A Study on the Types and Causes of Defects in Apartment Housing Information and Communication Work (공동주택 정보통신공사 하자 유형 및 원인에 관한 연구)

  • Park, Hyun Jung;Jeong, U Jin;Park, Jae Woo;Kang, Sang Hun;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.231-239
    • /
    • 2021
  • Entering the era of the fourth industrial revolution, information and communication technologies such as CCTV, home network systems and equipment are being used in the construction industry. In particular, in order to increase the autonomy of information and communication technologies in apartments, the government has announced an administrative revision of information and communication-related laws, and companies are focusing on developing technologies such as smart home services. In addition, most domestic and foreign studies on the information and communication work were mainly conducted on technology and management. However there is a lack of research on physical defects affecting the quality of ICT. Therefore, this study collected the defect data registered in the project management system of three domestic construction companies and classified them according to the standards of the Enforcement Decree of the Apartment House Management Act. According to the analysis of the frequency of defects work type, 88.10% of defects occurred in home network equipment work. In addition, analysis of defects type in the four detailed works showed the highest number of operation error. The cause was analyzed and prevention measures and countermeasures were presented in parts of design, construction, and maintenance. The results of this study will improve the quality of apartment housing and be used as basic data for future research on practical defect minimization and prevention measures.

A Framework for the IFC Interoperability Test Method to Support BIM (BIM 지원을 위한 IFC모델 호환성 검사 방법에 관한 기초 연구)

  • Kang, Hoon-Sig;Lee, Ghang;Shin, Yun-Ah
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.674-677
    • /
    • 2008
  • The Architecture, engineering, & construction (AEC) industry domains have grown more complex and larger, BIM is a digital representation of a building to facilitate the exchange and development of construction information integration and interoperability. Industry Foundation Classes (IFCs), under development by International Alliance for Interoperability (IAI), represent the part of buildings or elements of a process. IFC has been adopted as a central information repository in order to deliver integrated building information. Other BIM software could open the IFC file, recognize standard objects such as walls, window, and doors as building components. The IFC standard is generally agreed to be of high quality and is widely implemented in software. However, sometimes, information distortion or information toss occurrs during information exchang. The IAI Model Support Group (IAI-MSG) offers the opportunity to certify IFC-compliant applications based on a structuralized approach. However, IFC interoperability error also have occurred by using certificated tools. As project participants exchange BIM information by using BIM software they will need a reliable and efficient exchange of information. In this paper, previous interoperability tests were analyzed, and we propose a new concept in interoperability test.

  • PDF

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

A VE Incentive System for Construction Industry (건설VE 인센티브 제안)

  • Song, Yong-Chul;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1019-1022
    • /
    • 2007
  • Recent construction projects are becoming larger, more complex and higher rising. Accordingly, necessity of the VE is emphasized as more suitable for expense, function and quality. However, the VE is not functional because of difficulty of application process or of the methods in use in the field of construction. One of the alternative is to introduce the incentive system to activate the VE in the field of construction. By using the incentive system, employers can reduce the relevant project's prime cost and builders will maximize profit creation. In domestic case, they presented the systematic support policy 'Technical development compensation system' which is similar to the 1992 American's VE incentive system about builder's technical development effort but the result was not positive. This study investigates both domestic and other country's construction VE incentive system and reported problems in the construction VE incentive system to executives and construction VE experts. From this survey, conclusions were drawn about problems in the domestic construction VE incentive system's similarity system: 'Insufficiency of the construction VE incentive's article and standards', 'Insufficiency of the appraiser of the construction VE and of the full charge department' etc. I had interviews with the experts of the construction VE which were based on the above-mentioned problems and then presented 'Improvement of the construction VE's incentive system relevant law and system', 'Construction VE experts and construction formation' etc. for ways to bring acceptance of the construction VE in the construction industry.

  • PDF

Constructability Analysis of Green Columns at the Low Bending Moment Zone

  • Lee, Sung-Ho;Park, Jun-Young;Lim, Chae-Yeon;Kim, Sun-Kuk
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.12-19
    • /
    • 2013
  • Green Frame is an environmentally friendly column-beam system composed of composite PC members that can increase buildings' life spans while reducing resource consumption. Typically, connections of PC and RC columns occur at the boundaries of each floor, which is at the upper section of slabs, causing the boundary of each floor to generate the maximum moment. Although it is not optimal in terms of structural safety to connect members at a location where the moment is high, this approach is highly adopted due to its constructability. We propose that a superior approach that employs the concept of connecting columns at the low bending moment zone can be applied to quickly and safely install green columns, the main structural members of Green Frame. Connection of green columns at the low bending moment zone can be classified into three techniques, depending on the method of reinforcing the joints, which have different connection characteristics and construction methods. Research is needed to compare the features of each method of reinforcing the joints so that the most appropriate column connection method can be chosen for the site conditions. This study aims to confirm the structural safety of the connection component at the low bending moment zone and to compare and analyze the construction duration, unit price, quality and safety performance of each column connection method. The study results are anticipated to activate the use of composite precast concrete and to be used as development data in the future.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

A Fundamental Study on the Causes of Defects in Landscape Construction Projects Based on the Ratio of In-House and Supplied Materials -Focused on Incheon Metropolitan City- (조경공사업에서 관급자재·사급자재 비율에 따른 하자 원인에 대한 기초연구 -인천광역시 사례를 중심으로-)

