• Title/Summary/Keyword: Quality Management Process

Search Result 3,300, Processing Time 0.039 seconds

A Study on Process Innovation through Quality Management Diagnosis Model (품질경영진단모델을 통한 프로세스 혁신에 관한 연구)

  • Kim, Jong-Guk;Yu, Jin-Sam;Kim, Chang-Eun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.547-559
    • /
    • 2012
  • This thesis introduced a model of diagnosing a company's quality management, and a process of achieving quality innovation based on the model. As for study methods, books and theses related to quality and process innovation were collected for investigation, a survey on internal employees to investigate major issues of quality and standard consciousness was conducted, and 5DP was discussed for balanced process analysis.

  • PDF

A Study on the Relationship of Process Quality, Outcome Quality, and Management Performance - Combination of Service Quality and BSC Concept for Insurance Industry - (과정품질, 결과품질, 경영성과 연계 연구 - 보험산업의 서비스품질과 BSC 연계모형을 중심으로 -)

  • Kim, Hyung-Wook
    • Journal of Korean Society for Quality Management
    • /
    • v.37 no.4
    • /
    • pp.43-51
    • /
    • 2009
  • This study was designed to analyze the relationship of process quality, result quality and management performance in Korean insurance industry. For this study the linkage scheme of service quality concept is used on PZB model and BSC(Balances Score Card) system. In the linkage model, the 5 service qualitry factors used in PZB model are used as the result quality variables, and internal process factor, learning/growth factor in BSC are used the process quality variables affecting the result quality variables. And also customer satisfation factor and financial performance index are used as the management performance variables. In the ivsurance industry, the process quality variables were verified to meaningfully affect the result quality variables, and the result service quality variables were verified to affect the management performance indices. As the result, the process quality and the service quality must be emhanced for the competitiveness of Korean insurance industry.

The Process Reference Model for the Data Quality Management Process Assessment (데이터 품질관리 프로세스 평가를 위한 프로세스 참조모델)

  • Kim, Sunho;Lee, Changsoo
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.4
    • /
    • pp.83-105
    • /
    • 2013
  • There are two ways to assess data quality : measurement of data itself and assessment of data quality management process. Recently maturity assessment of data quality management process is used to ensure and certify the data quality level of an organization. Following this trend, the paper presents the process reference model which is needed to assess data quality management process maturity. First, the overview of assessment model for data quality management process maturity is presented. Second, the process reference model that can be used to assess process maturity is proposed. The structure of process reference model and its detail processes are developed based on the process derivation approach, basic principles of data quality management and the basic concept of process reference model in SPICE. Furthermore, characteristics of the proposed model are described compared with ISO 8000-150 processes.

A Study on Process Innovation of Strategy plan (프로세스 혁신 전략수립 방안에 대한 연구)

  • Kim, Jong-Guk;Kim, Kil-Hwan;Son, Chul-Min;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.153-160
    • /
    • 2011
  • This thesis introduced a model of diagnosing a company's quality management, and a process of achieving quality innovation based on the model. As for study methods, books and theses related to quality and process innovation were collected for investigation, a survey on internal employees to investigate major issues of quality and standard consciousness was conducted, and 5DP was discussed for balanced process analysis.

A study on establishing a ISO 9001:2000 Quality Management System using information technology (정보기술을 이용한 ISO 9001:2000 품질경영시스템 구축)

  • Kim, Sang-Kuk;Shin, Sung-Ho;Lee, Young-Sei;Chung, Taek-Young
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.2
    • /
    • pp.13-21
    • /
    • 2005
  • Most organizations adopt a process-based approach to manage their operations and now business process management(BPM) is a well-established concept. Because ISO 9001:2000 has been influenced by BPR and it also emphasizes process based, BPM can get together with ISO 9001:2000. Korea Institute of Science and Technology Information has taken ISO 9001:2000 certificate in November 11, 2003 and now implements quality management systems based on BPMS. We call it KQMS(KISTI Quality Management System). KQMS based on BPMS is a new example in field of ISO quality management and is expected to support process management well.

