• Title/Summary/Keyword: Quality Management Capability

Search Result 414, Processing Time 0.03 seconds

Evaluation on the Relationship between Software Engineering Level and Schedule Deviation in Software Development (SW 공학수준과 SW 프로젝트 납기성과와의 관계)

  • Kim, Seung-Gweon;Ko, Byung-Sun
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.191-204
    • /
    • 2011
  • Recently, many software companies are trying to improve the software quality and project outcome with more costs and efforts in development time. In the software convergence and integration environments, it is required efforts to gain high quality of software. In other words, it is required to utilize software engineering knowledge and technology for higher software quality and better software project productivity. The Software development productivity can be varied by software process capability according to building a framework for software development, selection and use of appropriate technology, human resource management. Software process capability will influence software project outcome which is the general opinion. This study provides empirical evidence about software engineering efforts and investment approach to lead software project performance. We measured the software engineering efforts by SW engineering level and analyzed the corelation between software engineering level and schedule deviation. And, we verified that this performance is affected by the size of software company. As a result, software process capability is important to build a infrastructure and develop systematically software project. The higher software engineering level can lead to improved software project performance.

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF

A Study on some Effective Applications of Project Control for Product Quality Improvement (제품(製品)의 품질향상(品質向上)을 위한 설비관리(設備管理)의 효율적운용(效率的運用)에 관한 고찰(考察))

  • Ha, Jeong-Jin;Lee, Yeong-Jeong
    • Journal of Korean Society for Quality Management
    • /
    • v.13 no.2
    • /
    • pp.37-47
    • /
    • 1985
  • There are several productive maintenance problems that are closely concerned with product quality. In these problems, we have process capability, out-worn equipment problems, plant layout planning, maintenance cost, investment decisions and so on. These problems are analyzed, and some conceptial and applicable systems are developed in this paper. The purpose of this paper is to define that in productive maintenance problems awaiting solution is a necessary condition for improvement on product quality, quality assurance and product liability prevention at this time, and to find an applicable total system.

  • PDF

An Organizational Maturity Assessment Model for Public Data Quality Management (공공데이터 품질관리를 위한 조직 성숙도 평가 모델)

  • Kim, Sunho;Lee, Changsoo;Chung, Seungho;Kim, Hakcheol;Lee, Changsoo
    • Informatization Policy
    • /
    • v.22 no.1
    • /
    • pp.28-46
    • /
    • 2015
  • Although the demand for the use of public data increases in accordance with the expansion of Government 3.0, the poor level of data quality and its management currently implemented is becoming obstacles to opening data to the public. To improve the efficiency of management, linkage and usage for data, standardized processes for data quality management have to be prepared and appropriate data quality assessment criteria should be established. In this paper, we propose the organizational maturity model that can assess the public data quality management level. This model consists of the process reference model and the measurement framework. Fifteen processes grouped by the PDCA cycle are defined in the process reference model. The measurement framework measures the organizational maturity level based on process capability levels. The organizational maturity model can be used to establish objectives and directions for public data quality improvement by diagnosis of current level of public data quality management and problem solving. This model can also facilitate open to the private sector and activate usage of stable public data through reliability enhancement.

A Zoning Method for Forest Landscape Management by Visual Quality Assessment (시각적 질 평가에 의한 산림경관 관리구역 구획방법)

  • Lee, Gwan-Gyu;Park, Chan-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.1
    • /
    • pp.148-157
    • /
    • 2012
  • Korea, with 63.7% of the land being forests, has unique characteristics of forest landscapes coming into view for most residential areas and roads. This study was undertaken with a purpose of supporting forest landscape management by partitioning the areas that landscape management is needed. Through analysing the degree of forest landscape management needs and the visual absorption capability for landscape changes, the zoning process and method for landscape management were conducted. In order to select the areas that are managed by priority for landscape, the degree of forest landscape management needs was quantitatively analyzed with the main scenic sites, travel frequencies, major forest landscape resources, and areas with demand for walking and automobile travel as the basis. The visual absorption capability that means the visual acceptance capability against physical landscape changes of the designated areas was analyzed in order to select the areas that are suitable for artificial landscape management. As a result, it became possible to express the degrees of forest landscape management needs in high, middle, and low sub-areas, and the visual absorption capability in high, middle, and low sub-areas, for each of the three zones in terms of spaces in the forest landscape management areas. For example, among the forest landscape transition zones, if the degree of forest landscape management needs is high and the visual absorption capability is high, then aggressive landscape management would be possible; this would also mean that this area could accept certain levels of physical landscape changes. By applying zoning methods like these, it was possible to attain a conclusive result that proper means of landscape design and management of the forest landscape resources and the surrounding areas could be provided.