  • Sang-Won Hwang;Sung-Jin Yeom;Chung-In Park
    • Journal of Environmental Science International
    • /
    • v.32 no.11
    • /
    • pp.821-831
    • /
    • 2023
  • Recently, landscaping construction has played a significant role in enhancing the quality of life for citizens by creating and maintaining outdoor spaces. However, landscaping projects vary in material procurement depending on the contracting method, and they also present various challenges in defect occurrence and defect rectification due to their specialized nature. In this study, we classified different types of projects based on material procurement ratios and conducted on-site assessments of defect status by specific processes. We also analyzed the itemization of material ratios and defect rectification costs. The results revealed it was found that projects with a higher proportion of government-provided materials had the poorest defect status in terms of planting works and also incurred the highest defect rectification costs. Moreover, conflicts concerning the responsibility for defects arose. Currently, there are no specific guidelines for setting standards for the proportion of government-provided materials in landscaping construction contracts. Furthermore, there is ambiguity in the management of defect rectification. Therefore, it is necessary to establish a systematic landscaping construction contracting framework by providing institutional guidelines tailored to local governments or the circumstances of contracting entities and to conduct thorough reviews of construction processes.

A Framework of Automating Inspection Task Generation for Construction Projects (건축 시공단계 검측 업무 자동 생성을 위한 프레임워크 개발)

  • Jo, Seuckyeon;Lee, Jin Gang;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.40-50
    • /
    • 2023
  • Quality control (QC) is an essential work for the successful construction project execution. Recently, robust application of ICT to the QC tasks leads to utilizing innovative technologies and equipment. However, overall planing of QC works needs to take place before applying new technologies to each and individual QC task. The objectives of this research involve developing a database and an algorithm that identifies QC tasks and related information upfront. In addition, the researchers developed a methodology to generate inspection tasks in conjunction with construction work tasks. The Korean Ministry of Land and Transportation provides standard supervision checklists. They were classified based on criteria of inspection items, methods, period and the scope. Reinforced concrete work was selected as a case study for validation of the method. This framework can function when planing construction tasks with any type of planning tools and innovative technologies. The researchers expect this framework may contribute to various construction projects when developing QC plans and tasks with applicable technologies.

Development of Detailed Design Automation Technology for AI-based Exterior Wall Panels and its Backframes

  • Kim, HaYoung;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1249-1249
    • /
    • 2022
  • The facade, an exterior material of a building, is one of the crucial factors that determine its morphological identity and its functional levels, such as energy performance, earthquake and fire resistance. However, regardless of the type of exterior materials, huge property and human casualties are continuing due to frequent exterior materials dropout accidents. The quality of the building envelope depends on the detailed design and is closely related to the back frames that support the exterior material. Detailed design means the creation of a shop drawing, which is the stage of developing the basic design to a level where construction is possible by specifying the exact necessary details. However, due to chronic problems in the construction industry, such as reducing working hours and the lack of design personnel, detailed design is not being appropriately implemented. Considering these characteristics, it is necessary to develop the detailed design process of exterior materials and works based on the domain-expert knowledge of the construction industry using artificial intelligence (AI). Therefore, this study aims to establish a detailed design automation algorithm for AI-based condition-responsive exterior wall panels and their back frames. The scope of the study is limited to "detailed design" performed based on the working drawings during the exterior work process and "stone panels" among exterior materials. First, working-level data on stone works is collected to analyze the existing detailed design process. After that, design parameters are derived by analyzing factors that affect the design of the building's exterior wall and back frames, such as structure, floor height, wind load, lift limit, and transportation elements. The relational expression between the derived parameters is derived, and it is algorithmized to implement a rule-based AI design. These algorithms can be applied to detailed designs based on 3D BIM to automatically calculate quantity and unit price. The next goal is to derive the iterative elements that occur in the process and implement a robotic process automation (RPA)-based system to link the entire "Detailed design-Quality calculation-Order process." This study is significant because it expands the design automation research, which has been rather limited to basic and implemented design, to the detailed design area at the beginning of the construction execution and increases the productivity by using AI. In addition, it can help fundamentally improve the working environment of the construction industry through the development of direct and applicable technologies to practice.

  • PDF

A Study on a Rhabilitation Design, Decision Making and Housing Management Policies for Reuse of Deteriorated Apartments in Korea (노후아파트 재활용을 위한 건축디자인 의사결정 및 관리정책 연구)

  • Shon, Seung-Kwang;Cho, Hyung-Geun;Cho, Sun-Chul;Choi, Il
    • Journal of the Korean housing association
    • /
    • v.13 no.5
    • /
    • pp.77-88
    • /
    • 2002
  • This article deals the investigations how to solve the social deficiencies of deteriorate apartments, which is a half cycle of a building and it goes slum clearance and redevelopment. And this proposes an active remodeling and design strategy, management, and housing policies for extending the usage of the resource. Most of apartment housing in Korea is built by the panel wall and slab structure system fur economic price. To remake is possible, even though not designed in flexibility and variation. The remodeling strategies are dwelling unification, transformation of two units to one or three units, addition of a room, changing into commercial and community required spaces, and reshaping of a envelop and facade by addition of a dwelling or dwellings, roof floors, change of materials and colors, and so on. And, all activities in structural aspect are proposed removal in upper part and addition in lower part of an apartment housing. Active remodeling cost a great deal compare to new construction, so any remodeling activities should be based on a minimal interfere and budgets to enhancing the quality in existing building. The final aim of an active remodeling is to enhance the quality in economic values, and to keep original state and to put on the new one in a small part. To promote the active and careful management and rehabilitation, it is necessary to give the positive incentive in terms of architectural law, bank loan, and any redevelopment project should get the remodeling record in national resources.