A Case Study for Quality Improvement Process for the PCB Manufacturing (PCB 제조에 있어서의 품질개선 사례 연구)

  • 진홍기;백인권;손기목;서정원
    • Journal of Korean Society for Quality Management
    • /
    • v.26 no.2
    • /
    • pp.106-117
    • /
    • 1998
  • The following study has been undertaken to build QIP (Quality Improvement Process) of an inner-layer process in a PCB (Printed Circuit Board) manufacturing plant. The objective of the study is stabilization and optimization of the process through quality improvement. To do that, defective factors in process are gathered by the cause and effect analysis and classified by PFD (Process Flow Diagram), key factors are found out by PFMECA (Process Failure Mode and Effect Criticalty Analisis), DOE(Design of Experiments) is a, pp.ied to those key factors to optimize the process, SPC (Statistical Process Control) chart is used to maintain the optimal conditions of the process and to improve quality continuously, and a quality management system is developed to improve quality mind and quality system for the PCB jmanufacturing plant. Overall, QIP is established to improve quality for the PCB manufacturing plant in the study.

  • PDF

National Process of Quality Management Education : The Swedish Example

  • Isaksson, Raine;Hansson, Jonas;Garvare, Rickard
    • International Journal of Quality Innovation
    • /
    • v.8 no.2
    • /
    • pp.88-99
    • /
    • 2007
  • The application of a process view, as complement to the traditional functional division, is often a way to highlight organisational improvement potential. This paper examines the process of providing university level education in quality management, using Sweden as an example. The purpose is to assess the performance of university education as part of the supply chain of providing quality management to a society. This has been done by studying the actual offering compared to a notional benchmark of best performance. Preliminary results indicate that there could be a significant improvement potential in both providing more education of the right type and in the right way. A lot of similar basic courses are given but with varying names, possibly reflecting difficulties in defining the area of quality management and its constituents. An important reason for the detected improvement potential seems to be the lack of ownership of the studied supply chain of providing university level quality education to the Swedish society.

Causal Relationship of Infra, Process and Firm Performance on Supply Chain Quality Management (모기업과 협력기업의 공급망 품질경영 인프라(Infra), 프로세스(Process), 성과(Performance)간 인과관계 연구)

  • Park, Ji-Young;Oh, Soo-Jung;Kim, Soo-Wook
    • Journal of Korean Society for Quality Management
    • /
    • v.39 no.4
    • /
    • pp.464-479
    • /
    • 2011
  • The purpose of this study is that analyzing the causal relationship between Infra, Process and Performance of companies which are executing the Supply Chain Quality Management(SCQM) with their subcontractors and partners. Korean Standards Association(KSA) provides the Supply Chain Quality Management Model and Quality Collaboration Index for 4 years, but a few study has investigated the critical variables and their causal relationship to organizational performance. Therefore we examine the SCQM model and related index and choose the quality, human resource and risk management processes for identifying the path to organizational performance. In addition, exploratory factor analysis is conducted for figuring out the major factors among the 3 processes. Structural Equation Model are successively used for determining which characteristics of the infra and processes are the most critical variables to performance. The data was collected from KSA and composed of 52 companies and 346 their partners. The result shows that risk management process has no significant effect on the organizational performance and pre-production process collaboration.

A Study on the Developing Process and Characteristics of Korean Quality Management System

  • Park, Chae-Heung
    • International Journal of Quality Innovation
    • /
    • v.5 no.2
    • /
    • pp.122-131
    • /
    • 2004
  • Because of three reasons: rare natural resources, high dependent ratio and rapid wage increases, Korea must take the non-price competitive strategy. The developing process of quality management system in Korea can be categorized into five stages according to changes in economic policy. In order to develop the Korean quality management system effectively, we should try to connect total quality management with management system and emphasize the training and education.

Development of Web-based Process Management System for Spatial Data Construction (웹기반의 공간데이터 구축공정 관리시스템 개발)

  • Choi, Byoung-Gil;Kim, Sung-Soo;Cho, Kwang-Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.63-70
    • /
    • 2006
  • This study aims to development of web-based process management system for spatial data construction. For developing this system work classification of basic surveying was standardized and quality management method for spatial data was established. Production process and work classification system for basic surveying such as control point surveying using GPS, leveling, aerial photographing, digital mapping, topographic mapping, digital elevation modeling, aerial photographic DB construction and digital orthophotomap was standardized. The status of the output and quality inspection for basic surveying project were analyzed, and the elements of quality inspection and data format for the type of outputs were analyzed. Based on standardized and analyzed contents, web-based process management system was developed after database and process was designed. The process management system consisted of process management, quality control, metadata management, and system management.

  • PDF