Development of evaluation model on PMIS function using CMM - Focused on Project Communication Management - (CMM개념을 활용한 건설 PMIS 평가 모델 개발 - 프로젝트 의사전달관리를 중심으로 -)

  • Park Jeong-Ha;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-463
    • /
    • 2002
  • The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports. A major problem for constriction companies is the lack of project assessing model for project management. One method of solving the problem is through the systematic management of construction processes. A development of model for assessing PMIS practice is attempting to develop a stepwise process assessment framework for the construction industry using Capability Maturity Model. This paper have provided further insights into the understanding of the framework, as well as its value for construction sector.

  • PDF

A Delphi Approach to the Development of an Integrated Performance Measurement and Management Model for a Car Assembler

  • Shawyun, Teay
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.3
    • /
    • pp.214-227
    • /
    • 2008
  • Today's dynamic competitiveness requires an organization to improve its performance measurement and management. Quality Management Systems (QMS) abound, the main ones being: ISO series, Malcolm Baldridge National Quality Award (MBNQA), European Forum for Quality Management (EFQM), Six Sigma Business Scorecard and the Balanced Scorecard. Based on the literature, the IPMMM (Integrated Performance Measurement and Management Model) identified 7 key synthesized factors: leadership, strategy management and policy, customer and market, learning and growth, partnership and resources, internal processes and business results that are employed to investigate the key performance indicators of a car assembler using the Delphi methodology. In the 2 rounds of Delphi panels consisting of 20 senior management personnel, the $1^{st}$ round of 198 indicators in the IPMMM yielded 90 indicators. The $2^{nd}$ round yielded 43 performance indicators with 18 rated as critical based on the % assigned in the $1^{st}$ and $2^{nd}$ priority rating of "very important factor" and "key performance indicator" that must be ranked high on both of the priorities. The very critical indicators appeared to be: defect percentage and first time capability (tie in $1^{st}$ place) and revenue, goal setting, customer satisfaction index, on-time delivery, brand image, return on investment, Claim Occurrence Ratio, and debt being ranked from $3^{rd}$ to $10^{th}$. It can be surmised that an organization can identify and develop an appropriate set of performance indicators through the Delphi methodology and implement and manage them based on the Balanced Scorecard.

Design of Process Support System based on CMMI (CMMI 기반 프로세스 지원 시스템 설계)

  • Choi, Dong-Hee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.3
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.

Quality of Service Control for IMT-2000 GPRS (IMT-2000 GPRS의 QoS 제어 방안)

  • 박현화;정동수;배건성
    • Proceedings of the IEEK Conference
    • /
    • 2000.11a
    • /
    • pp.437-440
    • /
    • 2000
  • In order to meet the different requirements of a wide variety of user applications, the network should support the different quality of service requirements for different applications. While 3GPP has specified a number of QoS profiles for a 3G-GPRS (or UMTS), the implementation of QoS management is an issue. This paper presents the QoS management functions in the 3G-GPRS. The QoS management involves service manager, translation function, admission/capability control, and subscription control of users, and mapping function, classification function, resource manager, and traffic conditioner of user traffic. It also describes the QoS Management procedure during the session management when setting up the bearers.

  • PDF

A Study on Service Quality and Consumer Satisfaction of Beauty Parlor (미용실의 서비스 품질과 소비자 만족에 관한 연구)

  • 황선아;황선진
    • Journal of the Korean Society of Costume
    • /
    • v.51 no.8
    • /
    • pp.171-183
    • /
    • 2001
  • The purpose of this study was to develop service quality dimension of beauty parolrs in seoul area. The subject consisted of 545 adults with ages ranged between 20 and 30 who had evaluated service qualify dimension on one of the three different types of beauty parlors in seoul. The beauty parlors were classify into three types. Type I is franchised one, type II is located in center of city and type III is close to consumer's residence area. The result was as follows : 1. Four dimensions of the service quality of the beauty parlor were physical aspects(tangibles·accessibility·cleanness), employee aspects(empathy·capability), policy aspects of beauty parlor (management·reputation·credit card), the skill of the hair stylist. 2. To predict comsumer satisfaction. service quality dimensions were as follows : In franchised beauty parlor, the employee aspects(empathy), the policy aspect (reputation), the skill of the hair stylist were should be considered. In beauty parlor in downtown area, Physical aspects(accessibility), the employee aspects(capability), the policy aspects(reputation), the skill of the hair stylist were should be considered. And the beauty parlor in residence area, the employee aspects(empathy), the policy aspects(reputation) were should be considered.

  • PDF