, the "Act on Special Cases Concerning the Simplification of Authorization and Permission Procedures for Industrial Complexes" (Act No. 9106) was enacted. When it was implemented in August 2008, many industrial complex development projects were established, and the number of industrial complexes growth rates of 3-6% during 2003-2007 rose to around 15% in 2008. With the increase in industrial complexes, the environmental impacts of individual projects were examined, but comprehensive regional reviews of environmental impacts were not undertaken. In this study, we determined changes in air quality by applying the industrial complex development plan that completed the consultation at the end of 2010 to assess the comprehensive regional environmental impacts and presented the adequacy review plan for future industrial development plans based on the study's results. When considering these industrial complex development plans, emissions in North Jeolla and South Chungcheong Provinces and Daegu City have increased significantly. Air quality analyses showed that the 24 h mean $SO_2$ concentration in Daegu increased by more than 50% in summer compared to air quality concentrations in summer. The 24 h mean $PM_{10}$ and $NO_2$ concentrations increased by approximately 12 and 30%, respectively, in North Jeolla Province in summer. Areas exceeding the air quality standard for 1 h mean $O_3$ concentration increased by more than $3,500km^2$. Based on the above analysis, changes in air quality should be anticipated through a comprehensive evaluation of long-term development plans. Furthermore, control of air quality in accordance with the development of future industrial complexes is possible.

The Effect of Public PMO Service Quality on Customer Satisfaction and Reuse Intention (공공 PMO 서비스 품질이 고객만족과 고객충성도에 미치는 영향)

  • HYUNG-CHUNG, BACK;JA-HEE, KIM
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.2
    • /
    • pp.467-474
    • /
    • 2023
  • After the revision of the Software Promotion Act, small and medium-sized enterprises (SMEs) with little experience in e-government projects began to participate in public projects. Accordingly, the government introduced the public Project Management Office (PMO) in July 2013 to reduce the risks and secure the quality of informatization business, and the public PMO is still spreading. However, the public PMO service currently experiences sluggish business, such as low-priced orders, due to cut-throat competition, and thus needs improvement plans. In this research, we establish a research model for quality factors of public PMO services that can be considered for the improvement plans, measure and evaluate quality factors based on the model, and then analyze the impact of service quality on customer satisfaction and customer loyalty. For that, we measure quality factors using the SERVPERF model for those who have used public PMO services, establish a structural equation research model, and empirically analyze and evaluate the impact of quality factors. Lastly, we suggest improvement plans and implications for public PMO services.